Ordnance assessment for housing and site development

Before housing construction, excavations, property connections and site-development works are checked against existing ordnance assessments. FONTANA-EOD establishes the investigation requirements for individual areas, depths and construction sections with the project owner and designers. Send the site plan, planned interventions and depths and existing assessments so that the next investigations can be agreed.

Construction area

Clarify the plot and alignments.

Depth

Coordinate the excavation and utilities.

Documentation

Maintain a reliable project file.

Arrange specialist assessment of the project situation

Project situation

When housing and development sites should be assessed for ordnance

Whether an investigation is needed depends on suspected contamination, existing knowledge and the specific ground intervention. Preparatory drilling and property connections are also considered. The decisive factors are suspicion indicators, planned depth, construction phase, surface, existing utilities, excavation sequence and the required evidence. FONTANA-EOD brings these details together to determine the technically appropriate next step for document review, surveys, excavation monitoring or documentation.

Project references

Selected project examples

References from project practice

Reference projects: housing and site development

For housing construction and site development, planned earthworks and existing documents must match. Select a place for examples from our project practice.

7 places · 10 linked reference entries

Project information is loaded from the reference list.

Select a project location from the place selector or choose a point on the map.

Reference projects: housing and site developmentLocations of published reference projects. Select a place to read the information from the central reference list. GermanyLuxembourgSchleswig-HolsteinHamburgLower SaxonyBremenNorth Rhine-WestphaliaHesseRhineland-PalatinateBaden-WürttembergBavariaSaarlandBerlinBrandenburgMecklenburg-Western PomeraniaSaxonySaxony-AnhaltThuringiaDüsseldorf – 3 reference entriesBonn – 1 reference entryKöln – 1 reference entryAachen – 2 reference entriesBergisch Gladbach – 1 reference entryBochum – 1 reference entryOffenbach am Main – 1 reference entry
Location reference for a project

The markers show official place centres. The associated references state the construction task, services performed and documented scope.

Map data: © GeoBasis-DE / BKG (2026), VG250 / GN250, dl-de/by-2-0; Luxembourg: ACT / data.public.lu, CC0. Geometries projected and simplified for display.

Project situations

All housing and site-development applications

Select your project. The specialist pages explain the plans needed, typical interventions and comparison with areas already investigated.

Specialist personnel with a plan and survey trolley on a construction site in front of homes under construction.

Ordnance surveys for new developments

Clarify construction areas, development works, construction phases and later civil-engineering packages before implementation.

Assess the new development
Specialist personnel with a plan and survey trolley on a construction site in front of homes under construction.

Excavation monitoring for construction pits

Define excavation methods, document investigation limits and agree reporting procedures.

Plan excavation monitoring
Specialist personnel with a plan and survey trolley on a construction site in front of homes under construction.

Ordnance assessment for underground car parks and basements

Assess deep excavations, retaining works, excavation bottoms, borehole positions and underground components for the project.

Assess underground car parks and basements
Specialist personnel with a plan and survey trolley on a construction site in front of homes under construction.

Ordnance surveys for access roads

Clarify road alignments, utility trenches, chambers, service networks and construction sections before civil-engineering work.

Agree development alignments
Project phases

Understand the phases of a housing project

Specialist assessment delivers its benefit when it is integrated early into land decisions, geotechnics, development, building construction and excavation.

Before deciding on a property

Early project phases usually require a reliable assessment of suspicion rather than full technical execution. Location, land parcel, planned use, approximate intervention depths and existing documents are often enough. This establishes whether detailed aerial-photo analysis, technical surveys or further coordination are needed before purchase, design, geotechnical investigation or tendering.

Before geotechnical investigation

Borehole positions, driven core sampling, trial pits, survey starting points and geotechnical investigations target the subsurface. If ordnance suspicion exists or documents are unclear, the points, depths and access areas that need specialist preparation should be established before these interventions. This keeps geotechnics, ordnance assessment and scheduling connected.

Before procurement of development works

Development-work procurement usually includes roads, sewers, water, electricity, telecommunications, lighting, property connections and chambers. For ordnance assessment, these trades should not be considered separately when they affect the same ground. Alignment-based planning helps connect surveys, excavation sequence, utility protection and later evidence.

Before procurement of building works

At the transition from development works to building construction, it must be clear which areas have already been investigated and which interventions remain unresolved. Excavation, basements, underground car parks, foundations, external works and service connections may require different statements. A clear handover prevents development-work results from being applied indiscriminately to building construction.

During demolition and site clearance

Demolition, vegetation clearance, topsoil removal, breaking out, removal of surfacing and site preparation change access and may create new investigation conditions. Existing foundations, basement remains, rubble layers and fill affect measurability and safety. Necessary investigations and protective measures are planned before ground interventions during vegetation clearance, demolition, breaking out or creation of access and work areas. Areas accessible later are investigated separately before the relevant follow-on interventions.

During utility and service-network design

Utility design in housing includes not only main routes but also property connections, chambers, handover points, infiltration trenches, drainage installations and temporary site supplies. These interventions may lie outside the later building footprint and still be relevant to ordnance assessment. The investigation must therefore record alignments, depths and construction phases individually.

During excavation logistics planning

Excavations need access, retaining works, slopes, dewatering, work spaces, bottoms, bearing areas and removal sequences. Ordnance assessment thus becomes a construction-sequence issue. Planning shows which areas can be investigated in advance and whether construction-phase ordnance surveying is suitable for the remaining excavation. Reporting procedures are agreed with site management and safety coordination.

When projects change

Housing projects often change: underground car parks are extended, utility alignments moved, basements omitted, excavations deepened or construction sections redefined. Each change may affect the ordnance assessment statement. The project file should therefore be updated when position, depth or construction activity differs materially from the original assessment.

Project structure

Investigation areas for plots, buildings and development works

Ground interventions differ between an individual house, a new development and an underground car park. Building envelopes, development alignments and excavations are shown on the site plan with their respective areas and depths.

Building plot

For an individual building plot, the question is not only whether suspicion exists. The building envelope, property connections, excavation, foundations, external works, utility routes and planned intervention depth are decisive. Early assessment helps prepare documents, aerial-photo analysis, surveys and possible excavation monitoring so that the project owner, designers and civil-engineering contractor have a reliable decision basis. Property connections and external works also belong on the site plan with their planned interventions.

New development

A new development consists of multiple construction areas, road alignments, utility trenches, chambers, green spaces, drainage and construction sections. Ordnance assessment must therefore be structured spatially and over time. A result for one sub-area does not automatically replace assessment of all later phases. For new developments, suspicion indicators, infrastructure provision, site preparation and evidence are brought together.

Apartment building

Apartment buildings combine deep excavation, construction pits, foundations, basements, service connections and often restricted inner-city conditions. Assessment should establish which areas can be surveyed beforehand, where borehole positions or deeper interventions matter and how site management can handle restrictions. The location and depth of the excavation must be distinguished from connections and external works.

Neighbourhood development

Neighbourhood developments combine demolition, existing assets, several new construction areas, infrastructure works, construction phases, underground car parks, external works and later changes of occupier. For ordnance assessment, keeping project sections distinct is particularly important. Each phase needs a clear investigation area, an appropriate method and traceable documentation. Demolition areas and new construction areas are assigned to their investigation sections.

Excavation and earth removal

Excavations create their own investigation and safety situation because earthworks intervene directly in the subsurface. When advance surveys are limited, it is assessed whether construction-phase ordnance surveying is suitable for the planned excavation. Merely observing excavator operations does not replace necessary surveying. Excavation sequence, reporting procedures and documentation are agreed with site management before work begins.

Underground car parks and basements

Underground car parks, basements, retaining-work alignments, excavation bottoms, chambers and underground components need a different depth reference from near-surface external works. Position, target depth, borehole positions, excavation shape, adjoining structures and technical access are decisive. Retaining works, excavation bottoms and deeper chambers require their own position and depth details.

Access roads

Access roads are not purely a road-construction matter. They combine routes, utility trenches, sewers, chambers, service corridors, property connections and construction sections. Ordnance surveying must therefore be planned by length, alignment and construction phase. Results must show the road section investigated, its lateral boundaries and the depth reached.

Available documents for housing construction

For all project situations, site plans, land parcels, building limits, excavation plans, utility plans, geotechnical data, aerial-photo analyses, old documents, requirements and schedules help make the right technical follow-on decision. More complete documents allow technical methods, investigation depth, construction sequence and documentation scope to be coordinated better.

Select methods according to the construction activity

Housing and development may involve historical aerial-photo analysis, surface surveys, GPR, magnetometry, TDEM, deep-ground surveys, borehole surveys, excavation monitoring or ordnance recovery. The method is selected according to the specific construction activity. Surface, interfering objects, surfacing, utilities, depth, access, time windows and evidence requirements are decisive.

Evidence for changing project parties

Housing projects frequently pass between development, design, infrastructure works, building construction, civil engineering, external works and sale or letting. Documentation must therefore be technically correct and readable by different parties. Investigation area, method, conditions, result, restrictions and follow-on decision should be presented so they can be reused in the project file, site management and procurement.

Ease pressure on construction early

Ordnance assessment that begins shortly before excavation often faces time and coordination pressure. Assessment before a property decision, tendering, geotechnical investigation, utility design or civil-engineering procurement is more useful. Survey windows, borehole positions, excavation areas, development alignments and evidence can then be integrated before subsequent trades and construction schedules are fixed.

Prepare an enquiry correctly

FONTANA-EOD does not need a completely finalised design for an initial specialist assessment. The project location, area, construction objective, planned interventions, depths, construction phase, documents available and desired next step must be identifiable. This allows it to be established whether document review, technical surveying, excavation supervision or a combination is appropriate first.

Supporting documentation

Find investigated areas and depths in the report

The report and site plan must show which works were investigated and which areas remain unresolved. This applies to property connections as well as an entire excavation.

Construction-area boundaries

Construction-area boundaries show the area actually affected by the planned works. They should not be confused with property boundaries because utilities, construction roads, storage areas, retaining works and external works may lie outside the building footprint. Documentation records which intervention was investigated or supervised.

Depth information

Depths must be considered separately for each construction activity. Basements, underground car parks, chambers, sewers, property connections, infiltration trenches, piles, borehole positions and foundations may have different target depths. Without these details, the specialist conclusion can be applied to the later construction sequence only to a limited extent.

Utility plans

Utility plans help integrate existing and planned service corridors into ordnance assessment. They affect access, occupational safety, measurability and excavation sequence. In development projects, utilities often provide the decisive reference because they create long routes with many depth changes.

Aerial-photo analysis

Historical aerial-photo analysis and suspected-area analysis can provide the initial specialist basis when use history or wartime effects are not sufficiently established. They do not automatically replace technical surveying but help prepare investigation areas, priorities and follow-on decisions on a firmer basis.

Measurement and supervision records

Measurement data, borehole records, supervision reports and photographic records must be connected to the site plan, construction section and execution status. Only then can results be traced later and used meaningfully by site management, clients, project management or the competent parties.

Findings assessment

Findings, anomalies and limited statements require specialist assessment within the project context. Measurement conditions, position, depth, construction activity and possible follow-up measures are considered together. This assessment is essential so that project parties know which next steps are technically appropriate.

Handover to subsequent trades

After investigation, information often passes to civil-engineering, building, external-works and surveying teams, utility operators or site management. The handover should clearly document the areas dealt with and the questions remaining. This prevents mistaken assumptions later in construction.

Update the project file

In multi-phase housing and development projects, the project file grows with the work. New construction sections, changed depths, additional utilities, variations and findings should be added traceably. Ordnance assessment thus becomes part of ongoing project management rather than a single document.

Sequence

Specialist assessment sequence for housing and site development

Documents and interventions are compared at the outset. The agreed investigation, assessment and handover of results then follow.

01

Record project details

Site, construction objective, land parcel, construction area, phase, depths and contacts are collected.

02

Review documents

Site plans, aerial-photo analysis, geotechnical data, utility plans, old documents and existing requirements are assessed.

03

Separate investigation areas

Building plots, excavations, underground car parks, utility trenches, roads, chambers and external works are defined by intervention and depth.

04

Determine the method

Historical analysis, surface surveys, deep-ground surveys, borehole surveys or excavation monitoring are selected for the project.

05

Plan execution

Access, schedules, exclusion areas, occupational safety, utility protection and communication with site management are coordinated.

06

Carry out measurement or supervision

The commissioned service is carried out in the defined area and documented with location references.

07

Prepare the assessment

Results, interference fields, statement limits and follow-on decisions are brought together through specialist assessment.

08

Continue the project

The evidence is incorporated into procurement, site management, excavation, development works or further coordination.

Project routes

Further information for your construction project

Property boundaries, excavations and development alignments are recorded on the site plan with their intervention depths. Existing assessments are compared with these work volumes.

Prepare a new development

Multiple construction areas, roads, utility alignments, drainage and construction sections are planned together.

Assess a new development

Plan an apartment building

Record excavation, foundations and connections with their intervention depths; consider access and neighbouring buildings.

Prepare an apartment-building project

Supervise the excavation

When advance investigations are limited, the suitability of construction-phase ordnance surveying for the remaining excavation areas is assessed. Technical investigation and assessment of each working layer precede controlled removal. An imminent excavation date alone does not justify selecting the method.

Arrange supervision of the excavation

Survey the access road

Road alignments, utility trenches, chambers and service networks are prepared by length.

Coordinate the access road
Quality during construction

Establish measurement conditions before investigation

Surfaces, utilities and metal installations may restrict investigation. These conditions are recorded before method selection and documented later with the results.

Interfering objects in housing construction

Metal fences, reinforcement, scrap, old foundations, fill, utilities, chambers and site equipment may affect measurement data. These factors should be considered before method selection, not appear only in the report. This establishes whether an area can be surveyed near the surface, whether borehole surveying is needed or whether excavation should receive specialist supervision.

Surfaced areas

Asphalt, concrete, paving, aggregate base layers and trafficked site areas change measurement conditions. In housing projects this often concerns former yards, existing access roads, streets, parking areas and demolition areas. The specialist assessment should state whether the surface permits informative measurement or a different approach is needed for the planned activity.

Restricted inner-city sites

Apartment buildings, infill development and neighbourhood projects often have restricted access, neighbouring buildings, retaining works, traffic management and excavation logistics. Ordnance assessment must incorporate these conditions so that exclusion zones, measurement areas, borehole positions, excavation sequence and reporting procedures match the actual site situation.

Schedules and dependencies

Development works, geotechnics, ordnance assessment, demolition, civil engineering, building construction and external works are linked in time. Planning assessment too late or without reference to the construction phase creates avoidable gaps. Early specialist assessment shows which areas should be dealt with in advance, during excavation or before subsequent trades.

Communication with owners and buyers

Housing-project documents are often passed to buyers, co-ownership associations, investors, project managers or later operators. Documentation should therefore show clearly which area, intervention and construction section were assessed. This prevents misunderstandings when information is later used outside the original site-management team.

Statement limits

A reliable ordnance assessment describes limits as well as results. Inaccessible sub-areas, technical interference, changed design, new intervention depths and uninvestigated ancillary areas must remain identifiable. This transparency matters in housing because projects often develop in stages and later decisions rely on existing documents.

Enquiry details

Assemble the project location, interventions and existing documents

Mark planned work on the site plan and state its depths. Add existing assessments and the next planned date.

Project location and area

For initial assessment, supply the project location with address, land parcels, site plan and marked sub-areas. It is particularly helpful to show which areas relate to buildings, excavation, utilities, development works, external works or later construction sections.

Planned interventions

Describe the type and depth of planned interventions: excavation, basement, underground car park, chamber, utility trench, foundation, borehole, retaining works, infiltration trench or roadworks. This allows the appropriate investigation area to be defined much more precisely.

Available documents

Supply existing aerial-photo analyses, geotechnical data, utility plans, old documents, demolition records, authority requirements and earlier expert reports as completely as possible. Incomplete documents also help if their status and relevance are clear.

Desired next step

The enquiry should state whether an initial suspicion assessment, method recommendation, survey, excavation monitoring or evidence preparation is needed. FONTANA-EOD can then align its response directly with the project decision. Contacts, schedules, procurement status, planned civil-engineering packages and known restrictions also help the initial assessment fit the technical and organisational project sequence. It also matters whether work is procured in sections, later construction areas remain inaccessible and documents will be reused by buyers, developers, site management or subcontractors.

Further detail

Investigate and hand over construction sections separately

Before handover to the next contractor, existing results are compared with that contractor’s planned work. Unresolved work volumes and additional investigation tasks are marked on the site plan.

Keep construction sections separate

Larger housing and development projects should describe sections separately even on the same property. Assessment of the first excavation, utility alignment or access road does not automatically replace later external works, extensions or additional chambers. Separation protects the quality of conclusions and makes variations easier.

Agree the investigation scope with the designers

The ordnance measures required for a project depend on existing knowledge, planned ground interventions and local measurement conditions. We agree the technical task with the designers and define the investigations, supervision and evidence needed.

Decision situations

Which project question should be clarified first

Housing and development projects have different starting points. The first specialist decision depends on whether the plot, neighbourhood, excavation, underground car park or development alignment is the main issue.

Before property acquisition

While a building plot is still under consideration, suspicion indicators, existing documents and possible investigation areas are assessed early.

Arrange assessment of a building plot

Before land-use and infrastructure design

For new developments and neighbourhoods, construction areas, roads, utility alignments, drainage and phases must be considered together.

Assess a new development

Before excavation and underground car parks

Deep interventions for basements, underground car parks, retaining works, excavation bottoms and chambers need different depth and evidence references from near-surface work.

Assess underground car parks and basements

Before excavation starts

Where advance assessment is limited, the suitability of construction-phase ordnance surveying is established. An imminent start date alone does not determine the method.

Plan excavation monitoring

Before utility and road construction

For roads, property connections, sewers and chambers, affected sections are described by width and depth.

Agree development alignments

Before procurement and site management

Service limits, methods, investigation areas and evidence should be defined before procurement and the construction schedule.

Prepare evidence
Project decision

From the construction objective to documented ordnance assessment

The construction objective, existing knowledge and planned interventions are compared before method selection.

Understand the construction objective

A detached house, apartment building, new development, neighbourhood development and access road create different interventions and evidence requirements.

Determine the intervention depth

Excavations, basements, underground car parks, utility trenches, chambers, retaining works, piles, infiltration trenches and development alignments are considered separately by depth and position.

Agree intervention depths

Review suspicion records

Aerial-photo analyses, old documents, preliminary decisions, geotechnical data, utility plans and known requirements help define the investigation area.

Arrange a suspicion assessment

Select a method

Surface surveys, deep-ground surveys, borehole surveys, excavation monitoring or combinations are selected according to surface, interference fields, depth and construction phase.

Understand the service

Protect the construction sequence

Assessment, excavation, development, foundations and subsequent trades must be coordinated in time and organisation.

Maintain evidence

Documentation describes the area assessed, method, conditions, assessment and follow-on decision for the client, designers and site management.

Clarify documentation
Documentation

Evidence for the project owner, designers and site management

Housing projects need documents that remain understandable through changing construction sections, subcontractors and approval or procurement interfaces.

Location and construction area

Address, land parcel, building limit, building envelope, development alignment, excavation and sub-areas are described unambiguously.

Depth and construction phase

The planned depth is stated separately for excavation, basements, underground car parks, utilities, chambers, foundations and external works.

Investigation scope

The report must show which areas were investigated or supervised using which method and under which conditions.

Findings assessment

Anomalies, suspicion indicators, interference fields and statement limits are assessed by specialists and linked to the next step.

Handover to site management

Site management and contractors need clear handovers so that assessed areas, unresolved questions and reporting procedures are known during construction.

Project file

The project file brings together documents for clients, designers, contractors and other parties. Its reliability increases with the precision of the match between investigation area and construction activity. After actual exposure or clearance work, the corresponding findings and clearance records are included.

Prepare documentation
Describe work volumes

Describe buildings, excavations and development using the same location reference

For technical investigation, area-wide, linear and point ground interventions are recorded separately. A shared plan revision connects plots, buildings and development sections with their respective depths.

Before earthworks, existing ordnance assessments are checked for coverage of the planned areas and depths.

Define the actual work volume before investigation

The building footprint alone does not describe the whole ground volume involved in construction. Excavation width, slopes or retaining works, working space and any foundation elements supplement the building geometry. For basements and underground car parks, position and depth references must match the current excavation plan.

Access roads, utility trenches and chambers are stated with alignment, width and depth. Property connections and additional excavations may differ from the standard section. Preparatory borehole positions and temporary interventions are also included where they belong to the intended construction sequence.

The investigation report and execution design use traceable area, section and point identifiers. After a plan change, it is checked which results still fit and which volumes need additional consideration. Completed and unresolved areas remain distinct at handover.

01

Property and building boundaries

Land parcel, building limit and work area are connected on the site plan. Neighbouring properties or later sections are not included without spatial evidence.

02

Excavation and foundations

Excavation depth, lateral working space, retaining works and foundation elements describe the ground volume needed. Investigation is checked against these dimensions and the installation method.

03

Utilities and chambers

Alignment, trench width, bottom and larger chamber areas are stated separately. Additional connections or crossings receive their own identifiers when their geometry differs.

04

Borehole positions and preparatory work

Position, target depth and drilling method are described before preliminary ground investigations. Existing results are checked for coverage of this exact intervention.

05

Existing assets and measurement access

Utilities, old foundations, surfacing and vegetation may restrict access and measurement conditions. The sequence states when affected areas will become accessible.

06

Plan changes and handover

Changed buildings, depths or connections are compared with the documented status. The documents identify which areas remain usable and where further tasks exist.

Select an investigation

Select investigations for buildings and development works

Two people discussing plans at a table beside a vehicle on a construction site.

Compare suspicion records with the current construction project

Plots, buildings, development alignments and planned depths are compared with existing ordnance records. Preparatory boreholes and property connections are also part of the intended intervention. Comparison shows which results fit and which work volumes require further investigation.

Compare existing results with the construction project
Two people with a tablet beside a marked construction area; plans lie in the foreground.

Agree methods according to ground volume and access

An accessible open area, deep basement excavation and narrow utility route may need different investigations. Ground structure, technical installations and construction conditions affect the conclusions achievable. Areas not sufficiently investigated are recorded with position, depth and the next step needed.

Select methods according to ground volume and access
Working approach

Define investigation areas for buildings and development works

FONTANA-EOD coordinates investigated areas with planned work and documents which statement applies to each construction section.

From the construction objective to the investigation area

FONTANA-EOD records planned interventions for excavations, foundations, underground car parks, utility trenches and external works separately. For method selection, their positions and depths are checked against suspicion indicators, existing knowledge and measurement conditions.

Agree the working approach

Define the construction section precisely

Investigation is tied to construction areas, alignments, depths and phases so that statements remain useful during construction.

State method limits

Surfacing, utilities, reinforcement, interfering objects and access are considered as technical conditions.

Involve site management

Handovers, reporting procedures, work areas and documents are prepared so that the site can use them.

Keep evidence understandable

Reports and plans should remain traceable for clients, designers, contractors and competent parties.

Coordination

Roles and interfaces in housing and site development

Housing and development involve clients, designers, contractors, civil engineers, utilities, site management and competent authorities.

Client

Project owner, operator or development body

Those responsible provide the project objective, area, construction section, documents and required evidence. They decide which services to commission and which parties to involve in the project.

Design

Design office and project management

Designers and project managers translate the construction objective, intervention depth, schedule and procurement requirements into assessable tasks. They need reliable information to integrate ordnance assessment into the bill of quantities, schedule and project file.

Execution

Building and civil-engineering contractors

Construction teams need clear work areas, documented investigation steps, agreed reporting procedures and safe handovers between surveying, excavation and subsequent trades.

Specialist contractor

FONTANA-EOD

FONTANA-EOD assesses suspicion indicators, methods, investigation depth, construction sequence and evidence for the project. The service remains limited to the commissioned technical investigation, supervision and documentation.

Competent authorities

Authorities and ordnance disposal services

In Germany, the ordnance disposal services of the federal states and the locally competent authorities carry out hazard-response and find-management duties. Their involvement is established for the project location; outside Germany, local responsibilities apply. Private specialist services support project preparation and communication between the parties within the commissioned scope.

The local public-order authority and, where relevant, the building-control authority are involved in their project-specific roles. Requirements, contacts and reporting procedures are assigned to the affected plots, development alignments and construction sections.

Occupational safety

HSE and safety coordination

HSE teams, health-and-safety coordinators or safety officers consider investigation areas, exclusion zones, findings procedures and site organisation. Specialist documentation helps incorporate these matters into construction.

Regional context

Identify the project location and competent authorities

The address, land parcels and site plan help assign existing documents and local contacts.

Illustrated map of Germany with location markers on a construction site.

Record the project region

The enquiry needs the address, land parcels, construction-area boundaries and responsible parties. The region affects interfaces, available documents and coordination procedures.

Check the project region
Illustrated map of Germany with location markers on a construction site.

Federal state and procedures

Competent authorities, applications and reporting procedures depend on the project location. Existing official information is considered in planning.

Prepare regional assessment
Use results correctly

Use results for construction sections and later foundations

Compare development and building works separately

Investigation for a road or sewer does not automatically describe the excavation for a later house. Compare the respective work volumes and depths with the report before applying results to the next construction phase.

Check evidence against the intervention

Keep plan changes and partial-area handovers traceable

Changed basements, relocated buildings and additional connections are compared with the previous investigation scope. Handover to the project owner and site management clearly identifies the plan revision, investigated areas and outstanding tasks.

Explore the technical principles
Technical assessment points

Technical checks for housing and development

Surface, depth, utilities, interference fields, access and construction phase determine which investigation is useful and reliable.

Surface

Brownfield sites, meadows, asphalt, concrete, ballast, demolition areas and construction roads have different measurement conditions.

Depth

Basements, underground car parks, chambers, retaining works, utilities, foundations and infiltration trenches must be described with target depths.

Utilities

Existing and new utilities affect safety, access and measurement data. They belong in the project documents early.

Interfering objects

Reinforcement, scrap, existing structures, fences, storage areas and construction equipment may mask measurement signals.

Construction phase

Investigation must fit site preparation, demolition, development, excavation, foundations and subsequent trades.

Documentation

The statement remains reliable only if the investigation area, method, conditions and follow-on decision are documented.

Method comparison

Which service suits housing and development

The appropriate service depends on project phase, suspicion indicators, depth, surface and construction sequence.

Historical aerial photograph analysis

It assesses suspicion indicators and former use and helps plan technical investigation areas before geotechnical work, development or excavation.

Surface survey

It is suitable for accessible areas that can be measured sufficiently. Surfacing, reinforcement and utilities may affect the statement.

Magnetometry

Magnetometry detects ferromagnetic anomalies on accessible areas. Utilities, reinforcement, foundation remains, fences and site equipment may mask the data. Interpretable areas and measurement limits are documented separately for the construction area.

TDEM

TDEM detects time-dependent electromagnetic responses from conductive objects. The target object, soil conductivity, required depth and technical installations determine suitability for the excavation or development alignment.

Ground-penetrating radar / GPR

GPR records reflections at material and structural boundaries and can provide supplementary investigation of utilities or installations. Soil, moisture, surface coupling and reinforcement affect data depth. A reflection does not uniquely identify ordnance.

Deep-ground survey

Suspicion indicators, required investigation depth and measurement conditions determine whether a suitable surface method covers the work volume sufficiently. If coverage is inadequate, additional deep investigation is planned. The investigation is assigned to the actual position and target depth of the intervention.

Downhole survey

It investigates the subsurface from survey boreholes. Its suitability and the volume that can be investigated are assessed according to the objective, depth and local measurement conditions.

Excavation supervision

For areas with limited preliminary investigation, the technical suitability of construction-phase ordnance surveying is assessed. Each working layer is technically surveyed and assessed before controlled layer-by-layer removal with supplementary visual inspection. The steps are repeated down to the agreed excavation bottom. Excavation layers, stop signals, authority to give instructions, reporting procedures and documentation are agreed with site management and safety officers before work begins.

Ordnance recovery

Measurement anomalies receive targeted follow-up investigation or exposure. Recovery of confirmed ordnance is coordinated with the permitted activities, local responsibilities and documentation. If an unexpected suspicious object is found, stopping work, keeping distance and immediate reporting take priority.

Specialist areas

Specialist areas for housing and development

Planned areas, depths and construction sections are described separately for plots, new developments, excavations and access roads.

Specialist personnel with a plan and survey trolley on a construction site in front of homes under construction.

Building plot

Assess individual plots with building envelopes, property connections, foundations and excavation.

Assess the building plot
Specialist personnel with a plan and survey trolley on a construction site in front of homes under construction.

New development

Assess construction areas, roads, utility alignments and sections before development works.

Assess a new development
Specialist personnel with a plan and survey trolley on a construction site in front of homes under construction.

Excavation

Integrate earthworks, findings, excavation sequence and site management into the process.

Supervise the excavation
Four people in orange high-visibility vests in front of two excavators on a construction site.
Person with a yellow survey cart on a footpath in front of a hedge.

Technical information

Housing and site development: brochure

From development works to excavation: the brochure shows how to consider ordnance risks early and prepare investigations suited to the planned earthworks.

1 / 8
Housing and site development: brochure – page 1

German · 8 pages

Project questions

Frequently asked questions about housing and site development

When should a housing or site-development project be assessed for ordnance?

Before the relevant ground interventions, existing ordnance assessments are checked against the planned areas and depths. Whether an investigation is required, and which one, depends on suspected contamination, existing knowledge and local conditions.

Which documents does FONTANA-EOD need for an initial assessment?

Useful documents include a site plan, land parcels, construction-area boundaries, excavation and development plans, utility plans, planned depths, construction schedules, existing expert reports, aerial-photo analyses, geotechnical data and known requirements. Information and requirements from authorities are supplied with their date, complete appendices and geographical scope.

Which project situations fall under housing and site development?

They include individual building plots, new developments, apartment buildings, neighbourhoods, excavations, underground car parks, basements and access roads. Their areas, depths and construction sections are described separately for investigation planning.

Which methods may be appropriate for housing projects?

Depending on the project situation, historical aerial-photo analysis, surface surveys, GPR, magnetometry, TDEM, deep-ground surveys, borehole surveys, excavation monitoring or ordnance recovery may be relevant. Selection depends on the surface, interfering objects, investigation depth and construction sequence.

How are excavations, basements and underground car parks taken into account?

Position and target depth are stated for excavations, retaining works, the excavation bottom and deeper chambers. The investigation must cover each intervention; the method able to do so is assessed against suspicion indicators and measurement conditions.

What should be done if a suspicious object is found during earthworks?

If an unexpected suspicious object is found, stop work in the affected area immediately. Do not touch, move or uncover the object further. Leave the immediate area and keep others away without putting yourself at risk. In Germany, notify the police immediately on 110; outside Germany, use the local emergency reporting procedure. The competent authorities determine what happens next. Inform site management and the client; internal reporting must not delay the emergency call. FONTANA-EOD supports project-specific specialist assessment, surveys, documentation and communication between parties within the commissioned scope.

What evidence is produced for the project owner and site management?

Typical evidence includes document analysis, location references, measurement records, survey or supervision reports, findings assessments, photographic records and recommendations for the next project step. The scope depends on the service and project phase.

What determines the effort and cost of an ordnance assessment?

The determining factors are area, excavation geometry, development length, intervention depths, soil, interference sources, access, construction phases, existing documents, required methods and documentation scope. Calculation requires the planned work volumes and the commissioned investigation scope.

Preparing an enquiry

Documents we need for your housing project

Send the site plan showing planned interventions and depths. Add existing assessments and information on the next construction section.

Site and area

Address, land parcels, site plan, construction-area boundaries, sections, plots, road alignments and affected sub-areas.

Ground disturbance and depth

Excavation, basement, underground car park, foundations, borehole positions, utility trenches, chambers, retaining works, infiltration trenches and planned target depths.

Available documents

Aerial-photo analysis, geotechnical data, utility plans, old documents, expert reports, requirements, schedule and existing assessments.

Documentation objective

Procurement, project file, site management, HSE, development body, developer communication or the follow-on decision for the next construction section.

Submit project details together

Send existing documents as completely as possible. Incomplete details can also be assessed if the project location, construction objective, intervention depth, phase and desired next step are identifiable.

Telephone

+49 (0) 6843 - 999 499 7

Email

info@fontana-eod.de

Project documents

Site plan, depth, construction phase, suspicion indicators

Contacts

Site management, designers, HSE or project management

Have project documents assessed
Project enquiry

Have your project assessed

Whether historical aerial photograph analysis, explosive ordnance surveying, surface surveying using GPR, magnetometry or TDEM, deep-ground surveys, downhole surveys, excavation supervision, area clearance or ordnance recovery is needed depends on the location, ground disturbance, depth, ground and existing documents. An early ordnance assessment provides clarity for tendering, programming, occupational safety and construction.

FONTANA-EOD combines its Section 7 SprengG licence, specialists holding Section 20 SprengG certificates of competence, suitable survey and clearance methods, and traceable documentation. Send the site plan, depth of ground disturbance, construction phase and existing documents for an initial technical assessment.