Ordnance surveying in Luxembourg for your construction project

Project owners, design practices and contractors need a specific investigation brief and clarified local prerequisites for groundworks in Luxembourg. FONTANA-EOD in Gersheim reviews existing findings and agrees possible technical services within the permitted scope. Send a site plan, intervention depths and existing reports. Before work starts, clarify the Luxembourg supporting documentation, notifications and coordination with the responsible authorities that are required.

Existing knowledge

Review historical evidence and earlier reports.

Local responsibilities

Clarify authority to act and necessary notifications.

Results

Document areas investigated and outstanding questions.

Assess the construction project

How does a project assessment for groundworks in Luxembourg begin?

Before excavation, drilling or utility construction, consider historical evidence, existing reports and proposed interventions together. The technical planners establish the findings still needed and a suitable investigation method. Before work starts, check the permitted scope of services and Luxembourg prerequisites, including necessary notifications. SEDAL remains responsible for its public duties concerning found ammunition; German qualification records are considered according to what each establishes.

Documented location references

Reference projects in Luxembourg

Select a project location on the map or in the location list. The associated entries lead to the protected reference overview.

3 locations · 6 associated reference entries

Reference projects in LuxembourgGeographical outline with confirmed location references from the project records. No precise ordnance find or site coordinates. Dippach – 1 reference entryReckange-sur-Mess – 1 reference entryLuxembourg – 5 reference entries

The markers show locations associated with documented references, not precise find or site coordinates. Several entries may concern one project. References without a reliable location assignment are available in the complete reference overview.

Luxembourg: ACT / data.public.lu, CC0. Area outline projected for display. Selection and project assignment: FONTANA-EOD.

Project references

Selected project examples

Project site

Connect the site with the specific construction task

Schematic map of Germany with location markers on a work surface; rolled plans and a white safety helmet alongside, with a construction site in the background.

Compare Luxembourg locations according to their own construction tasks

Industrial sites, urban infrastructure and projects in the north or east may involve different records and conditions. Preparation depends on the specific intervention and existing findings in each case. Regional orientation supports this work but does not replace an assessment of the property. Agree contacts, local prerequisites and technical findings needed separately for each project.

The Grand Duchy of Luxembourg is a separate state bordering Germany, France and Belgium. Identify the affected municipality and project address. Luxembourg City refers to a specific city; projects in the north, south or east are considered at their actual locations. For cross-border routes, identify the respective sections and contacts separately. The head office in Gersheim coordinates the enquiry; local requirements depend on the site concerned.

The available regional overviews Central Luxembourg, Minette and southern Luxembourg, south-west Luxembourg, Bettembourg logistics corridor lead to the corresponding local information. Select the area of your construction project; the specific municipality and affected properties remain decisive for the enquiry.

Local context

Clarify investigation requirements and responsibilities in advance

Your construction task and its records

For preparation, we need the property's position, existing historical evidence and reports, and a description of the earthworks. We check which questions these records already answer and what still needs investigation. Agree the next steps with the project owner, designers and contractors.

Luxembourg's national portal describes severe destruction in the north and east during the Ardennes offensive from December 1944 and the liberation of Vianden on 22 February 1945. Relate these documented historical events to the actual construction site and available sources. They do not establish general contamination of every property. Keep local land-use and wartime history and technical investigation of today's ground identifiable according to their respective scope during preparation.

Prerequisites for services in Luxembourg

Luxembourg requirements apply to work in the country. German permits or certificates of competence do not automatically authorise every activity in the Grand Duchy. Before commissioning, therefore clarify the specialist contractor's permitted tasks, prerequisites for cross-border work and public responsibilities.

Prepare the collaboration

Enquiries and project coordination go through our head office in Gersheim. To start, provide the project location, site plan, planned intervention depth, existing records and a realistic timeframe.

Working together

Distinguish the tasks of client, designers and specialist contractor

Client and operator

The project owner describes the scheme and supplies existing project records. Operators add information on use, access and timing requirements. A coordinating contact brings the information together. The parties agree their respective tasks and decision-making responsibilities. Before commissioning, record what information is missing, who will obtain it and which decision the results are intended to support.

Planning and construction management

The specialist designers describe areas, depths, construction methods and changes. Site management coordinates the planned sequence with the construction contractors and agreed specialist works. Results are assigned to the respective intervention. A technical plan change is communicated early enough for its effect on the survey task to be assessed before construction. Organisational construction stage boundaries remain distinguishable from technical survey boundaries.

Specialist company and competent bodies

The private ordnance specialist contractor performs the agreed technical task within the permitted scope clarified for Luxembourg. The commission specifies the investigation objective, area, depth and results documentation. Relate required notifications and evidence to the respective activity and personnel deployment. The responsible Luxembourg authorities make the decisions assigned to them. SEDAL performs its public duties concerning found ammunition. The specialist contractor and project parties agree the necessary handovers with the responsible authorities early.

Investigation task

Which specialist task comes next?

Determine the investigation objective on technical grounds

Describe what needs to be established for the next ground intervention. Account for available access, installations and interference when selecting the method. A technical solution used earlier at another location is not a sufficient benchmark. Coordination records which areas can be covered and how unresolved questions will be addressed and communicated to those responsible for the project.

Compare suitable specialist services

Distinguish reporting a find from planned technical services

If ammunition is suspected, stop work in the affected area and leave the object undisturbed. Keep your distance; do not touch or move it. From a safe distance, notify SEDAL or the Police Grand-Ducale on 113. Official reporting addresses the actual find. Routine project enquiries prepare work that can be planned.

Compare investigation methods
Region and construction task

Industrial sites, urban construction and historic wartime locations

Land-use history and today's construction works determine which questions a property needs assessed. The regional examples below provide orientation; they do not establish contamination of an individual area.

For cross-border projects, assign investigation areas, responsibilities and supporting documentation to each country. A report for the German construction section does not automatically answer every question for the Luxembourg section. On both sides of the border, the documented areas and depths must match the actual proposed intervention.

South: industrial sites and redevelopment

In the south around Esch-sur-Alzette, Differdange and Dudelange, mining and steelmaking have shaped land-use history. During demolition and redevelopment, foundations, utility lines, fill and metal installations can make investigation harder. A former industrial site is not thereby proven to contain explosive ordnance: historical grounds for suspicion are assessed separately from other contamination questions.

Luxembourg City and central infrastructure

Urban excavations, utility works and alterations to transport routes bring together restricted working areas, existing development and ongoing operations. Investigation planning depends on the actual intervention areas, construction stages and access. Records of earlier works must match the new construction task geographically and at depth.

North, east and projects near the border

Northern and eastern Luxembourg were particularly affected by the Ardennes offensive, as the national portal also describes. For projects around Wiltz, Diekirch or Ettelbrück, for example, available information on fighting forms part of the historical context. Border locations and former transport or military uses are investigated specifically for the site; a rural location is not an all-clear.

Tasks at the site

Clarify technical needs and prerequisites for work together

01

Describe the property-specific task

Show working areas with their boundaries, elevations and intervention depths. Include preliminary exploratory works and later excavations as well as access and connections. The technical assessment uses existing site records. Regional historical context alone does not determine the investigation requirements of an individual project.

02

Determine the permitted scope of services

Before commissioning, clarify which private technical services can be performed under Luxembourg requirements. Provide existing official conditions. Describe the agreed technical task precisely so the client and contractors have the same expectations of the service, results and further coordination needed.

03

Prepare the prerequisites for cross-border work

With the responsible parties, check notification and evidence requirements applicable to the specific activity. Requirements for temporary service provision and posted employees are separate questions. Identify who will supply each set of records and how their status will be established traceably before the proposed start.

04

Record the scope of results for site management

Agree which accompanying drawings and descriptions are needed for the subsequent groundworks. The report must identify the limits of its conclusions. Pass on private documentation according to its actual purpose. Required official decisions and the handling of found ammunition retain their separate responsibilities.

Investigation and clearance

Which investigation and clearance services may be suitable

For each construction site, assess which investigation is suitable and what it can establish under existing conditions. Document measurement and interpretation limitations.

Historical sources and analysis of suspected contamination

Bring together available aerial photographs, maps, land-use evidence and earlier reports. Source coverage, positional references and evident gaps are decisive. Interpretation produces a reasoned assessment of which areas need further investigation.

Surface surveying and geophysics

Depending on the ground and investigation objective, magnetic methods, TDEM or ground-penetrating radar may be suitable. Metal infrastructure, soil conditions and access affect measurements. Radar provides information about underground reflections; one signal does not establish a reliable ordnance identification.

Deep-ground and downhole surveys

For piled foundations, deep excavations or shoring, assess which depth range needs investigating. A borehole survey may be considered where suitable surface methods cannot provide the findings needed. A large construction depth alone does not prescribe an identical investigation method in every case.

Area clearance and preparatory works

Where the findings warrant it, define the clearance objective, working area, safety requirements and responsible contractors. Whether FONTANA-EOD undertakes particular works is clarified against the commission and Luxembourg requirements. Agree activities concerning found ammunition separately.

Excavation supervision

Technical supervision of earthworks may complement the agreed approach. It needs a suitable construction sequence, available contacts and clear procedures for anomalies. Supervision is not a general alternative to investigations required before excavation begins.

Findings, handover and documentation

Assign identified grounds for suspicion and limits of investigation geographically. Clarify the handling of ammunition actually found with the responsible Luxembourg authorities. Documentation describes results and outstanding questions and provides the technical basis for further project decisions.

Project types

Relate findings, the technical task and local prerequisites

Illustration: aerial photographs and maps on two screens and printed on a desk.

Relate historical evidence to your own property

A region's wartime history may be relevant to further research. It does not answer what has been established for a particular construction area. Collect existing assessments and reports with their maps. The technical planners check the specific geographical coverage and describe which findings can be used for the proposed interventions and which remain missing.

For an earlier assessment, compare the area considered with today's design. Identify sources and existing results plans by date and publisher. Keep missing appendices visible as specific gaps. For redevelopment, account for known former operating boundaries and later ground changes; relate additional information requirements to the next groundworks.

Arrange specialist assessment of historical evidence
Two people with a tablet beside a marked construction area; plans lie in the foreground.

Agree technical services within the permitted scope

A suitable investigation depends on the construction task and site conditions. Clarify Luxembourg prerequisites before commissioning as well. Identify existing official conditions and contacts. The agreed service should show which technical task is to be performed, what results are expected and which further decisions remain with the responsible authorities.

Distinguish the technical findings needed from organisational prerequisites still unresolved. The construction area description should include working spaces, preparatory interventions and undecided alternatives. For tendering, specify expected results documentation and known access restrictions. Once the scope is defined, agree the private technical services and coordination required for it.

Compare specialist services
Illustration: two people review plans and documents at a table beside a construction vehicle.

Communicate the report's conclusions clearly

Document a result with its area, depth, method and limitations. Site management needs these details together with the accompanying drawings. Private technical documentation thereby serves a specific technical purpose. Do not present it as general official clearance or transfer it to other properties, greater depths or construction phases not yet investigated.

For the project file, retain the drawing revision used with all relevant results appendices. Keep an area not yet investigated identifiable as an outstanding task. Hand over this information in full if the contractor changes. Plan additional investigation around the ground newly affected; suitable existing findings remain part of the evidence.

Document findings and their limitations
Project documents

Documents that establish the next step

Prepare service provision and employee posting separately

Cross-border work may involve different evidence and notification requirements. Clarify which prerequisites apply to the specific service and who handles each set of records. Consider information on temporary service provision and the posting of employees together. Evidence from one of these areas does not automatically answer every question in the other.

Describe the next groundworks in full

Technical preparation also needs early exploratory works, trial openings and additional working areas. A drawing of the finished building does not always show these interventions. Include positions, depths and sequence. Available findings can then be compared with the actual forthcoming works before a method or investigation date is set.

If area clearance is needed, describe its objective, geographical scope and handovers within the technically agreed approach. Account for permitted private activities and SEDAL's responsibilities. Clearance work actually carried out is documented in a clearance record identifying the areas covered and limitations. Keep the report and accompanying drawings together in the project file.

Method selection

Select methods according to the task and survey conditions

Historical records and aerial photographs

Historical aerial photograph analysis relates available images, maps, land-use records and earlier reports to a particular investigation area. Identify historical dates, geographical coverage and gaps traceably. If historical questions remain unresolved, carry out the necessary research and aerial photograph analysis. For a cross-border project, identify each country's sections clearly. Historical interpretation remains distinguishable from technical investigation of today's ground. Its results inform specialist investigation planning alongside the planned intervention and other findings.

Understand aerial photograph assessment

Magnetometric survey

Geomagnetic surveying passively measures the magnetic field and investigates magnetic anomalies. Conductivity alone does not make an object detectable geomagnetically. During redevelopment and urban works, reinforcement, utility lines, fences and other installations may affect measurements. The technical planners justify suitability for the volume of ground proposed and findings needed. Interpret measurement data and interference together. A strong signal alone is not an ordnance identification. The documentation records the areas actually investigated and achievable limits.

Understand the scope of magnetometry

Electromagnetic methods

Transient electromagnetic methods, or TDEM, investigate the electromagnetic response of conductive objects over time. Selection accounts for expected target objects, the volume of ground needed and actual measurement conditions. An infrastructure project may combine open areas with densely occupied connections. Account for these differences in investigation and interpretation. Keep positional references, interference and restrictions documented. Determine supplementary measurements from the outstanding technical question. Clarify the equipment's technical suitability and local requirements for its specific use together for the commission.

Understand electromagnetic surveying

Ground-penetrating radar

Under suitable conditions, ground-penetrating radar can record underground structures and reflections. Soil structure, moisture, installations and the investigation objective determine its appropriate use. Specialist interpretation relates the measurements to other findings. An anomaly does not automatically identify explosive ordnance; a display without anomalies remains limited to the area investigated. When using existing data, account for the original commission and limitations. Check the usefulness of utility detection or geotechnical measurements for the ordnance question accordingly. Results documentation records the findings needed for the next groundworks traceably.

GPR and limitations

Deep-ground and downhole surveys

For piled foundations, drilling, shoring or deeper excavations, describe the volume of ground needed by position, depth and elevation datum. If a suitable surface investigation cannot provide the findings required, a coordinated deep or borehole survey may be considered. Preparation includes existing utility lines and technically appropriate creation of investigation access. Identify technical results or borehole clearance with their actual investigation scope. Before using them, check additional depths or relocated starting points against them. Clarify necessary Luxembourg prerequisites before carrying out each activity.

Prepare deep interventions

Survey during construction

An ordnance investigation alongside construction is technically planned where a necessary preliminary investigation cannot be completed in full and this approach suits the task. It may combine excavation in layers, specialist exposure and supplementary surveys in the relevant working area. Visual observation of excavation alone is insufficient for detection. Schedule interpretation and communication of findings within the construction sequence. Keep investigated areas, limitations and outstanding tasks documented. If ammunition is actually found, stop work and notify SEDAL or the police; private technical work remains within its previously clarified permitted scope.

Agree the approach during construction
Technical assessment

Distinguish historical assessment from technical investigation

Record the findings needed in writing

Identify the intervention for which the investigation is needed. For a utility line, this may include individual sections, deeper shafts and additional connection pits; for a building, also include preliminary exploratory works. Relate existing historical assessments and technical results to them. The commission should identify the question the technical service is to answer. This makes it possible to trace later whether a result actually applies to the next groundworks. A general request to assess the property often lacks this essential definition.

Describe measurement conditions and available access

Identify known installations, paved areas and operational restrictions. State which areas are accessible when and whether preliminary works are proposed. The technical planners assess suitable methods against these details and the findings needed. If local conditions become apparent only during the works, assess their significance for the agreed scope. Record the resulting limitations in the report. A general area figure or unchanged schedule does not expand a technically limited conclusion.

Make the scope of results usable for further decisions

Assign the report to the area actually investigated and drawing revision used. Site management needs complete maps and limitations as well as the summary. If further evidence or coordination is required, clarify its purpose with the responsible authority. A private report describes the technical service performed; its title alone does not replace a required official decision. For changed or later interventions, check again whether documented results match the position, depth and question.

Next steps

From the current plan to documented investigation

01

Collect records according to their purposes

Send the current ground intervention design, existing ordnance reports and known local requirements. Identify missing appendices or unclear geographical references. Label geotechnical and soil contamination records separately. For coordination, it helps to identify each report's author and the question it answers. This shows specifically which evidence is available for the proposed service. At first contact, identify the project location and findings needed. Check existing drawings, statements and reports for currency, geographical relevance, completeness and gaps.

02

Address outstanding historical questions

Where historical questions remain open, necessary research and aerial photograph assessments are actually carried out within the commission agreed by specialists. Existing assessments are considered with their respective subareas and conclusions. Additional findings are assigned to the present area of ground disturbance and used in investigation planning.

03

Agree the scope of services and prerequisites

Describe the technical task and proposed personnel deployment. Before work starts, check the applicable Luxembourg requirements and necessary credentials and notifications. A general company qualification does not answer every question for a specific commission. Record which parties supply the outstanding records and how the agreed version will be available before starting. Select the method according to the investigation objective, intervention depth, soil structure, installations and actual measurement conditions. Clarify access and necessary prerequisites with the responsible parties.

04

Prepare the works and reporting procedures

Clarify access, contacts and the groundworks sequence. Pass on design changes before the affected activities. The responsible authorities and reporting procedures for findings must be known. Handle an actual ammunition find according to official instructions. Keep routine technical collaboration and urgent reporting of a find clearly distinguishable in the sequence.

05

Perform the agreed investigation

The agreed survey or appropriate investigation during construction is carried out on the defined areas and points. Measurement data and observations receive clear position and elevation references. Uninvestigated areas, restricted access and relevant interference are recorded.

06

Assess and document findings

The collected data and findings are assessed against the investigation objective and actual measurement conditions. The assessment takes account of interference and limitations. The report and plan appendices document the technical assessment, areas addressed and their position, elevation and depth references. Required further tasks follow from this.

07

Hand results over for the actual next task

Site management receives complete results with geographical coverage, depths and limitations. Check which proposed works they cover. Identify outstanding areas with the clarification still needed. Keep the same complete documentation available if responsibilities later change. Compare new or changed interventions against this record before using findings from an earlier construction phase.

Construction sequence

Coordinate investigation and construction sections

Start the enquiry with technical and organisational details

Provide the intervention design, earlier reports and existing project requirements. Identify responsible contacts and the proposed start. Initial coordination establishes the technical requirements and identifies unresolved prerequisites. This links a preliminary technical assessment traceably with binding preparation for work that can actually be undertaken lawfully.

Check the agreed status together before starting

Determine which records, notifications and access arrangements the agreed task needs. Inform the specialists involved about design changes. Base the investigation on the current status. After the works, site management receives the complete results with their limitations; keep further coordination required identifiable with its responsible party.

Responsibilities and supporting documentation

The public ordnance service and private project commissions

Before mobilisation, establish which works the specialist contractor may undertake and when the responsible public authorities must be involved.

SEDAL's responsibilities and prerequisites for private work

The Service de déminage de l’Armée luxembourgeoise, or SEDAL, is the Luxembourg Army's ordnance service. Its published duties include responding to unexploded ammunition from the world wars. Coordinate private investigation and planning services with this public responsibility. Defusing and destruction are among SEDAL's duties.

Before mobilisation, clarify the credentials, notifications and safety requirements needed for the proposed activity. Guichet.lu describes, among other matters, notification of temporary cross-border services for certain activities and employee posting notifications to the Inspection du travail et des mines. Requirements applicable to a commission depend on the service and personnel deployment; a general company credential does not replace this check.

For the works, agree investigated areas, intervention depths, working sections, contacts and reporting procedures. Clients, designers and site management should be able to identify which findings they can rely on and which questions need clarification. Check changes to excavations, routes or foundations against the existing investigation scope.

The completion report identifies the areas and depths covered, methods used, results and limitations. Clearance documentation also applies only to its described scope. It does not replace a required official decision or establish the absence of explosive ordnance for any later use.

Commission and authority to act

Clarify proposed works and permitted activities.

Competent authorities

Involve SEDAL and other authorities according to the commission.

Supporting documentation and notifications

Collect the necessary records before mobilisation.

Working areas and access

Account for position, depth, access and construction stage.

Reporting procedures for findings

Define reporting procedures for findings and changes.

Results and survey limitations

Record investigated areas, depths and limitations.

Documentation

Assign findings, specialist services and official duties traceably

Findings and their scope

The investigation report describes the agreed scope and work actually performed. Document areas, depths, methods and remaining limitations traceably. The next groundworks must match these findings. Clarify the form and further evidence needed locally against Luxembourg requirements and the specific project task.

Project responsibilities

The Service de déminage de l’Armée luxembourgeoise, or SEDAL, performs public duties concerning unexploded wartime ammunition. Within the service's remit, these include identification, specialist assessment, defusing and destruction. A private technical service has its specifically clarified commission, necessary supporting documentation and agreed handovers. Report a find to the public authorities through the designated procedure.

Working approach

How FONTANA-EOD works

Document the agreed specialist service clearly

We assess the planned groundworks against the available documents and their design revision. Before attending site, we agree with you what needs to be investigated, which areas are accessible and what findings are required. If the design or site conditions change, we check whether the agreed scope remains appropriate. The report states what was actually investigated and the limits of the findings. This allows designers and site management to see which findings they can use and where questions remain.

Discuss the investigation task

The task before the equipment

We first establish the investigation objective: which question must it answer? We then select a technically suitable method. The availability of a particular device or experience on a similar neighbouring site is not enough to justify the choice of method on its own.

Keep limitations visible

Inaccessible areas and limited conclusions are identified. They do not disappear into a total area figure. Designers and site management can then decide specifically which areas still need attention and when a suitable survey becomes possible.

Clarify changes before intervening in the ground

A new location, additional depth or different construction method is compared with previous results. A familiar project name does not replace this comparison. Feedback is provided before the affected work so that an outstanding question can be included in the sequence.

Hand over the report and plan together

The technical conclusion remains connected to its location references and appendices. A brief summary helps orientation but does not replace the documented survey scope. This basis is retained even if site management or contractors change.

Technical principles

Involve the responsible authorities for the project in Luxembourg

Understand the results

Use technical statements for the next decision

Read evidence and authorisations according to their purpose

Check what a document is intended to establish. A qualification, service notification and technical investigation report answer different questions. Bring the records together with their respective requirements. Clients and site management can then trace which prerequisite has already been clarified and which decision is still needed before the proposed activity.

Understand investigation reports and their limitations

Use German technical guidance appropriately

The BFR KMR describe technical relationships in planning, investigation and documentation. For a project in Luxembourg, they may support technical understanding. They do not replace local requirements or responsible authorities. During preparation, therefore record which technical principles are used and which local prerequisites apply to the specific service.

Understand the service scope
Design and findings

Documents for the next construction decision

Illustration: aerial photographs and maps on two screens and printed on a desk.

Historical evidence and the current design

Aerial photograph interpretation is related to the actual groundworks. Its purpose and geographical scope remain distinct from a technical investigation of the ground as it is today.

Understand aerial photograph assessment
Illustration: two people review plans and documents at a table beside a construction vehicle.

Specialist reports for site management

The findings, their locations and limitations are handed over together. This makes clear to those carrying out the work which area has been investigated and which task remains outstanding.

Assess investigation reports
Four people in orange high-visibility vests in front of two excavators on a construction site.
Person with a yellow survey cart on a footpath in front of a hedge.
Questions from planning

Questions about ordnance assessment in Luxembourg

Does every construction plot in Luxembourg need surveying?

Whether a survey is necessary must be assessed for each project. Specific indications, existing records, planned groundworks and applicable requirements are decisive. Select the measurement method only after that assessment.

Who is responsible when ammunition is actually found?

SEDAL is responsible for operations concerning unexploded wartime ammunition in Luxembourg. Stop work in the affected area. Do not touch, move, relocate or further expose the suspicious object. Keep your distance, leave the danger area and keep others away. From a safe distance, notify SEDAL or the Police Grand-Ducale on 113. Do not transport the object to a police station, other official premises or collection point. Follow the responsible authorities' instructions.

Do German permits apply automatically in Luxembourg?

No. German credentials may demonstrate qualifications. Before commissioning, check which activities may be performed in Luxembourg and which credentials or notifications they require against local requirements.

What information does an initial project enquiry need?

A site plan, proposed groundworks with depths, existing reports and known local requirements. Include contacts and the proposed start.

Does a service notification replace technical investigation planning?

No. Assess the administrative prerequisite and technical task separately, then bring them together for the works.

What determines the cost of a project assessment in Luxembourg?

The work involved depends on existing findings, area, intervention depths, suitable methods, access and interference. Necessary preparatory work, interpretation, documentation and handovers form part of the private service scope. For cross-border work, account for the specific supporting documentation and organisational prerequisites needed. Distinguish the authorities' handling of finds from commissioned project services by their respective purposes and responsibility for costs.

Can a German investigation report be used?

Its technical conclusions can be considered if area, depth and task match. Clarify required Luxembourg supporting documentation and responsibilities separately.

Can investigation results be applied to a neighbouring property?

Only insofar as the documented geographical and technical scope actually covers the planned intervention there. Proximity alone is insufficient.

Project enquiry

Your records for a project assessment in Luxembourg

Describe technical requirements

Bring together interventions, earlier results and findings needed.

Include elevation datums, existing utility plans, access and the timeframe. Identify early exploratory works, borehole positions or ancillary pits with their positions and depths as well. Mark sections and unresolved alternatives. Preparation should make it clear which findings are needed first and who brings together current project information between design and construction.

Clarify local prerequisites

Identify contacts, known requirements and necessary supporting documentation.

Organise existing records by purpose: technical investigation, company qualifications, service notification or employee posting. Identify which authority clarifies each prerequisite and who provides the current information. Request missing details specifically. Before the works, check changed activities or personnel deployment against the prerequisites already clarified.

Contact and project enquiry

Discuss your construction project in Luxembourg with us

Describe your construction project and send a site plan with existing investigation reports. We discuss which information is missing, which technical services may be suitable and which coordination is needed before mobilisation.

Your enquiry is coordinated through FONTANA-EOD's head office in Gersheim. Also provide local design contacts and conditions such as railway operations, existing utility lines or several construction phases.

+49 6843 9994997 · info@fontana-eod.de

If ammunition is currently suspected: leave the object undisturbed, leave the danger area, keep others away and notify SEDAL or the Police Grand-Ducale on 113 from a safe distance. A routine project enquiry prepares planned works.

GPR on a construction site
Project enquiry

Have your project assessed

Whether historical aerial photograph analysis, explosive ordnance surveying, surface surveying using GPR, magnetometry or TDEM, deep-ground surveys, downhole surveys, excavation supervision, area clearance or ordnance recovery is needed depends on the location, ground disturbance, depth, ground and existing documents. An early ordnance assessment provides clarity for tendering, programming, occupational safety and construction.

FONTANA-EOD combines its Section 7 SprengG licence, specialists holding Section 20 SprengG certificates of competence, suitable survey and clearance methods, and traceable documentation. Send the site plan, depth of ground disturbance, construction phase and existing documents for an initial technical assessment.