Ordnance surveys for critical infrastructure

A new cable trench, pump foundation or extension at a utility installation often affects more than the construction area. FONTANA-EOD helps operators and designers connect ordnance assessment with access, operating processes and clear section handovers.

Ground intervention

State the location and depth precisely.

Operations

Coordinate access and time windows.

Handover

Record investigation limits.

Assess investigation requirements

Technical assessment

Integrate the construction task into operations

At critical infrastructure, a closed access road, interrupted utility or unavailable installation area may affect other operating processes. An enquiry should therefore describe the function of the affected installation as well as the construction area. Technical ground investigation answers the agreed ordnance question. Operational availability and operator duties are assessed separately by those responsible.

Project references

Selected project examples

References from project practice

Reference projects: sensitive infrastructure – documented project settings

Our examples include energy supply, transport routes and other operating infrastructure. Select a place for the services actually performed.

9 places · 20 linked reference entries

Project information is loaded from the reference list.

Select a project location from the place selector or choose a point on the map.

Reference projects: sensitive infrastructure – documented project settingsLocations of published reference projects. Select a place to read the information from the central reference list. GermanyLuxembourgSchleswig-HolsteinHamburgLower SaxonyBremenNorth Rhine-WestphaliaHesseRhineland-PalatinateBaden-WürttembergBavariaSaarlandBerlinBrandenburgMecklenburg-Western PomeraniaSaxonySaxony-AnhaltThuringiaBonn – 1 reference entryKöln – 3 reference entriesRheinbach – 1 reference entryKoblenz – 3 reference entriesLandstuhl – 3 reference entriesAugsburg – 4 reference entriesSaarbrücken – 1 reference entryHangelar – 3 reference entriesLuxembourg – 2 reference entries
Location reference for a project

The markers show official place centres. The associated references state the construction task, services performed and documented scope.

Map data: © GeoBasis-DE / BKG (2026), VG250 / GN250, dl-de/by-2-0; Luxembourg: ACT / data.public.lu, CC0. Geometries projected and simplified for display.

Investigation task

Relate the ordnance question to the actual intervention

Two people with a tablet beside a marked construction area; plans lie in the foreground.

Describe the ground volume and installation function together

Preparation connects the position and depth of planned work with the installation function affected. A cable trench, pump foundation or new access road may raise different questions. Describe the activity, not only the site name. The operator states which access routes and facilities must remain available. The specialist company establishes the ordnance assessment scope for the ground volume affected and identifies necessary conditions. System assessment belongs to the designated operating and specialist personnel.

Select services for the affected ground volume
Two people discussing plans at a table beside a vehicle on a construction site.

Compare existing results with the extension

Provide earlier reports together with the current plan. Mark whether new work is within the earlier area, reaches additional depths or includes lateral connections. Investigation of a main route may offer different coverage for a new foundation point. Report, plan and restrictions are therefore read together. Preparation records usable knowledge and open questions. An unchanged site name does not replace this spatial and task-specific comparison.

Compare existing evidence with the extension
Project types

Distinguish construction at operating installations

For transport and logistics projects, see information on port and terminal areas, airport and logistics areas as well as transport operators and depots. Technical utility installations are covered in information on data centres, telecommunications sites and waterworks and wastewater treatment plants. For other operating environments, information is available on hospitals and clinics, fire, rescue and security sites as well as energy parks and grid connections.

Person in high-visibility clothing beside a utility trench, with solar panels and wind turbines in the background.

Utilities and technical connections

For a new connection, state the route, connection pits, crossings and work volumes separately. The operator identifies existing installations and their operating contacts. Utility information and ordnance records remain separate design inputs. Investigation is matched to the task and accessible areas. If a connection moves, coverage of the new ground volume is checked before execution. Investigation of a nearby utility is not applied indiscriminately to all new connections.

Assess connecting utilities and crossings
Person beside a survey instrument on a construction site; a wheeled excavator with drilling equipment stands behind them.

Foundations and extensions

New components may extend deeper locally than surrounding paths or existing trenches. Show foundations, excavation and temporary work areas together. The operator describes operating constraints; designers describe interventions. These details are combined for specialist work. A small visible extension does not automatically mean a small ground intervention. Investigation therefore depends on the actual ground volume and available knowledge, not the visible size of the finished component.

Investigate foundations and individual deep areas
Project enquiry for ordnance assessment and surveys.

Access roads and ancillary operating areas

An extension may need new equipment areas, access roads or temporary connections. Describe their construction and groundworks. Even temporary areas may lie outside previous investigation. Operating personnel decide which routes must remain available; the specialist company states its work needs. Accessible investigation sections are developed from this information. Operational-use decisions and technical findings are documented with their respective areas and conditions.

Coordinate operational access and work areas
Prepare the decision

Prepare the operator’s next decision

A new connection is planned

Show the route, connection pits and affected existing installations. Add available ordnance records. The specialist company can assess the conclusion needed for the intervention; operating decisions remain with the responsible personnel.

Only one time window is available

State the date, accessible areas and outstanding prerequisites. Agree a technically suitable scope under these conditions. A desired date alone confirms neither access nor investigation of all planned areas.

A section remains closed

Mark the unavailable area and identify who controls access. The unresolved task remains visible. Neighbouring investigation is not recorded as work on the closed section.

Define the task

Clarify three interfaces before deployment

Access and work area

Identify the operator unit responsible for access, permitted work areas and routes for personnel and equipment. Add required briefings and escorts. A survey date should be tied to an actually usable work window. Sensitive plans are provided through agreed channels only to the extent needed for the task.

Installation operation and supply

Mark installations, utilities and access roads that must remain in use. Operators and construction designers establish whether switching, alternative routes or special windows are required. FONTANA-EOD supplies the requirements of the commissioned ordnance task; operating decisions remain with those responsible.

Construction section and handover

Distinguish the interventions: the documented evidence for a cable trench does not automatically include the deeper foundation beside it. Before handover to the next trade, the completed area, depth and unresolved zones must be identifiable. Route or component changes are checked against documented scope.

Project documents

Keep documents traceable for operators and site management

Defined task

The current intervention plan and existing knowledge provide the traceable starting point. Installation areas and construction depths are assigned. The agreement states which specific question is to be answered for the next step.

Documented work

Report and plan show the area actually investigated and its limits. Unresolved areas remain distinct. This assignment is retained when handing over to other companies so the next activity can be checked against the documented area and depth. Follow-up investigations or exposures are assigned to the affected zone. Recovery of confirmed ordnance is coordinated with permitted activities, local responsibilities and documentation. After actual exposure or clearance, the corresponding records are included.

New maintenance task

For later work, compare the new ground volume with the previous result. The operator keeps associated documents findable. Position, depth and limits are considered together before earlier knowledge is used for a new intervention.

In project practice

Prepare a utility connection beside an operating installation

For a new utility connection beside an existing station, planned alignment, connection pits and known utilities are shown on one plan. Existing ordnance records are assigned to these interventions. Soil, access and possible metal interference affect investigation selection; an equipment name alone does not describe a suitable service.

The operator, site management and specialist company then agree accessible sections. An operationally closed sub-area remains an unresolved task even when neighbouring areas are investigated. Where several employers are involved, hazard information and protective measures must be coordinated for the activities concerned. Risk assessment and cooperation follow §§ 5 and 8 ArbSchG. This coordination takes place before the relevant work.

Preparation and handover

Information that makes the enquiry actionable

Installation and intervention

Assemble location, installation function, plan revision and specific components. Mark position and depth of each activity, existing surfacing and utility information. A general address is insufficient to define the investigation spatially.

Operational conditions

Name access requirements, available hours and the operator’s contact. Add prohibited areas and dependencies on other work. State openly which operating decisions remain outstanding.

Result and distribution

Agree which plans and reports site management receives and who keeps the operator’s copies. Date, boundaries and restrictions should permit later comparison with maintenance or extensions. Technical documentation contributes to this file.

Technical assessment

Describe existing assets and investigation conditions precisely

Metal installations and surfacing

Utilities, installations and surfaced areas may matter for preparation. Provide known information and mark uncertainties. Method is coordinated with the investigation objective and actual conditions. A generic equipment name does not define a suitable service for every area. Preparatory steps and additional investigation are established for the task. Achievable conclusions remain tied to work actually performed.

Historical records and aerial photographs help delimit suspected areas. Depending on soil, expected objects and interference, technical investigation considers magnetic or electromagnetic methods including TDEM and, where appropriate, GPR. TDEM records time-dependent electromagnetic responses from conductive bodies. GPR shows subsurface reflections; moisture, conductive soils and installations can limit results. Methods and interpretation are matched to the required ordnance conclusion.

A signal is assessed using measurement conditions and further findings information; object identification needs appropriate specialist clarification. Records show where known utilities or metal installations affect interpretation. Such areas are distinguished from the remaining field and compared with the trench or foundation point. The next investigation follows the unresolved question.

Spatial and temporal access

Execution needs clear areas that can be entered or driven on and available times. Different installation parts may have different access conditions. The operator identifies them, designers describe construction and the specialist states the work area needed. Deferred sections remain visible and are not covered automatically by work elsewhere. Access or design changes trigger renewed agreement on the appropriate scope.

Necessary investigations and protection are planned before ground interventions during vegetation clearance, demolition, breaking out or creation of access and work areas. Areas accessible later are investigated before follow-on interventions.

Relationship between measurements and construction activity

The required conclusion is derived from the intervention. A narrow connection may involve a different ground volume from a nearby foundation. Position and depth are considered together. The report records the task performed and its conditions; later use retains that reference. A result is not transferred solely because another area is nearby or shares an installation name.

For deeper foundations or chambers, it is checked whether surface investigation covers the required ground volume. Where survey boreholes are needed, position, layout, casing, depth and documentation are coordinated with utilities and the investigation objective. Required investigations and protection are also established before creating these access points.

If necessary advance investigation cannot be completed, the suitability of construction-phase investigation is assessed. Each layer is technically surveyed and assessed before controlled removal with supplementary visual inspection. Steps repeat to the agreed excavation bottom. Layers, stop signals, instruction authority, reporting and documentation are agreed before work starts.

Next steps

Coordinate specialist work with operations and construction

01

Submit the task and plan revision

Assemble planned components, positions, depths and the valid plan revision. State the next decision needed. Attach existing reports with appendices for spatial checking. Mark outstanding details explicitly. Suitable sources and aerial photographs are analysed for open historical questions. Findings are related spatially to present-day installations and interventions for further investigation planning.

02

State operational conditions

The operator names contacts for access and operations. Available areas, coordination needs and time conditions are supplied. The specialist then describes requirements for the activity. A proposed window is considered with actual prerequisites, not alone as confirmation of execution.

03

Agree a suitable investigation scope

Intervention, knowledge and local conditions define the task and method. Achievable statements and unresolved sub-areas are identified. Parties establish preparation needed before execution. Design changes are communicated before the relevant step and checked against the agreed scope.

04

Carry out the investigation

The commissioned investigation is performed in the agreed installation areas. Data, findings and restrictions are recorded with position, depth and plan references.

05

Assess results

Data and findings receive specialist interpretation. Unresolved areas, follow-up investigation and the next decision are identified for operators, designers and site management.

06

Assign results to the section

After work, report and plan appendices are handed over together, showing actual scope and restrictions. The next trade checks coverage of its activity. Later additions use this documented basis rather than a generic site name as evidence.

Construction phases

Connect operations and specialist work in the construction sequence

Preparation before an available window

An agreed window is usable only if required documents, access and operating decisions are available. State the date and outstanding prerequisites. The specialist describes task conditions; the operator clarifies operational questions. Feasibility during the planned outage is checked with the operator against actual prerequisites. Suitable scope is agreed from the task and local conditions.

Sectional work during ongoing operations

If only some areas become accessible, the scope is divided accordingly. Boundaries are shown and updated on the plan. Each section identifies available conclusions and open areas. Handover remains tied to this status. A continuous installation site is not treated as uniformly investigated solely for organisational reasons. Further sequence is agreed with the operator and site management according to actual conditions.

Extension or maintenance after completion

Later work may affect a different ground volume. A new commission therefore begins with the activity and comparison of existing documents. An original construction report is neither discarded wholesale nor accepted without review. Position, depth and limits determine usability. Unresolved questions are assigned to the new intervention. Old documentation remains as a historical record so changes and additional work stay traceable.

Working approach

Agree responsibilities and service scope traceably

Prepare the specialist service with the operator

FONTANA-EOD defines ordnance work from the intervention, documents and actual conditions. Operators and designers provide information from their responsibilities. Open questions are assigned so scope is understandable before work. The report records work and limits and supports decisions about investigated interventions. Operational capability and other technical requirements are assessed by designated personnel.

Discuss the investigation task

One contact for each decision

Access, switching and construction design may have different responsible parties. Name them so preparation queries can be addressed directly. A general project address is often insufficient for time-critical changes. Coordination identifies missing information or operating decisions and who supplies them. Operating personnel make the corresponding operational decision.

Keep unresolved areas visible

An operationally inaccessible section remains an open task on the plan, not part of an investigated neighbour. Required access and intervention are stated. When conditions change, additional scope can be agreed specifically. Documentation distinguishes planned overall works from specialist work actually carried out. Operational importance does not change this technical reference.

Check changes before the next intervention

New depths, relocated foundations or added connections are checked against the report. Changed design is supplied before the work. Coverage of the new volume and required conclusion is decisive; calling a change minor internally is insufficient. The specialist can then explain what further clarification is needed.

Keep documents for later work

Report and plans remain together in the responsible project records for later repairs or extensions. Date, location and restrictions stay identifiable. A single result line should not be separated from them. This assignment is passed on when management or contractors change. New activity then receives its own comparison with the documented ground volume.

Project site

Assign the site and operating responsibilities

Illustrated map of Germany with location markers on a construction site.

Define the site for specialist work

State the place, installation and affected sub-area. Connect the overview with intervention details. For several operating areas, show the commissioned areas and access routes. The address provides orientation but not spatial scope. Supply the information needed for the task; responsible parties agree the extent and distribution of operating documents according to project needs.

Illustrated map of Germany with location markers on a construction site.

Identify existing matters and contacts

Project information, earlier investigations and agreed requirements are assigned to their original purpose. Record further contacts. The regional overview helps identify the site; project documents establish specifics. Investigation is prepared for the actual intervention. Legal classification and operator duties are established separately by those competent. Different decisions remain distinguishable even within a shared project organisation.

Understand the results

Distinguish technical conclusions from operating decisions

Read the result within its agreed scope

The BBK emphasises operating responsibilities, information channels and interdependencies in critical infrastructure. Planning checks these against the ground intervention: who provides access, which installation remains operating and who decides switching? Legal classification is established separately by the competent authorities.

An investigation report describes a task under documented conditions. Its use includes reading plans, depth references and restrictions. Designated personnel assess installation functionality separately. New interventions are checked for coverage of position and depth. Unclear information is returned as a specific question. This supports decisions without extending results to other areas or future changes.

Explore results and terminology

Identify the next information needed

An enquiry need not start with a method. Describe the activity and decision first. The specialist can assess existing information and suitable steps. Utilities, ground conditions and ordnance remain separate questions even within the same volume. The service overview explains this. Scope is then agreed with designers and operators against actual conditions.

Understand the service scope
Working together

Keep operating and technical decisions separate

Operator’s responsible personnel

Operating personnel define access and necessary operating decisions, contacts and available areas. The specialist receives information needed for its agreed task. Operator duties remain with the designated operating personnel.

Planning and construction management

Designers describe interventions and changes. Site management coordinates activities and documents. Investigation scope is compared with each activity and reassessed where requirements differ.

Specialist company and competent bodies

FONTANA-EOD performs the agreed private specialist service. Official decisions and site requirements remain with the competent bodies. Reports document the area, depth, service scope and limits. Legal classification and operator duties are handled separately by those responsible.

In Germany, state ordnance disposal services and locally competent authorities carry out hazard response and find management. Their involvement and public-order or building-control tasks are established for the project location. Outside Germany, local responsibilities apply. Contacts, requirements and reporting are assigned to the specific works.

Documents and execution

Connect project documents with actual existing assets

Two people discussing plans at a table beside a vehicle on a construction site.

Assign existing knowledge completely

Older plans and reports are compared with current assets and work. Changes of names, access or components should be clear. Earlier documents may be valuable but need traceable links to the new intervention. Supply appendices where possible. Assessment uses their actual scope. A known address alone does not show that earlier work covers today’s connection or foundation.

Assign knowledge and appendices traceably
Two people discussing plans at a table beside a vehicle on a construction site.

Provide results to site management and operators

Results are assigned so site management and operators can identify their technical reference. Applicable versions remain clear across revisions. Restrictions and open areas belong in handover. A short status aids orientation but does not replace reports and plans. Later work compares these documents again. Technical records retain their area, depth, service scope and limits as usable project information.

Understand documentation
Four people in orange high-visibility vests in front of two excavators on a construction site.
Person with a yellow survey cart on a footpath in front of a hedge.

Technical information

Critical infrastructure: brochure

Work at critical infrastructure requires careful coordination with operations and construction design. The brochure explains preparation, suitable investigations and traceable result documentation.

1 / 8
Critical infrastructure: brochure – page 1

German · 8 pages

Questions and answers

Questions from operators and project managers

Does all critical infrastructure need a complete ordnance survey?

Investigation requirements depend on suspicion indicators and the specific project. Calling an installation critical determines neither a generic survey depth nor investigation of the whole site. The affected interventions and applicable requirements are decisive.

Can an investigation take place during ongoing operations?

This depends on access, hazards, interference and the method selected. Conditions are agreed with the operator and site management before deployment. The operator establishes the necessary operating adjustments.

Who decides on shutdowns and operational switching?

These decisions belong to the responsible operating personnel. The ordnance specialist company describes its work requirements and technical restrictions. Operational permission, ordnance assessment and contractual construction handover remain separate decisions.

Is an existing main-route investigation sufficient for a new connection?

Only if the documented investigation scope actually covers the connection. New lateral trenches, deeper chambers or changed foundations must be compared with the position, depth and limits of the existing result.

How do ordnance assessment and operational safety assessments relate?

The commission described here concerns ordnance assessment of the agreed intervention area. Resilience assessment, IT security testing and broader critical-infrastructure certification are separate tasks under their respective responsibilities. The operator receives the agreed specialist documents for further project organisation.

What should be done if a suspicious object is found during earthworks?

If an unexpected suspicious object is found, stop work in the affected area immediately. Do not touch, move or uncover it further. Leave the immediate area, keep your distance and keep others away without putting yourself at risk. In Germany, notify the police immediately on 110; outside Germany, use the local emergency procedure. The authorities determine what happens next. Inform the operator, site management and the client; internal reporting must not delay the emergency call.

Which factors determine service scope and cost?

Area, intervention depth, ground, investigation objective, existing documents, local interference and accessible work areas are decisive. Operational windows may affect organisation. Method, depth and cost are determined by these conditions and the specialist services needed.

How do later maintenance works remain traceable?

Reports, plan appendices and their plan revision are kept together in project records. For later works, the new ground volume is compared with the earlier scope. The same installation name does not replace this assignment.

Project enquiry

Provide documents for a specific enquiry

Intervention and existing knowledge

Send the plan limited to the intervention with components, depths and valid revision. Add the existing ordnance assessment and reports with appendices. Mark variants where areas are undecided. The enquiry can then identify the next decision. These details turn a general site description into a specific task. Documents are coordinated with project parties to the extent actually needed.

Operator contact and intended sequence

Name the construction designer and operating contact. Provide dates, available areas and access requirements. State pending operating decisions. FONTANA-EOD can then assess service requirements. Final coordination connects scope with actual conditions, operating requirements and time windows.

Further primary sources

Sources for technical assessment

The Baufachliche Richtlinien Kampfmittelräumung contain requirements for historical and technical investigation, clearance planning and documentation within their defined federal remit. Application to the work, local requirements and responsibilities are established separately.

Project enquiry

Have your project assessed

Whether historical aerial photograph analysis, explosive ordnance surveying, surface surveying using GPR, magnetometry or TDEM, deep-ground surveys, downhole surveys, excavation supervision, area clearance or ordnance recovery is needed depends on the location, ground disturbance, depth, ground and existing documents. An early ordnance assessment provides clarity for tendering, programming, occupational safety and construction.

FONTANA-EOD combines its Section 7 SprengG licence, specialists holding Section 20 SprengG certificates of competence, suitable survey and clearance methods, and traceable documentation. Send the site plan, depth of ground disturbance, construction phase and existing documents for an initial technical assessment.