Person in high-visibility clothing beside a utility trench, with solar panels and wind turbines in the background.

Ordnance assessment for utility and energy projects

For utility corridors, energy installations and network hubs, we establish the available ordnance indicators and investigation results before groundworks. FONTANA-EOD plans suitable ordnance investigations according to location, construction depth, method and access. Send route and installation plans, intervention depths and construction phases so that services and evidence for trenches, crossings and foundations can be defined before the relevant groundworks.

Define the corridor

Structure the route, area and installation points.

Assign the construction method

Distinguish trenches, boreholes and foundations.

Assign results

Document sections and points unambiguously.

Route, installation and construction phase

Which ordnance assessment suits the route, installation and construction phase

Before trenching, drilling and foundation work, existing suspicion indicators and planned interventions are used to establish which ordnance investigations are needed. Route sections, crossings, stations and installation areas are considered by position, depth and construction method. Each area is assessed to determine which historical investigation, surface or deep-ground survey or construction-phase investigation is technically suitable. Results and unresolved zones are assigned to the relevant plan revision and construction section.

Project references

Selected project examples

References from project practice

Reference projects: utilities and energy

Utility and energy projects involve investigation of routes, foundations and individual intervention points. The map leads to our published references from these project settings.

10 places · 18 linked reference entries

Project information is loaded from the reference list.

Select a project location from the place selector or choose a point on the map.

Reference projects: utilities and energyLocations of published reference projects. Select a place to read the information from the central reference list. GermanyLuxembourgSchleswig-HolsteinHamburgLower SaxonyBremenNorth Rhine-WestphaliaHesseRhineland-PalatinateBaden-WürttembergBavariaSaarlandBerlinBrandenburgMecklenburg-Western PomeraniaSaxonySaxony-AnhaltThuringiaOberhausen – 1 reference entryXanten – 1 reference entryKöln – 2 reference entriesAachen – 2 reference entriesIserlohn – 1 reference entryDarmstadt – 2 reference entriesKoblenz – 3 reference entriesLandstuhl – 3 reference entriesSaarbrücken – 1 reference entryHangelar – 2 reference entries
Location reference for a projectPublicly recorded overhead lines · DLM250, 31.12.2025

The markers show official place centres. The associated references state the construction task, services performed and documented scope.

Map data: © GeoBasis-DE / BKG (2026), VG250 / GN250 / DLM250, dl-de/by-2-0; Luxembourg: ACT / data.public.lu, CC0. Geometries projected and simplified for display.

Routes, installations and network hubs

How the project type determines ordnance assessment

Each project type has its own combination of area, line, point and depth. Select the specialist field matching the planned construction and work volume.

Combined projects are structured by work volume rather than project name. A wind farm may, for example, include access roads, cable routes, substation equipment and storage; each element has its own interventions and evidence limits.

Person in high-visibility clothing beside a utility trench, with solar panels and wind turbines in the background.

Fibre optics and broadband rollout

Fibre-optic routes combine open trenches, trenching, directional drilling, chambers, distribution units and property connections.

Investigation results are assigned to the relevant corridor, construction method, depths and rollout section. Property-connection lots, POP sites and short-notice route revisions use the same section and point identifiers so that field services and civil-engineering crews work from an unambiguous data set.

The rollout is structured by deployment cluster and construction method so that open trenches, crossings and network hubs are not combined under a generic route statement.

Assess the fibre-optic rollout
Person in high-visibility clothing beside a utility trench, with solar panels and wind turbines in the background.

Solar farms and ground-mounted photovoltaics

Solar farms include posts, transformer stations, cable trenches, access roads, storage and assembly areas across large sites.

Area assessment and individual depth volumes are linked by construction section and foundation type. Construction roads, inverters, storage options and drainage areas are also included where relevant ground interventions or load transfer are planned.

The installation area, driven or screw-in points, cable trenches and transformer sites receive separate investigation geometries and a shared project status.

Assess the solar farm and construction areas
Person in high-visibility clothing beside a utility trench, with solar panels and wind turbines in the background.

Wind farms and wind turbines

Wind-energy projects combine deep foundations, crane pads, access roads, cable routes and geotechnical boreholes.

Each turbine position receives its own area, point and depth references for design and execution. Temporary assembly areas and permanent installation areas are documented separately because their interventions, depths and later uses differ.

Foundation, crane pad, access road and internal cable route are coordinated so that deep and area-wide work volumes remain unambiguous.

Assess the wind farm and turbine sites
Person in high-visibility clothing beside a utility trench, with solar panels and wind turbines in the background.

Power routes and underground cables

Underground cable projects consist of long corridors, joint bays, crossings, site-establishment areas and storage areas.

Chainage, trench geometry, ground intervention and sectional handover determine the ordnance assessment. Joint locations, crossing structures and varying laying depths receive their own identifiers so that the route assessment remains reliable through plan revisions and procurement by section.

Standard trenches, joint bays, crossings and construction roads follow the same chainage but are assessed using distinct methods.

Assess the power route and underground cables
Person in high-visibility clothing beside a utility trench, with solar panels and wind turbines in the background.

Gas and hydrogen pipelines

Pipeline construction includes pipe trenches, jacking works, welding areas, valve stations, access roads and temporary work strips.

For pipe trenches and individual structures, investigation areas are described with depth, working width and construction method. Launch and reception pits, valve locations and deep drilling corridors are not inferred from the general pipe-trench investigation but assessed as separate work volumes.

Work strips, pipe trenches, valve points and trenchless crossings each receive their own area and depth references.

Arrange specialist assessment of the pipeline corridor
Person in high-visibility clothing beside a utility trench, with solar panels and wind turbines in the background.

District heating and heat networks

District-heating routes often run through dense road and utility networks and require deep excavations in sections.

Existing services, trench support, chambers and property connections are checked against each construction phase. Traffic arrangements, trench support and short work cycles are coordinated early with ordnance assessment so that zones that cannot be measured are clarified before each excavation.

Dense existing services and sectional excavations require early coordination of utility information, measurability and excavation arrangements.

Prepare the district-heating route
Person in high-visibility clothing beside a utility trench, with solar panels and wind turbines in the background.

Water and wastewater pipelines

Water and wastewater projects range from utility trenches and chambers to inverted siphons and crossing structures.

Invert levels, sewer reaches, excavations and inaccessible sections receive separate evidence. Sewer reaches, chambers, pump connections and crossings remain linked unambiguously through invert level, chainage and construction section.

Chambers, sewer reaches, utility trenches and crossing structures are assessed according to invert level, construction condition and actual access.

Assess the water and wastewater route
Person in high-visibility clothing beside a utility trench, with solar panels and wind turbines in the background.

Substations and transformer stations

Substations combine area-wide installation zones with foundations, cable basements, gantries, earthing and incoming connections.

Operating conditions, the metallic environment and deep point interventions are considered before method selection. Cable basements, gantry foundations, transformers, operating roads and later expansion areas are included according to their construction and operating conditions.

Metal installations, earthing and existing assets can limit area measurements; the depth volume for foundations and gantries is considered separately.

Assess substations and transformer positions
Person in high-visibility clothing beside a utility trench, with solar panels and wind turbines in the background.

Battery and grid storage

Storage projects require installation areas, container foundations, transformer equipment, cable trenches and fire-safety distances.

Area, utility and foundation zones are assessed separately and combined for installation design. Container rows, transformer points, firefighting-water installations and cable feeds are planned as separate area and point tasks and then combined in a shared installation file.

Storage containers, transformers, cable routes and assembly areas are related to the current installation design and intended foundation.

Arrange specialist assessment of the storage site
From corridor selection to execution

Prepare investigations for design, procurement and construction

Comparing options requires different documents from tendering or imminent excavation.

Linear projects also include access roads, storage and assembly areas, intermediate storage, construction roads and temporary structures where ground intervention occurs. These ancillary areas may lie outside the actual route corridor and therefore need their own spatial assignment.

Corridor and site selection

Historical indicators, known finds, uses and existing information are related to route options and installation sites.

The assessment supports comparison and prioritisation of options without anticipating the technical investigation of the later intervention.

The early assessment shows which options could require additional investigation or clearance.

Compare suspected corridors

Design and approval planning

Alignments, work strips, chambers, pits, foundations, access roads and construction phases are translated into specific ground interventions.

Data gaps, inaccessible areas and technical interference zones are identified before quantity and schedule planning.

Plan changes are checked for their effect on corridors and point lists already investigated.

Assess the design stage

Procurement and lot formation

Areas, lengths, depths, methods, preparatory services, qualifications and evidence must remain comparable across lots and contractors.

Provisional items receive a clear trigger and an unambiguous spatial basis for quantities.

Consistent data formats and acceptance criteria support project-wide status and quality control.

Define the services and procurement basis

Open trenches and area construction

Standard trenches, assembly areas, installation fields and access roads are assessed by surface, ground and interference environment.

The measurement method must match the planned excavation depth and actual working width.

Measurement conditions and depths are documented for individual sections even when they are commissioned together.

Select area and trench assessment

Borehole, pile and deep point

Crossings, pylons, piles, anchors, chambers and geotechnical investigations require examination of the future depth volume.

Coordinates, target depth, diameter, direction and installation method provide the technical basis.

General area evidence does not automatically cover deep or inclined work volumes.

Assess deep spaces affected by the works

Construction condition that cannot be fully measured

Existing assets, traffic, operating installations and strong interference fields may restrict advance assessment.

For areas not sufficiently investigated, suitable additional methods and possible access after demolition or exposure are assessed. Necessary investigations and protective measures are planned before ground interventions during breaking out, demolition or creation of access.

Where construction-phase ordnance surveying is technically suitable, each working layer is technically surveyed and assessed. Controlled layer-by-layer removal and supplementary visual inspection follow; these steps are repeated down to the agreed excavation bottom. Excavation layers, stop points, authority to give instructions, communication channels and documentation are defined before work begins. Merely watching the excavator remove soil is not sufficient.

Coordinate construction conditions and excavation
Suspicion, geometry and evidence

Determine investigation requirements for individual sections

The suitable investigation depends on planned ground interventions and local measurement conditions. Areas, lines, points and depths are therefore assessed separately and combined in a shared status.

The assessment follows the current project decision. Preliminary design focuses on spatial prioritisation, whereas before construction, specific measurement areas, point lists, target depths and inaccessible areas must be defined unambiguously.

Corridor without historical assessment

Initial situation: The route or installation site lacks a reliable spatial basis for suspicion assessment.

Technical step: Historical sources and existing information are related to options, construction areas and priority sections.

Documentation objective: Suspected areas, data gaps and priorities remain linked to the corridor and plan revision.

Establish the historical basis

Accessible linear work volume

Initial situation: An open trench or work strip has a clearly defined width and depth.

Technical step: Target object, soil, surface and interference environment determine the suitable linear or area-wide method.

Documentation objective: Measurement coverage, interference zones and statement limits are related to chainage and subsequent excavation depth.

Assess the route section’s method requirements

Installation with substantial technical interference

Initial situation: Utilities, earthing, steel, reinforcement and operating equipment affect measurement data.

Technical step: Achievable conclusions, sub-areas and additional methods are defined before fieldwork.

Documentation objective: Interpretable and restricted zones are shown separately. Suitable further action is defined for unresolved areas.

Assess the installation area and interference environment

Deep crossing or foundation

Initial situation: The future work volume extends below the reliably investigated near-surface zone.

Technical step: Point, alignment or borehole geometry is investigated at depth according to position, target depth and installation method.

Documentation objective: Point and depth evidence can be transferred directly to borehole, pylon, pile or structure lists.

Investigate the geometry at depth

Area inaccessible in advance

Initial situation: Existing assets, traffic or a structure prevent sufficient investigation before execution.

Technical step: It is assessed which demolition stage permits suitable measurement access and whether additional methods are needed.

Documentation objective: Investigated layers and areas not dealt with are recorded traceably for site management and subsequent trades.

Prepare excavation and exposure

Anomaly or find situation

Initial situation: Measurement data or construction work indicate a need for further clarification.

Technical step: measurement anomalies are interpreted by specialists. If an unexpected suspicious object is found, work stops immediately and the competent authorities are notified without delay.

Documentation objective: Findings, processing and remaining action requirements are updated in the project file with precise location references.

Clarify the findings and handover process
Project file with area and route references

Hand over plans, measurement data and unresolved areas together

Utility and energy projects need documentation that connects long corridors, individual structures and phases separated in time within a consistent structure.

For corridors crossing federal-state, district or municipal boundaries, regional documents and responsibilities are maintained within a shared project structure. This keeps clear which statement applies to which section and local procedural stage.

Project and location basis

Route alignments, installation areas, work strips, point lists, construction sections and plan revisions provide the spatial reference.

Coordinate systems and identifiers are used consistently in design, fieldwork and reports.

The geometry structure supports links with GIS, construction progress and operator documents.

Suspected hazard and source evidence

Historical assessments, information from authorities, old documents and known finds are documented with their scope.

Unresolved sources and contradictory statements remain visible as specific clarification tasks.

Historical assumptions, technical measurements and actual finds remain technically distinct.

Methods and working conditions

Measurement system, grid, lines, investigation depth, surface, soil, access and interference sources are recorded by section.

For drilling and excavation, point geometry, casing, layers and construction equipment are also included.

Acquisition conditions form part of the assessment and therefore of subsequent usability.

Measurement data and findings register

Measurement lines, borehole positions, anomalies, exposures and field observations receive unique identifiers.

Data, maps, lists and records must cross-reference one another.

A consistent register supports quantities, quality control and handovers across multiple lots.

Restrictions and unresolved areas

Inaccessible zones, zones affected by technical interference and zones outside the investigation depth are identified spatially.

The required follow-up service is defined for each area before intervention.

Unresolved zones receive a specific spatial task rather than a general reservation.

Report and section handover

The report describes the area, linear and depth volumes actually dealt with and the project status achieved.

Later plan changes and additional points are checked against this status.

The conclusion remains limited to the documented scope of work.

From corridor selection to handover

Schedule investigation and result handover within construction

The sequence is adapted to design maturity, approval, construction method and section priorities. Investigation results must be available in good time for each construction section.

Ordnance assessment is coordinated with approval, procurement and construction schedules. Preparatory services and decision dates are prioritised so that fieldwork does not begin only after civil-engineering crews have mobilised.

01

Record the project type and work volumes

Route, installation, structures, depths, construction phases and required decisions are taken from the current plan revision.

Areas, lines and points are maintained within a shared project structure.

02

Review records and the suspected hazard

Historical assessments, information from authorities, utility data, geotechnical documents and earlier reports are organised.

Missing information receives a specific acquisition or clarification task.

03

Represent interventions spatially

Work strips, trenches, crossings, foundations, chambers, boreholes and assembly areas are described unambiguously.

Different construction methods are not grouped under a generic investigation depth.

04

Define services and methods

Historical assessment, surface surveys, deep investigation and excavation supervision are combined according to the work volume.

Methods are selected according to technical suitability and the conclusion required.

05

Prepare deployment and construction phases

Access, surveying, traffic or operating conditions, equipment, stop points and data flows are coordinated.

Short construction windows are prepared organisationally without reducing technical quality.

06

Carry out field services

Measurements, point assessments and construction-phase services are carried out with location, chainage and section references.

Inaccessible areas and deviations are documented immediately.

07

Assess data and findings

Anomalies, restrictions and deviations from the plan are checked for plausibility against the suspicion basis and construction geometry.

An anomaly is not classified as ordnance or a harmless installation without specialist assessment.

08

Hand over and update results

Reports, maps, status lists and outstanding measures are prepared for designers, site management and operators.

New plan revisions and additional interventions are checked against the documented scope of work.

Describe work volumes

Which geometries describe the route and installation site together

Linear, area-wide and point interventions are recorded separately in space for the investigation. A shared plan revision connects these details without treating different depths and installation methods as uniform.

Derive the actual intervention volume from the plan and construction method

A line on a route plan alone describes neither the working width nor the whole ground volume. Trench cross-section, slope, retaining works and lateral work areas supplement the alignment. For crossings, launch and reception pits and the three-dimensional path between them are shown.

Installation areas are supplemented by foundations, chambers and cable spaces. Deep or inclined elements include the starting position, direction and final depth. Specialist planning compares these geometries with the investigation volumes that can be reached and the actual interference.

The report and execution design use the same position and height references. After a plan change, it is checked which results still match the intended intervention and which areas need to be considered anew.

01

Alignment and working width

Chainage, lateral boundaries and the intended trench shape describe the utility corridor. Additional excavations and temporary work areas are recorded with their own positions.

02

Depth and height reference

Target depths refer to a clearly identified ground or working level. Excavation and fill can change this reference and must remain identifiable in the comparison.

03

Crossings and pits

The site plan and depth profile show the launch pit, reception pit and planned underground alignment. Investigation results for the pits are not automatically transferred to the entire crossing.

04

Foundations and installation points

Point identifier, dimensions and installation method distinguish individual foundations. Deep structural elements are stated with their three-dimensional path and required work volume.

05

Existing structures and access

Utilities, installations and operating areas may restrict access and measurement quality. The sequence states when restricted areas will become accessible and what additional work will then be needed.

06

Plan revision and results status

Changed alignments, additional points and new depths receive unambiguous references. The current report shows volumes dealt with and outstanding tasks using the same identifiers as the design.

Select an investigation

Select investigations for corridors and installation areas

Two monitors displaying aerial photographs and maps; further aerial photograph printouts lie on the desk.

Relate preliminary investigation to all intervention areas

Utility routes, crossings and installation sites are checked against the same historical basis. Temporary access roads, excavations and lateral work strips are included where ground intervention occurs.

Assess the basis for suspicion
Two people with a tablet beside a marked construction area; plans lie in the foreground.

Distinguish areas, deep points and construction conditions

The choice between surface investigation, deep-ground surveying and construction-phase work follows the geometry and actual measurement conditions. A method for an open corridor cannot be transferred to a deep foundation or concealed crossing without assessment.

Select methods for areas and construction conditions
Individual installations and special structures

Which project type prepares the next technical decision

Charging points, overhead-line pylons, joint bays and pumping stations have their own construction and depth geometries. Sites, utility connections and foundations are shown on the site plan with their actual work volumes.

Charging infrastructure and charging hubs

Charging points, transformer stations, cable routes, canopies and traffic areas create different intervention depths. The investigation scope and required evidence are defined for sites, utility corridors and foundations.

Overhead-line pylons

Pylon sites, temporary arrangements, access roads and geotechnical boreholes are individual deep points distributed along long routes. Coordinates, foundation type and target depth are maintained in an updatable point register.

Cable routes and joint bays

Cable routes combine standard trenches with deep joint structures, crossings and temporary assembly areas. The evidence distinguishes linear route sections, individual pits and changed construction conditions.

Pumping stations and pressure pipelines

Pumping stations and pressure pipelines combine excavations, chambers, foundations, utilities and operational interfaces. The structure, route and deep points are planned within a shared location and documentation structure.

Compare plan revisions with measurement results

Check investigation results before each construction section

Designers, field teams and site management use the same area, chainage and point identifiers. Before execution, the plan revision, investigation results and outstanding tasks are compared.

For operators and project management, it is particularly important that technical conclusions, construction progress and the current plan revision remain aligned. Changes are therefore not merely noted in text but related back to areas, lines and points in the existing progress record.

Assess trenches, crossings and installation areas separately

FONTANA-EOD starts with the actual intervention. A standard trench, HDD crossing, pylon foundation, wind-turbine site and substation area need different investigation volumes. These differences are considered during document review and service specification.

During design and execution, changed alignments, additional points, new construction conditions and technical restrictions are checked against existing progress. This establishes which existing results remain usable and where additional work is needed.

Measurement anomalies are communicated with precise locations and their underlying data. Known technical installations, unclear interfering objects and uninterpretable zones receive specialist assessment and suitable follow-up investigation. If an unexpected suspicious object is found, work stops immediately and the competent authorities are notified without delay; internal coordination must not delay the report.

Project management receives a reliable status for each section and point, not a blanket statement for the entire corridor. This supports prioritisation, partial handovers and specialist assessment of later changes.

Unambiguous work volume

Route, area, point, depth and construction condition are defined before fieldwork.

This prevents different services from being combined in an unclear overall item.

Justified method

Target object, soil, surface and interference environment determine the technical service.

Methodological limits are incorporated into project planning before execution.

Use the same identifiers

Measurement data, borehole positions, excavation, findings and reports use the same identifiers.

Spatial consistency supports quality review and data handover.

Check plan changes

Plan changes and additional interventions are related to existing results.

Earlier statements are not transferred to new geometries without review.

Identify unresolved areas

Inaccessible or technically restricted areas remain visible spatially.

Each restriction receives a technically justified follow-on decision.

Hand over results and tasks

The conclusion answers the project question and identifies outstanding measures.

Progress remains tied to the documented area.

Project responsibility and interfaces

Who manages the route, installation, construction and find reporting

Network operators, project sponsors, designers, contractors, specialist companies and public authorities have different tasks. For plan changes, section handovers and finds, it must be clear who is informed and who takes on each task.

Large network-expansion programmes may involve several clients, design lots and civil-engineering contractors at the same time. Shared identifiers, named contacts and agreed handovers help track unresolved areas and findings across lot boundaries.

Client

Network operator, municipality or project sponsor

Defines the project objective, corridor, installation sites, priorities and required conclusion.

Provides existing documents and sets the overall project organisation.

Where several project sponsors are involved, responsibility for maintaining the shared data and progress record is defined.

Design

Engineering, route and specialist design

Translates the project into work strips, alignments, depths, pits, foundations and construction phases.

Integrates ordnance assessment and evidence into design, approvals and tendering.

Plan revisions must show which geometry is intended for execution and which is only for comparing options.

Operations and land

Operators, owners and land management

Arrange access, operations, electrical isolation, protective zones and conditions of use.

Changes to installation or operating conditions are communicated before fieldwork.

Operational permission and ordnance investigation progress remain separate decisions.

Construction execution

Main contractor, civil engineering and site management

Implement work areas, depths, equipment, instruction and stop points.

Report changed alignments, additional points and unforeseen obstacles.

The actual construction condition is checked against the documented investigation area.

Specialist service

FONTANA-EOD

Assesses documents, suspicion and methods and performs the agreed specialist service.

Documents the scope of work, results, limits and follow-up measures.

The commissioned specialist company prepares technical information and project communication; hazard-response decisions follow the local allocation of responsibilities.

Competent authorities

KBD, KMBD, KRD and local authorities

In Germany, the ordnance disposal services of the federal states and the locally competent authorities carry out hazard-response and find-management duties. Their involvement is established for the project location; outside Germany, local responsibilities apply.

The specific authority and its designation vary by region.

The local public-order authority and, where relevant, the building-control authority are involved in their project-specific roles. Requirements and contacts are assigned to the actual route sections or installation sites; reporting procedures are defined before work begins.

Project documents for routes and installations

Which documents are used in practice in utility and energy projects

Plans, measurement data and field records must represent both long corridors and individual installation and foundation areas. Their assignment is retained through design, construction and later updates.

In addition to individual evidence, the project receives a status overview distinguishing completed, restricted and unresolved work volumes. This overview supports coordination between network operators, designers, site management and subsequent trades.

Two people discussing plans at a table beside a vehicle on a construction site.

Project file and completion report

The final report describes the initial situation, investigations, technical limits and further steps required. After actual exposure or clearance work, the corresponding findings and clearance records are included.

Connect the project file and final report
Four people in orange high-visibility vests in front of two excavators on a construction site.
Person with a yellow survey cart on a footpath in front of a hedge.
Identify the project location

Bring route lots and installation sites together spatially

Illustrated map of Germany with location markers on a construction site.

Identify the site and applicable requirements

State project locations, lot boundaries, chainage and site identifiers. Existing requirements are assigned to each section. Where several municipalities or project sponsors are involved, it must remain clear which documents and contacts belong to each spatial part of the project.

Use results correctly

Use different evidence correctly within the overall project

Tie reports to the relevant interventions

Evidence for a utility corridor does not automatically describe the deeper foundations of a station. Compare position, depth and plan revision for each subproject. Shared project identifiers facilitate assignment but do not extend the investigated volume.

Check evidence against the intervention

Keep handovers between lots traceable

At lot boundaries, areas dealt with, remaining gaps and responsible contacts must be brought together. Changes to the route or construction method are updated in the shared plan revision so that outstanding tasks are not lost between subprojects.

Explore the technical principles

Technical information

Utility and energy projects: brochure

Utility routes, substations and energy installations place different demands on ordnance assessment. The brochure shows the design information needed and how investigation, construction sequence and documentation fit together.

1 / 8
Utility and energy projects: brochure – page 1

German · 8 pages

Common project questions

What to establish before route design, installation construction and execution

When is ordnance assessment required for utility and energy projects?

Investigation requirements are established from existing suspicion indicators and planned ground interventions. Trenches, boreholes, piles, pylons, chambers, foundations and installation areas are considered. Assessment should take place early enough to allow changes to options, approvals, the bill of quantities and construction schedules. The specific scope depends on suspected contamination, work volume, construction method and the conclusion required.

Can a whole route be assessed using only one method?

This depends on the ground interventions and measurement conditions. A route may include open areas, roads, existing utilities, structures, crossings and deep point interventions. Magnetometry, TDEM, GPR, deep-ground surveys and excavation monitoring answer different questions. The combination is planned section by section and linked to a consistent location and evidence system.

Which documents are needed for the initial assessment?

Useful documents include route and site plans, chainage, work strips, construction depths, structures, crossings, point lists, utility and existing-asset plans, historical analyses, authority documents, geotechnical data, construction phases and the required decision date. Options and areas not yet fixed should be clearly marked.

Information and requirements from authorities are supplied with their date, complete appendices and geographical scope. In Germany, the competent ordnance disposal service, local public-order authority and, where relevant, building-control authority are identified for the project location; outside Germany, local responsibilities apply.

What should you do if a suspicious object is found?

If an unexpected suspicious object is found, stop work. Do not touch, move or uncover it further. Leave the immediate area and warn others without putting yourself at risk. In Germany, notify the police on 110; outside Germany, use the local emergency reporting procedure. The competent authorities determine what happens next; a project enquiry does not replace reporting the find.

What happens to areas that technically cannot be measured?

Interference fields, operating installations, lack of access and existing structures may limit advance investigation. The zones are marked on the plan and suitable additional measures and possible access after demolition or exposure are defined. Where construction-phase ordnance surveying is technically suitable, each working layer is technically surveyed and assessed before controlled removal with supplementary visual inspection. Necessary investigations and protective measures are also planned before ground interventions during breaking out or demolition; areas not covered remain unresolved.

How are long projects and multiple lots documented?

Routes, areas and points receive a consistent chainage, coordinate and identification system. Measurement data, borehole positions, anomalies, field records and section reports refer to the same geometry. Progress, outstanding measures and plan changes can therefore be updated across lots, contractors and construction phases.

What is the role of ordnance disposal services and local authorities?

In Germany, the ordnance disposal services of the federal states and the locally competent authorities carry out hazard-response and find-management duties. Outside Germany, local responsibilities apply. The private specialist company performs the commissioned assessment and documentation. Reporting procedures, contacts and project communication are established for each section or installation site before work begins.

What determines effort and cost?

Factors include route length, installation area, number of deep points and crossings, surfaces, interference environment, access, construction phases, required methods, data formats and documentation scope. A reliable calculation therefore requires current plan revisions and an unambiguous description of the work volumes actually to be dealt with.

Documents for routes and installations

Documents we need for your utility or energy project

An enquiry need not contain a complete bill of quantities yet. It should, however, identify the project type, spatial geometry, intended interventions, design stage and decision required.

A reliable initial review should also show which areas are required permanently, used only temporarily or planned for a later phase. This allows the investigation scope to be phased appropriately.

Route, area and point lists

Send site and route plans with chainage, work strips, installation areas, structures, crossings and point lists.

Mark options, priority sections and geometries not yet fixed.

For long projects, the intended lot and section structure should be identifiable.

Construction methods, depths and phases

Describe open trenches, boreholes, piles, pylons, chambers, foundations, demolition and excavation with maximum depths.

State construction windows, operating conditions, access and the planned sequence.

Temporary construction roads, assembly and storage areas are also relevant where they involve ground intervention.

Documents and evidence requirements

Attach historical analyses, information from authorities, utility plans, geotechnical data and earlier reports.

State whether the result is needed for options, approval, procurement, site management, the operator’s file or section handover.

Incomplete or contradictory documents may be included and show the clarification still required.

For initial technical assessment

A site plan, brief project description, route length or installation area, maximum depths, number of crossings and deep points, planned period and existing suspicion indicators are often enough for an initial assessment. FONTANA-EOD then identifies the information still required and the appropriate service area.

For large projects, work can be phased according to design maturity, priority and construction section. This provides reliable decisions early without making blanket assumptions about later corridors or corridors still subject to change.

Required approval, operator and handover formats should also be specified. A project requiring digital route data, point-specific status lists and sectional reports needs a different data structure during field planning from a single local construction project. These requirements affect surveying, interpretation, report structure and subsequent updates.

Spatial reference

Route, chainage, work strip, installation area, structure, point list and plan revision.

Intervention geometry

Trench, drilling path, chamber, foundation, pile, pylon, demolition and maximum depth.

Project conditions

Operations, traffic, access, interference sources, construction phases, parallel trades and decision dates.

Documentation objective

Documents for design, approval, procurement, site management, the operator’s file or partial handover.

Project enquiry

Have your project assessed

Whether historical aerial photograph analysis, explosive ordnance surveying, surface surveying using GPR, magnetometry or TDEM, deep-ground surveys, downhole surveys, excavation supervision, area clearance or ordnance recovery is needed depends on the location, ground disturbance, depth, ground and existing documents. An early ordnance assessment provides clarity for tendering, programming, occupational safety and construction.

FONTANA-EOD combines its Section 7 SprengG licence, specialists holding Section 20 SprengG certificates of competence, suitable survey and clearance methods, and traceable documentation. Send the site plan, depth of ground disturbance, construction phase and existing documents for an initial technical assessment.