Project pathway
The quickest route to the right decision.
For a wind farm, we consider turbine sites, crane areas, access roads and cable routes together with the planned ground works. FONTANA-EOD plans suitable surveys according to the volume of ground affected, intervention depth and construction phase. Send site and infrastructure plans, ground investigation points and the construction sequence so that services and documentation can be defined before the drilling campaign, road construction and foundation works.
Identify turbines, roads and cable alignments.
Record foundations and borehole locations.
Document areas and sections.
Before drilling and foundation construction, existing hazard indications and planned ground interventions are used to clarify which explosive ordnance surveys are required. This also includes ground improvement, crane areas, access roads, array cables and the grid connection. The actual work geometry at each turbine location is decisive, rather than the overall wind farm area alone.
The scope of work for “Schälker Heide wind farm, Iserlohn” included ordnance specialist supervision of groundworks.
Service period: 2024-12
Service areas:Ordnance specialist supervision of groundworks
View project details · Ordnance specialist supervision of groundworks · Project location: Iserlohn
The scope of work for “Project: Lövenich wind farm; Gindorf wind farm” included ordnance specialist supervision of groundworks.
Service period: 2024-12
Service areas:Ordnance specialist supervision of groundworks
View project details · Ordnance specialist supervision of groundworks
The scope of work for “Project: Gindorf wind farm, Am Morkener Weg, 41517 Gindorf” included ordnance specialist supervision of groundworks.
Service period: 2024-09
Service areas:Ordnance specialist supervision of groundworks
View project details · Ordnance specialist supervision of groundworks
A wind farm includes foundations, construction areas, roads and cable routes involving different ground intervention depths. These geometries have different requirements for preliminary assessment, surveying and documentation.
Each turbine location receives its own status, while access roads, array cables and the grid connection are recorded by chainage or section. This keeps design changes and construction progress traceable.
The construction sequence is essential to specialist planning: ground investigation, road and crane area construction, foundation excavation, array cabling and assembly have different lead times. Each section is prepared so that the next activity begins only within a documented volume of ground.

Foundation excavation, ground improvement, piles, anchors and other foundation elements extend considerably below the subsequent ground surface.
Plan dimensions, excavation depth, foundation method and lateral working space determine the explosive ordnance assessment geometry.
A near-surface assessment of the site area does not automatically cover deep foundation volumes.
Assess the foundation and volume at depth
Geotechnical boreholes, cone penetration tests, dynamic core sampling and load tests often involve ground intervention before the final construction design.
Coordinates, target depth, borehole diameter, equipment position and safety space are described as a separate assessment task.
Individual preliminary investigation points must not be used to infer a blanket assessment of the subsequent foundation.
Prepare ground investigation and test points
Crane standing areas, auxiliary crane areas, assembly, rigging and storage areas require soil removal, load-bearing layers, compaction and drainage where applicable.
The actual work boundaries may extend beyond the permanent crane area and must match logistics planning and construction conditions.
Temporary areas are not automatically covered by documentation for the turbine foundation.
Record crane and assembly areas
Access roads connect public roads to turbine locations and are upgraded for heavy transport, cranes and later maintenance.
Widening, bend radii, passing places, slopes, culverts and ground improvement create additional volumes of ground affected.
The section documentation follows the alignment actually built, not just an early road option.
Assess access roads and construction sections
Internal medium-voltage cables, control lines, earthing and communication links run between turbines, the transfer station and the grid connection.
Trench width, excavation depth, joint bay areas, crossings and launch or reception pits are recorded as separate route sections.
For deep or trenchless crossings, we separately assess whether surveying the open cable trench is sufficient and which supplementary method may be needed.
Assess array cables and crossings
The transfer station, substation, switchgear building, storage installation or external cable route often forms a separate subproject with its own design and operator structure.
Foundations, cable basements, earthing systems, excavations and access roads are not conflated with turbine locations.
The handover between the wind farm and grid connection receives clear location, schedule and documentation references.
Coordinate the grid connection and substationWind farm planning changes through site optimisation, turbine selection, ground assessment and approval. The status of explosive ordnance work is therefore clearly updated for each design revision.
Seasonal restrictions, vegetation, forestry and nature conservation requirements and heavy-load logistics also apply. These constraints affect access and scheduling but must not lead to method limitations or outstanding areas being disregarded during construction.
Before final locations are selected, historical indications, previous uses, known finds and existing authority documents are related to the wind farm site.
Options for turbine locations, access roads and cable alignments can be compared by additional assessment requirements and technical accessibility.
The early assessment supports planning and clarifies further survey requirements. It does not replace a necessary technical survey of the subsequent ground intervention.
Assess the wind farm site using historical evidenceTurbine coordinates, the foundation concept, crane standing areas, access roads, array cables and the substation are translated into specific work geometries.
Design changes between approval and construction receive traceable revision identifiers.
The explosive ordnance status is maintained for each turbine location and route section.
Assess the wind farm layoutGround investigation boreholes and probing often begin long before foundation construction itself.
The point list is assessed with coordinates, depth, equipment use and timing sequence.
Additional or relocated borehole locations are not assumed to be covered by the original commission without assessment.
Have geotechnical points assessedQuantities, locations, methods, enabling works, work areas, data formats and acceptance criteria are clearly described for civil engineering, cable construction and special services.
Provisional items receive a specific trigger such as an interference zone, design change or lack of access.
This facilitates technically sound comparison of tenders.
Define procurement and service boundariesAccess road construction, crane areas, foundations, cable civil engineering and turbine installation follow different programme and logistics chains.
Before each activity begins, the following trade receives survey results and information on outstanding areas.
Weather, ground conditions and restricted vehicle access may change the deployment sequence.
Hand over results to subsequent tradesRepowering may involve new turbine locations, larger foundations, changed access roads and additional cable sections.
Existing turbines, foundations and utilities affect survey feasibility and construction conditions.
Earlier reports are checked against the new geometry and reused only within their documented scope.
Reassess the repowering geometryHistorical indications, technical survey feasibility and construction geometry are considered separately for each turbine location and infrastructure section. Results show which areas have been surveyed and what still needs clarification before the next ground intervention.
The timing sequence may also differ between turbine locations. Access road construction may already be underway at one turbine while historical assessment or ground investigation is still taking place at another. Work status is therefore shown by phase as well as by area.
Historical sources or authority information indicate possible explosive ordnance contamination within the wind farm site.
The indications are related to turbine locations, access roads, cable corridors and ancillary installations.
It is then defined which areas require technical surveys or design changes.
Relate suspected hazard areas to turbine locationsOpen, accessible areas may permit systematic near-surface surveys.
Terrain, vegetation, soil moisture, target object and required depth determine the grid and method.
The survey area is overlaid with the foundation, crane and assembly areas.
Assess the survey method for the turbine siteDense vegetation, root zones, slopes, ditches or restricted vehicle access can prevent complete surveys.
Site preparation, equipment selection and setting out are coordinated with nature conservation, forestry and construction programme requirements. Necessary surveys and protective measures are planned before ground intervention during vegetation clearance, dismantling or creation of access; survey access available later receives its own assessment date.
Areas not reached remain spatially marked and are assigned a later assessment step.
Select surveys according to terrain and accessFor ground investigation boreholes, piles, anchors and other deep elements, we check whether existing surveys are sufficient and what supplementary work is needed.
The relevant volume follows the coordinates, target depth, diameter and subsequent construction method.
An area-wide preliminary surface survey does not automatically address this task.
Assess deep intervention points and foundationsExisting installations, scrap metal, utilities, foundations or former technical uses can obscure survey data.
Known sources of interference are documented; the method is matched to the remaining scope for assessment.
Zones where data cannot be evaluated are not treated as showing no explosive ordnance indications.
Determine suitable methods for technical interference zonesSurvey anomalies are assessed for plausibility against turbine location plans, known installations and historical evidence.
Survey anomalies receive a specialist follow-up investigation or exposure. Recovery of confirmed explosive ordnance is coordinated with the permitted scope of activities and local responsibilities. If an unexpected suspicious object is found, work stops immediately and the competent authorities are notified without delay.
Location, findings, handover and outstanding areas remain clearly assigned to the turbine or route section.
Clarify findings and follow-up measuresThe documentation must bring together the turbine location, infrastructure and construction phase. Documentation for the turbine foundation does not automatically apply to the crane area, access road or array cables.
For large wind farms, the documentation is also structured so that individual turbine records and the overall project overview are consistent. A turbine's detailed records contain points, areas and findings; the overall overview shows work status for all turbines and linear connections.
This keeps the transition from preliminary geotechnical investigation to foundation, road and cable construction technically clear and traceable.
The wind farm area, land parcels, turbine numbers, turbine coordinates and design revisions are maintained within a consistent spatial reference.
Each location change receives its own revision and status check.
Extension or repowering areas not considered remain identifiable.
Aerial photographs, maps, previous uses, known finds and authority information are documented with their source and scope.
Data gaps remain visible for each turbine location and route section.
The historical assessment is not indiscriminately extended to the entire cadastral district.
Geotechnical boreholes, foundation points, deep-ground surveys and survey areas receive unique identifiers.
Coordinates, target depth, diameter and work status remain linked.
Additional points are recorded as new geometry.
Access roads, bend areas, crane areas, assembly zones and array cables are documented by chainage or polygon.
Working widths and alignments actually built are distinguished from the early design revision.
Handovers between civil engineering, cable construction and installation remain traceable.
Vegetation, terrain, sources of interference, utilities, weather and lack of access are described by section.
Each limitation is assigned a technical follow-up measure and project status.
Outstanding areas can thereby be incorporated into the construction programme and variations.
Maps, point lists, field records and conclusions are brought together for each turbine and infrastructure section.
The handover identifies areas addressed, method limitations and steps still required.
A later change in turbine or layout is assessed separately.
The project records contain point lists for boreholes and foundations, together with plans for construction areas and cable and road sections. All documents use the same turbine location identifiers.
For subsequent operations and repowering, it remains clear which areas were originally assessed and which served only as temporary construction or logistics areas. Maintenance modifications, cable repairs or location changes can thus be checked specifically against the existing data.
Approved coordinates, optimised turbine locations, repowering options and construction drawings are maintained under revision control.
This keeps the basis of each assessment unambiguous.
Ground investigation points, deep-ground surveys and foundation elements receive coordinates, target depths and status.
If points are relocated, we check whether the new location and depth remain within the documented survey area.
Crane areas, assembly areas, access roads, cable routes and ancillary installations are documented with section identifiers.
Handovers retain the same location references.
Anomalies, technical sources of interference, exposures and actual finds are categorised separately.
Each entry receives a follow-up decision.
Working conditions, areas actually addressed, interruptions and construction stages are recorded continuously. After actual exposure or clearance work, the corresponding findings and clearance records are included.
The records support HSE and site management.
Reports, maps, lists and outstanding measures are handed over for each turbine location and subproject.
Later additions remain distinguishable from the original status of work.
The assessment follows not just the approved design but the actual sequence of ground investigation, road construction, foundations, array cables and grid connection.
Early drilling campaigns may take place before final turbine location optimisation. Subsequent civil engineering and foundation services are therefore not automatically inferred from these preliminary surveys; they are checked again against the applicable turbine and infrastructure plans.
The site areas, number of turbines, design revision, construction concept and required decision are described.
Aerial photographs, maps, historical records, previous uses and regional information are reviewed by turbine location.
Foundations, borehole locations, crane areas, access roads, array cables and the grid connection are recorded as separate volumes of ground affected.
Depth, ground conditions, vegetation, interference sources, access and construction schedules determine the technical approach.
Setting out, site preparation, vehicle access, HSE, weather windows and data handover are coordinated.
Points, areas and linear sections are addressed according to the agreed geometry and construction phase.
Survey data, limitations and exposures are assessed for plausibility against turbine identifiers and the infrastructure plan.
Reports and outstanding measures are updated for designers, civil engineering, cable construction and installation.
A turbine location is not a single point. The foundation, geotechnical investigation points, crane area, assembly areas, access road and cable connection together form a multipart volume of ground affected.
The logistical use of an area also affects the assessment. Crane assembly, blade storage, tower section storage, auxiliary cranes and heavy transport sometimes use areas that will not remain visible in the permanent installation layout. These temporary zones are nevertheless clearly recorded during construction.
The foundation is described by its centre point, footprint, excavation depth, possible ground improvement and specific foundation method. Geotechnical boreholes and probing are often outside the final foundation layout or carried out early; they therefore receive their own point identifiers and depths.
Crane standing, assembly, rigging and storage areas are defined according to soil removal, load-bearing layers, drainage and actual equipment positions. Access roads are recorded with their alignment, widened and bend areas, slopes, culverts and temporary extensions. Array cables, joint bays and crossings form a separate linear corridor.
The status of work remains linked to the turbine identifier and current plan. If a turbine location moves, the foundation concept changes or an access road is modified, the new volume of ground must be checked against the existing assessment. Earlier results and later additions remain identifiable with their respective design revisions.
The footprint, depth, excavation, ground improvement and foundation elements determine the assessment area.
An area survey covers deep elements only where it actually covers their required location and depth.
Coordinates, target depth, drilling method and safety space are defined for each investigation point.
Changes to point lists are assessed before construction.
Permanent and temporary areas are defined by soil removal, load-bearing layers, drainage and equipment positions.
Lateral working spaces remain part of the geometry.
The alignment, widened sections, bends, passing places, slopes and culverts are recorded by chainage.
Design and as-built routes remain distinguishable.
Trenches, joint bay areas, crossings, launch and reception pits and transfer points receive their own sections.
Deep bore paths require separate consideration.
The turbine location, infrastructure, outstanding points and handover status are updated together.
Only documented areas are handed over to subsequent trades.

Preliminary geotechnical investigations can already involve deep ground intervention. Survey requirements for these points are therefore clarified before drilling begins. For later construction, the foundation, crane and assembly areas, access road, cable route and grid connection are recorded as connected areas that nevertheless require separate assessments.
Clarify depth-specific assessment before geotechnical drilling
Agricultural or forestry land may offer broad access, while former military, industrial, extraction or transport sites may have highly variable survey conditions. Vegetation, terrain, utilities, scrap metal, foundations and technical installations affect methodology and the achievable assessment.
Select suitable surveys for the survey conditionsHistorical assessment, area surveys, deep point-specific assessment and measures during construction fulfil different tasks. Their combination depends on the location, construction phase and desired assessment.
Defines suspected hazard areas and data gaps for turbine locations and infrastructure.
It does not detect objects currently in the ground.
The result supports site and survey planning.
Detects ferromagnetic anomalies in accessible areas and road sections.
Scrap metal, utilities, vehicles and installations can obscure surveys.
The grid and survey objective are defined for each location.
TDEM detects time-dependent electromagnetic responses from conductive objects and can provide supplementary investigation of selected wind farm anomalies.
Ground conditions, depth and technical infrastructure influence the conclusions.
A point-specific foundation remains a separate geometry.
Can show material and structural boundaries where ground conditions are suitable.
Reflections do not automatically identify explosive ordnance.
Moisture, heterogeneity and ground contact determine data quality.
Assesses ground investigation boreholes, foundation points and other deep interventions within the defined point location and volume at depth.
Coordinates and target depths must match subsequent construction.
No area-wide assessment is established outside the assessment geometry.
Where explosive ordnance detection during construction is technically suitable, each working layer is surveyed and evaluated using technical methods. Controlled removal in layers and supplementary visual inspection then follow; these steps are repeated down to the agreed excavation base.
Excavation layers, equipment operation, hold points, authority to issue instructions, communication channels and documentation are defined in the work instructions before work begins. Simply observing the excavator is insufficient.
The assessment remains limited to the area supervised.
Before drilling equipment, a civil engineering crew or crane is deployed, it must be clear which areas and depths have been surveyed and where tasks remain outstanding.
FONTANA-EOD checks the turbine layout against the planned ground interventions. Foundations, borehole locations, crane areas, access roads, cable routes and the grid connection are planned separately and documented together.
Methods are selected according to suspected hazards, target object, depth, ground conditions, vegetation, terrain and technical interference. Where a reliable assessment cannot be achieved, limitations and follow-up measures are identified before the next trade begins.
Fieldwork is coordinated with setting out, geotechnical design, civil engineering, logistics and HSE. Changes in weather or construction schedules do not change quality requirements but may affect the sequence of work.
The conclusion remains limited to the documented turbine and infrastructure status. Repowering, relocation or changed foundations trigger a traceable check.
For projects with several turbine types or changed hub heights, foundations, crane logistics and infrastructure may change. The technical assessment relates to the turbine configuration actually commissioned so that earlier assumptions are not carried into construction without assessment.
The turbine, infrastructure section, depth and desired decision are clearly defined.
Boreholes, foundations and survey areas remain linked to the applicable design revision.
The survey method and supplementary work follow ground conditions, interference, construction stage and target object.
Civil engineering, cable construction and installation receive a clear work status.
Vegetation, terrain, sources of interference and inaccessible zones remain visible.
Design changes and repowering are checked against the original assessment.
Where turbines are very far apart or several construction clusters are involved, fieldwork can be divided into separate campaigns. The overall project records nevertheless ensure that all locations use the same identifiers, coordinate systems and quality requirements.
The documentation relates to turbine identifiers, land parcels, turbine coordinates, foundation and borehole locations, crane areas, access road sections and cable chainage. FONTANA-EOD coordinates survey scope, occupational safety and handover of results with the construction programme.
Project developers, landowners, approval and specialist designers, civil engineering contractors, turbine suppliers and responsible authorities need coordinated information and decision procedures.
Define the site areas, project phase, programme, procurement and documentation requirements.
They provide existing land, approval and hazard documents.
Support access, site preparation, vegetation and land-use coordination and knowledge of previous site uses.
Land availability and technical assessment status remain separate matters.
Translate the project into turbine points, foundations, crane areas, roads, cables and the grid connection.
Design changes are handed over so that their effects on work status can be assessed.
Implement access, construction areas, earthworks, hold points and handovers according to the applicable plan.
Additional areas, relocated points or changed methods are reported before construction.
Assesses suspected hazards and work geometries, carries out the commissioned service and documents the result and limitations.
FONTANA-EOD carries out the commissioned technical investigation and documents its result. If ordnance is found, the responsible authorities decide on further action.
In Germany, the ordnance disposal services of the federal states and the locally competent authorities carry out hazard-response and find-management duties. Their involvement is established for the project location; outside Germany, local responsibilities apply.
The local public order authority and, where applicable, building control are involved according to their project responsibilities. Conditions and contacts are assigned to the actual turbine locations and infrastructure sections; reporting procedures are defined before work begins.
Ground investigation, explosive ordnance surveys, earthworks, heavy-load logistics and electrical installations intersect at different project phases. Risk assessments and responsibilities are therefore organised by location and activity.
At remote sites, emergency and reporting procedures must work in practice. Access, mobile coverage, rescue points and contacts are considered in the project organisation.
In Germany, § 7 SprengG concerns the commercial authorisation for activities requiring authorisation; § 20 SprengG concerns the certificate of competence of responsible persons. Under § 1b SprengG, searching for found munitions also counts as handling them. The requirements applicable to the project depend on the activity actually commissioned and the allocation of responsibilities.
The risk assessment considers methods, personnel, equipment, deep drilling and foundation works, earthmoving, heavy-load traffic, exclusion zones, escape routes, weather and communication. Remote sites require reliable reporting and rescue arrangements.
DGUV Information 201-027 supports risk assessment and protective measures for explosive ordnance clearance work. The Baufachliche Richtlinien Kampfmittelräumung contain requirements for historical and technical investigation, clearance concepts, procurement and documentation within their defined federal remit. Their application to the specific wind farm project is clarified separately.
If an unexpected suspicious object is encountered, stop work in the affected area immediately. Do not touch, move or continue to expose the object. Leave the danger area and keep others away without putting yourself at risk. In Germany, notify the police immediately on 110; outside Germany, use the local emergency reporting procedure. The responsible authorities determine the next steps. Then inform site management and those responsible for occupational safety.
The transition from preliminary geotechnical investigation to explosive ordnance surveys and subsequent specialist foundation work is clearly described contractually. This identifies which company owes which service, who approves changes and which documentation must be available before the next work step.
The First Ordinance to the Explosives Act (1. SprengV) includes requirements concerning specialist competence and state-recognised training courses. For wind turbines, the required qualification is linked to the activities actually commissioned at turbine locations and along routes.
DGUV Rule 113-003 concerns the dismantling or destruction of explosives or corresponding objects and also includes the disposal of found munitions. It applies according to this field of activity; it does not replace a risk assessment specific to the planned ground intervention.
The company, responsible individuals and specific scope of activity must be compatible.
Drilling, foundations, earthworks, heavy-load logistics, exclusion zones and escape routes are assessed by location.
Points, areas, depths, methods, data formats and acceptance criteria are clearly described.
Project management, HSE, construction companies and responsible authorities follow a procedure defined in advance.
Borehole point lists, access, target depths, equipment positions, utilities and suspected hazards are assessed before mobilisation.
Additional points receive a new technical assessment.
Work areas, excavation, ground improvement, hold points and handovers are coordinated with the applicable turbine plan.
Marginal areas not addressed remain marked.
Stop work immediately, do not touch, move or uncover the object further, leave the immediate area and keep others away without putting yourself at risk. In Germany, notify the police immediately on 110. Outside Germany, use the local emergency reporting procedure.
Further handling depends on the find circumstances and regional responsibilities.
Plans, point lists and records show which areas were investigated and which tasks remain unresolved.
The documents also support coordination between project development, geotechnical design, civil engineering and turbine logistics. Site-specific maps and point lists show the turbine to which each survey applies.
For site handovers, maps and lists are structured so that civil engineering, cable construction and installation use the same turbine and section references. This reduces queries between trades working at different times and supports reliable updates through to project completion.
The wind farm overview links turbine points, crane and assembly areas, roads, array cables and the grid connection to their respective work status.
Assess wind farm locations within the energy project
The mapping identifies substantiated suspected hazard areas, data gaps and requirements for further site assessments for wind turbines.
Check the historical basis for the site
Deep assessments relate to the documented turbine coordinates, point location and volume at depth and the planned foundation method.
Survey foundation and borehole locations
The suitability of construction-phase ordnance surveying is assessed for each excavation layer. The documented investigation area limits the statement’s scope.
Supervise foundation and cable excavation
Survey anomalies, technical sources of interference, finds and outstanding follow-up measures remain assigned to the affected turbine or cable chainage location within the wind farm.
Document findings and follow-up measures spatially
The design basis, fieldwork, limitations and next construction decision are brought together for each turbine and the overall wind farm records.
Document turbine location records and handover

Historical site assessment, depth-specific assessment, supervision of earthworks, investigation of findings and documentation are assigned to each turbine or infrastructure section.
Before the construction phase, required surveys at foundation locations, cable routes and access roads are checked against the construction design. Ground intervention depths, construction sections and handover of results to site management must be defined.
Plan ordnance assessments for transport, utility, energy and other infrastructure projects according to their ground interventions.
Have the project surroundings assessed by specialists
Distinguish utility corridors, crossings, foundations and installation areas by construction method and intervention depth.
Assess utility and energy project requirements
Provide a spatial basis for suspected hazard areas, data gaps and technical priorities for wind farms and wind turbines.
Clarify historical suspicion indicators
Relate boreholes, foundations, chambers and deep intervention points at wind farms and wind turbines to the volume of ground affected by subsequent work.
Assess deep spaces affected by the works
Establish the suitability and sequence of construction-phase ordnance surveying for remaining excavation areas.
Prepare the excavation sequence
Coordinate recovery of confirmed ordnance with the permitted activities and local responsibilities.
Coordinate the processing of findings
Define the specification, data structure, quality checks and partial handovers for wind farms and wind turbines.
Prepare tendering and documentation
Take account of the project location, federal state and local interfaces for planning and communication about finds at wind farms and wind turbines.
Understand regional responsibilities
Have the site plan, work geometry, design revision and decision deadline assessed for wind farms and wind turbines.
Enquire about a wind farm with supporting documents
Wind farm projects often extend across several cadastral districts and are implemented in campaigns at different times. One turbine location may already have undergone geotechnical investigation while its access road or array cable route remains at the option stage. Work status is therefore recorded for each turbine location and infrastructure section so that a partial decision is not inadvertently applied to the entire project.
The project location, turbine identifier, land parcel and coordinates together identify the turbine site. Existing requirements are assigned to the relevant location or infrastructure section.
A result for the foundation area does not automatically cover adjacent crane or assembly areas. Compare the location, working width and depth of these areas with the documented survey scope before the next construction phase begins.
Check evidence against the interventionRelocated access roads or changed array cables may affect areas not previously considered. Assign the change to its section and design revision and clarify additional survey requirements before construction.
Explore the technical principlesTechnical information
Utility routes, substations and energy installations place different demands on ordnance assessment. The brochure shows the design information needed and how investigation, construction sequence and documentation fit together.

The assessment should begin as soon as the proposed site areas, turbine coordinates and infrastructure corridors are sufficiently described. Geotechnical boreholes may involve relevant deep ground interventions even before approval or detailed design. Before foundation construction, access roads, crane areas and array cabling, the respective volumes of ground affected must be technically defined.
Not automatically. A near-surface survey can assess part of the site area but covers deep piles, anchors, boreholes or other foundation elements only where the achievable assessment geometry matches the subsequent intervention. Deep points are therefore planned and documented separately.
If an unexpected suspicious object is found, stop work. Do not touch, move or uncover it further. Leave the immediate area and warn others without putting yourself at risk. In Germany, notify the police on 110; outside Germany, use the local emergency reporting procedure. The competent authorities determine what happens next; a project enquiry does not replace reporting the find.
Wind farm and site plans, turbine coordinates, foundation and excavation geometries, ground investigation point lists, crane and assembly areas, access roads, array cables, crossings, the substation, ground investigation and utility data, historical assessments, conditions, construction schedules and the desired handover date are required.
Information and requirements from authorities are supplied with their date, complete appendices and geographical scope. In Germany, the competent ordnance disposal service, local public-order authority and, where relevant, building-control authority are identified for the project location; outside Germany, local responsibilities apply.
Vegetation, root zones, slopes, ditches, soil moisture and restricted vehicle access are considered in the methodology. Areas not adequately surveyed are identified on the plan, and suitable supplementary measures and possible access after site preparation or dismantling are defined. Necessary surveys and protective measures are planned before ground intervention during vegetation clearance, dismantling or road construction. Where explosive ordnance surveying during construction is technically suitable, each working layer is technically surveyed and assessed before controlled removal with supplementary visual inspection; areas not covered remain outstanding.
New turbine coordinates, larger foundations, changed crane areas, new access roads or additional cable routes may lie outside earlier assessment areas. Existing foundations and utilities also change survey conditions. Earlier documentation is therefore checked against the geometry, depth and construction conditions of the repowering project.
In Germany, state explosive ordnance disposal services and locally responsible authorities carry out hazard prevention and find-handling duties. Outside Germany, local responsibilities apply. FONTANA-EOD carries out the privately commissioned site assessment and documentation within the agreed scope. Reporting procedures and contacts are clarified for the affected locations and sections before work begins.
Factors include the number and location of turbines, depth and number of ground investigation and foundation points, crane area sizes, access road and array cable lengths, vegetation, terrain, sources of interference, accessibility, methods, construction phases and documentation scope. Reliable costing needs current site and infrastructure plans.
An initial enquiry can be based on early site proposals. Priority turbine points, planned ground investigation works, infrastructure corridors and the next decision deadline are essential.
The earlier drilling and foundation points are available, the more reliably the service scope can be defined. For infrastructure still subject to change, corridors and reserved areas are initially considered; construction-ready points and alignments subsequently receive precise assessment.
Planned alternative locations and reserve areas should also be marked so that their work status is not confused with that of the definitive turbine points.
Send the site plan, land parcels, wind farm polygon, turbine coordinates, numbering and current design revision.
Mark options, relocated turbine positions and areas not yet accessible.
For repowering, old and new designs should be shown separately.
Describe ground investigation points, target depths, foundation and excavation geometry, ground improvement, crane and assembly areas.
State access roads, bend areas, array cables, crossings and ancillary installations.
Deep intervention points and area-wide earthworks are identified separately.
Include utility plans, ground investigation data, historical assessments, authority documents and known areas of interference.
Specify site preparation, the drilling campaign, road construction, foundation construction, cable construction and installation windows.
Provisional documents also show which baseline information is still missing.
For an initial assessment, the wind farm polygon, turbine coordinates, planned ground investigation points, foundation concept, crane areas, access roads, array cables and existing hazard indications are often sufficient. FONTANA-EOD then identifies the required assessment scope and data.
For wind farm projects lasting several years, work can be phased according to the geotechnical campaign, approval status and construction priorities. This provides reliable assessments early for imminent turbine locations without prematurely fixing later layout options.
An overview of the planned contract and procurement structure is also helpful. This indicates whether site management and the operator need shared overall documentation, individual turbine location reports or a combination of both.
Wind farm polygon, turbine identifier, coordinates, land parcel and current design revision.
Ground investigation boreholes, foundation, piles, anchors, ground improvement and target depths.
Crane and assembly areas, access roads, array cables, substation and grid connection.
Approval status, HSE, construction phases, logistics windows and required handover date.
Whether historical aerial photograph analysis, explosive ordnance surveying, surface surveying using GPR, magnetometry or TDEM, deep-ground surveys, downhole surveys, excavation supervision, area clearance or ordnance recovery is needed depends on the location, ground disturbance, depth, ground and existing documents. An early ordnance assessment provides clarity for tendering, programming, occupational safety and construction.
FONTANA-EOD combines its Section 7 SprengG licence, specialists holding Section 20 SprengG certificates of competence, suitable survey and clearance methods, and traceable documentation. Send the site plan, depth of ground disturbance, construction phase and existing documents for an initial technical assessment.