Illustration of a project meeting with a site plan, survey instrument and excavator on a construction site
Illustration of a project meeting with a site plan, survey instrument and excavator on a construction site.

About FONTANA-EOD

Who is behind FONTANA-EOD, how to contact us and where to find the information you need for your construction project.

Company

GmbH based in Gersheim

Working together

Clarify tasks and interfaces

Project contact

Discuss your project and documents

Company overview

Your contact for unexploded ordnance matters on construction projects

FONTANA-EOD Consulting & Engineering GmbH is a limited liability company based in Gersheim. Its managing director is Oliver Wolfgang Fontana. The company is registered with the Saarbrücken Local Court under HRB 111333.

We support project owners, design offices and contractors in preparing and carrying out unexploded ordnance investigations. Our first discussion focuses on your project: which area is affected, what groundworks are planned and what information is already available? This helps establish what needs to be clarified next.

Our About us page provides more detail on our technical work and approach. You can find our legal company information and contact details in the Legal notice for easy reference.

Your enquiry

Find the information you need

Understand the services

The Service overview explains our areas of work. It helps you identify the questions your project raises before individual investigations are specified. We agree the required scope on the basis of the actual task and the documents available.

Prepare to work together

In the Project process you can follow the steps from the initial enquiry to delivery of the results. For site management and design teams, it is particularly important to agree the areas concerned, planned working depths, access and construction phases.

Understand the equipment

The page Expertise and equipment describes the equipment available and where it is used. The choice of survey method depends on the investigation task and conditions on site.

Working together

Clear questions before work starts

A site plan, a description of the planned works and any existing information or investigation reports help us assess your enquiry. Please also name the site contact and indicate the intended schedule. You can discuss any missing documents with us.

When planning the work, we agree the commissioned scope of work and interfaces with the project participants. This includes site access, coordination with site management and delivery of the results. The specific project requirements and the findings of earlier investigations need to be considered together.

FONTANA-EOD holds a permit under § 7 SprengG for the activities specified in the permit decision. Details of the permit and the responsible supervisory authority are provided in the legal notice. The permit does not replace an assessment of which services and conditions are required for your project.

Contact and information

Discuss your project with us

Would you like to prepare an investigation or discuss existing documents? Briefly describe the project location, the planned works and your specific question. This allows us to focus the discussion on your current stage of planning.

Head office: +49 6843 9994997
Email: info@fontana-eod.de

You can submit a project enquiry through the contact section. It also provides a direct route to choosing the relevant service.

Project enquiry

Have your project assessed

Whether historical aerial photograph analysis, explosive ordnance surveying, surface surveying using GPR, magnetometry or TDEM, deep-ground surveys, downhole surveys, excavation supervision, area clearance or ordnance recovery is needed depends on the location, ground disturbance, depth, ground and existing documents. An early ordnance assessment provides clarity for tendering, programming, occupational safety and construction.

FONTANA-EOD combines its Section 7 SprengG licence, specialists holding Section 20 SprengG certificates of competence, suitable survey and clearance methods, and traceable documentation. Send the site plan, depth of ground disturbance, construction phase and existing documents for an initial technical assessment.