Project pathway
The quickest route to the right decision.
Before housing construction, excavations, property connections and site-development works are checked against existing ordnance assessments. FONTANA-EOD establishes the investigation requirements for individual areas, depths and construction sections with the project owner and designers. Send the site plan, planned interventions and depths and existing assessments so that the next investigations can be agreed.
Clarify the plot and alignments.
Coordinate the excavation and utilities.
Maintain a reliable project file.
Whether an investigation is needed depends on suspected contamination, existing knowledge and the specific ground intervention. Preparatory drilling and property connections are also considered. The decisive factors are suspicion indicators, planned depth, construction phase, surface, existing utilities, excavation sequence and the required evidence. FONTANA-EOD brings these details together to determine the technically appropriate next step for document review, surveys, excavation monitoring or documentation.
The scope of services for “Residential neighbourhood in Köln-Deutz, North Rhine-Westphalia” included ordnance surveys.
Service period: –
Service areas:Surface surveys: GPR, TDEM and magnetometry
The scope of services for “Development of a building area in Bonn, North Rhine-Westphalia” included ordnance surveys.
Service period: –
Service areas:Surface surveys: GPR, TDEM and magnetometry
The scope of services for “Development of a residential area in Bochum, North Rhine-Westphalia” included ordnance surveys.
Service period: –
Service areas:Surface surveys: GPR, TDEM and magnetometry
References from project practice
For housing construction and site development, planned earthworks and existing documents must match. Select a place for examples from our project practice.
Project information is loaded from the reference list.
Select a project location from the place selector or choose a point on the map.
The markers show official place centres. The associated references state the construction task, services performed and documented scope.
Map data: © GeoBasis-DE / BKG (2026), VG250 / GN250, dl-de/by-2-0; Luxembourg: ACT / data.public.lu, CC0. Geometries projected and simplified for display.
Select your project. The specialist pages explain the plans needed, typical interventions and comparison with areas already investigated.

Assess individual plots, building envelopes, property connections and preparatory earthworks.
Arrange assessment of a building plot
Clarify construction areas, development works, construction phases and later civil-engineering packages before implementation.
Assess the new development
Bring together excavation, foundations, utilities, external works and inner-city constraints.
Prepare an apartment-building project
Coordinate demolition, new construction areas and development works by construction section and investigated depth.
Arrange specialist assessment of a neighbourhood
Define excavation methods, document investigation limits and agree reporting procedures.
Plan excavation monitoring
Assess deep excavations, retaining works, excavation bottoms, borehole positions and underground components for the project.
Assess underground car parks and basements
Clarify road alignments, utility trenches, chambers, service networks and construction sections before civil-engineering work.
Agree development alignmentsSpecialist assessment delivers its benefit when it is integrated early into land decisions, geotechnics, development, building construction and excavation.
Early project phases usually require a reliable assessment of suspicion rather than full technical execution. Location, land parcel, planned use, approximate intervention depths and existing documents are often enough. This establishes whether detailed aerial-photo analysis, technical surveys or further coordination are needed before purchase, design, geotechnical investigation or tendering.
Borehole positions, driven core sampling, trial pits, survey starting points and geotechnical investigations target the subsurface. If ordnance suspicion exists or documents are unclear, the points, depths and access areas that need specialist preparation should be established before these interventions. This keeps geotechnics, ordnance assessment and scheduling connected.
Development-work procurement usually includes roads, sewers, water, electricity, telecommunications, lighting, property connections and chambers. For ordnance assessment, these trades should not be considered separately when they affect the same ground. Alignment-based planning helps connect surveys, excavation sequence, utility protection and later evidence.
At the transition from development works to building construction, it must be clear which areas have already been investigated and which interventions remain unresolved. Excavation, basements, underground car parks, foundations, external works and service connections may require different statements. A clear handover prevents development-work results from being applied indiscriminately to building construction.
Demolition, vegetation clearance, topsoil removal, breaking out, removal of surfacing and site preparation change access and may create new investigation conditions. Existing foundations, basement remains, rubble layers and fill affect measurability and safety. Necessary investigations and protective measures are planned before ground interventions during vegetation clearance, demolition, breaking out or creation of access and work areas. Areas accessible later are investigated separately before the relevant follow-on interventions.
Utility design in housing includes not only main routes but also property connections, chambers, handover points, infiltration trenches, drainage installations and temporary site supplies. These interventions may lie outside the later building footprint and still be relevant to ordnance assessment. The investigation must therefore record alignments, depths and construction phases individually.
Excavations need access, retaining works, slopes, dewatering, work spaces, bottoms, bearing areas and removal sequences. Ordnance assessment thus becomes a construction-sequence issue. Planning shows which areas can be investigated in advance and whether construction-phase ordnance surveying is suitable for the remaining excavation. Reporting procedures are agreed with site management and safety coordination.
Housing projects often change: underground car parks are extended, utility alignments moved, basements omitted, excavations deepened or construction sections redefined. Each change may affect the ordnance assessment statement. The project file should therefore be updated when position, depth or construction activity differs materially from the original assessment.
Ground interventions differ between an individual house, a new development and an underground car park. Building envelopes, development alignments and excavations are shown on the site plan with their respective areas and depths.
For an individual building plot, the question is not only whether suspicion exists. The building envelope, property connections, excavation, foundations, external works, utility routes and planned intervention depth are decisive. Early assessment helps prepare documents, aerial-photo analysis, surveys and possible excavation monitoring so that the project owner, designers and civil-engineering contractor have a reliable decision basis. Property connections and external works also belong on the site plan with their planned interventions.
A new development consists of multiple construction areas, road alignments, utility trenches, chambers, green spaces, drainage and construction sections. Ordnance assessment must therefore be structured spatially and over time. A result for one sub-area does not automatically replace assessment of all later phases. For new developments, suspicion indicators, infrastructure provision, site preparation and evidence are brought together.
Apartment buildings combine deep excavation, construction pits, foundations, basements, service connections and often restricted inner-city conditions. Assessment should establish which areas can be surveyed beforehand, where borehole positions or deeper interventions matter and how site management can handle restrictions. The location and depth of the excavation must be distinguished from connections and external works.
Neighbourhood developments combine demolition, existing assets, several new construction areas, infrastructure works, construction phases, underground car parks, external works and later changes of occupier. For ordnance assessment, keeping project sections distinct is particularly important. Each phase needs a clear investigation area, an appropriate method and traceable documentation. Demolition areas and new construction areas are assigned to their investigation sections.
Excavations create their own investigation and safety situation because earthworks intervene directly in the subsurface. When advance surveys are limited, it is assessed whether construction-phase ordnance surveying is suitable for the planned excavation. Merely observing excavator operations does not replace necessary surveying. Excavation sequence, reporting procedures and documentation are agreed with site management before work begins.
Underground car parks, basements, retaining-work alignments, excavation bottoms, chambers and underground components need a different depth reference from near-surface external works. Position, target depth, borehole positions, excavation shape, adjoining structures and technical access are decisive. Retaining works, excavation bottoms and deeper chambers require their own position and depth details.
Access roads are not purely a road-construction matter. They combine routes, utility trenches, sewers, chambers, service corridors, property connections and construction sections. Ordnance surveying must therefore be planned by length, alignment and construction phase. Results must show the road section investigated, its lateral boundaries and the depth reached.
For all project situations, site plans, land parcels, building limits, excavation plans, utility plans, geotechnical data, aerial-photo analyses, old documents, requirements and schedules help make the right technical follow-on decision. More complete documents allow technical methods, investigation depth, construction sequence and documentation scope to be coordinated better.
Housing and development may involve historical aerial-photo analysis, surface surveys, GPR, magnetometry, TDEM, deep-ground surveys, borehole surveys, excavation monitoring or ordnance recovery. The method is selected according to the specific construction activity. Surface, interfering objects, surfacing, utilities, depth, access, time windows and evidence requirements are decisive.
Housing projects frequently pass between development, design, infrastructure works, building construction, civil engineering, external works and sale or letting. Documentation must therefore be technically correct and readable by different parties. Investigation area, method, conditions, result, restrictions and follow-on decision should be presented so they can be reused in the project file, site management and procurement.
Ordnance assessment that begins shortly before excavation often faces time and coordination pressure. Assessment before a property decision, tendering, geotechnical investigation, utility design or civil-engineering procurement is more useful. Survey windows, borehole positions, excavation areas, development alignments and evidence can then be integrated before subsequent trades and construction schedules are fixed.
FONTANA-EOD does not need a completely finalised design for an initial specialist assessment. The project location, area, construction objective, planned interventions, depths, construction phase, documents available and desired next step must be identifiable. This allows it to be established whether document review, technical surveying, excavation supervision or a combination is appropriate first.
The report and site plan must show which works were investigated and which areas remain unresolved. This applies to property connections as well as an entire excavation.
Construction-area boundaries show the area actually affected by the planned works. They should not be confused with property boundaries because utilities, construction roads, storage areas, retaining works and external works may lie outside the building footprint. Documentation records which intervention was investigated or supervised.
Depths must be considered separately for each construction activity. Basements, underground car parks, chambers, sewers, property connections, infiltration trenches, piles, borehole positions and foundations may have different target depths. Without these details, the specialist conclusion can be applied to the later construction sequence only to a limited extent.
Utility plans help integrate existing and planned service corridors into ordnance assessment. They affect access, occupational safety, measurability and excavation sequence. In development projects, utilities often provide the decisive reference because they create long routes with many depth changes.
Historical aerial-photo analysis and suspected-area analysis can provide the initial specialist basis when use history or wartime effects are not sufficiently established. They do not automatically replace technical surveying but help prepare investigation areas, priorities and follow-on decisions on a firmer basis.
Measurement data, borehole records, supervision reports and photographic records must be connected to the site plan, construction section and execution status. Only then can results be traced later and used meaningfully by site management, clients, project management or the competent parties.
Findings, anomalies and limited statements require specialist assessment within the project context. Measurement conditions, position, depth, construction activity and possible follow-up measures are considered together. This assessment is essential so that project parties know which next steps are technically appropriate.
After investigation, information often passes to civil-engineering, building, external-works and surveying teams, utility operators or site management. The handover should clearly document the areas dealt with and the questions remaining. This prevents mistaken assumptions later in construction.
In multi-phase housing and development projects, the project file grows with the work. New construction sections, changed depths, additional utilities, variations and findings should be added traceably. Ordnance assessment thus becomes part of ongoing project management rather than a single document.
Documents and interventions are compared at the outset. The agreed investigation, assessment and handover of results then follow.
Site, construction objective, land parcel, construction area, phase, depths and contacts are collected.
Site plans, aerial-photo analysis, geotechnical data, utility plans, old documents and existing requirements are assessed.
Building plots, excavations, underground car parks, utility trenches, roads, chambers and external works are defined by intervention and depth.
Historical analysis, surface surveys, deep-ground surveys, borehole surveys or excavation monitoring are selected for the project.
Access, schedules, exclusion areas, occupational safety, utility protection and communication with site management are coordinated.
The commissioned service is carried out in the defined area and documented with location references.
Results, interference fields, statement limits and follow-on decisions are brought together through specialist assessment.
The evidence is incorporated into procurement, site management, excavation, development works or further coordination.
Property boundaries, excavations and development alignments are recorded on the site plan with their intervention depths. Existing assessments are compared with these work volumes.
Individual plots focus on building envelopes, property connections, excavations and preparatory earthworks.
Arrange assessment of a building plotMultiple construction areas, roads, utility alignments, drainage and construction sections are planned together.
Assess a new developmentRecord excavation, foundations and connections with their intervention depths; consider access and neighbouring buildings.
Prepare an apartment-building projectAssign results for demolition, buildings, public spaces and utilities to the relevant areas and construction phases.
Arrange specialist assessment of a neighbourhoodWhen advance investigations are limited, the suitability of construction-phase ordnance surveying for the remaining excavation areas is assessed. Technical investigation and assessment of each working layer precede controlled removal. An imminent excavation date alone does not justify selecting the method.
Arrange supervision of the excavationDeep excavations, retaining works, excavation bottoms, foundations and underground components need precise depth references.
Clarify underground car parks and basementsRoad alignments, utility trenches, chambers and service networks are prepared by length.
Coordinate the access roadSurfaces, utilities and metal installations may restrict investigation. These conditions are recorded before method selection and documented later with the results.
Metal fences, reinforcement, scrap, old foundations, fill, utilities, chambers and site equipment may affect measurement data. These factors should be considered before method selection, not appear only in the report. This establishes whether an area can be surveyed near the surface, whether borehole surveying is needed or whether excavation should receive specialist supervision.
Asphalt, concrete, paving, aggregate base layers and trafficked site areas change measurement conditions. In housing projects this often concerns former yards, existing access roads, streets, parking areas and demolition areas. The specialist assessment should state whether the surface permits informative measurement or a different approach is needed for the planned activity.
Apartment buildings, infill development and neighbourhood projects often have restricted access, neighbouring buildings, retaining works, traffic management and excavation logistics. Ordnance assessment must incorporate these conditions so that exclusion zones, measurement areas, borehole positions, excavation sequence and reporting procedures match the actual site situation.
Development works, geotechnics, ordnance assessment, demolition, civil engineering, building construction and external works are linked in time. Planning assessment too late or without reference to the construction phase creates avoidable gaps. Early specialist assessment shows which areas should be dealt with in advance, during excavation or before subsequent trades.
Housing-project documents are often passed to buyers, co-ownership associations, investors, project managers or later operators. Documentation should therefore show clearly which area, intervention and construction section were assessed. This prevents misunderstandings when information is later used outside the original site-management team.
A reliable ordnance assessment describes limits as well as results. Inaccessible sub-areas, technical interference, changed design, new intervention depths and uninvestigated ancillary areas must remain identifiable. This transparency matters in housing because projects often develop in stages and later decisions rely on existing documents.
Mark planned work on the site plan and state its depths. Add existing assessments and the next planned date.
For initial assessment, supply the project location with address, land parcels, site plan and marked sub-areas. It is particularly helpful to show which areas relate to buildings, excavation, utilities, development works, external works or later construction sections.
Describe the type and depth of planned interventions: excavation, basement, underground car park, chamber, utility trench, foundation, borehole, retaining works, infiltration trench or roadworks. This allows the appropriate investigation area to be defined much more precisely.
Supply existing aerial-photo analyses, geotechnical data, utility plans, old documents, demolition records, authority requirements and earlier expert reports as completely as possible. Incomplete documents also help if their status and relevance are clear.
The enquiry should state whether an initial suspicion assessment, method recommendation, survey, excavation monitoring or evidence preparation is needed. FONTANA-EOD can then align its response directly with the project decision. Contacts, schedules, procurement status, planned civil-engineering packages and known restrictions also help the initial assessment fit the technical and organisational project sequence. It also matters whether work is procured in sections, later construction areas remain inaccessible and documents will be reused by buyers, developers, site management or subcontractors.
Before handover to the next contractor, existing results are compared with that contractor’s planned work. Unresolved work volumes and additional investigation tasks are marked on the site plan.
Larger housing and development projects should describe sections separately even on the same property. Assessment of the first excavation, utility alignment or access road does not automatically replace later external works, extensions or additional chambers. Separation protects the quality of conclusions and makes variations easier.
The ordnance measures required for a project depend on existing knowledge, planned ground interventions and local measurement conditions. We agree the technical task with the designers and define the investigations, supervision and evidence needed.
Housing and development projects have different starting points. The first specialist decision depends on whether the plot, neighbourhood, excavation, underground car park or development alignment is the main issue.
While a building plot is still under consideration, suspicion indicators, existing documents and possible investigation areas are assessed early.
Arrange assessment of a building plotFor new developments and neighbourhoods, construction areas, roads, utility alignments, drainage and phases must be considered together.
Assess a new developmentDeep interventions for basements, underground car parks, retaining works, excavation bottoms and chambers need different depth and evidence references from near-surface work.
Assess underground car parks and basementsWhere advance assessment is limited, the suitability of construction-phase ordnance surveying is established. An imminent start date alone does not determine the method.
Plan excavation monitoringFor roads, property connections, sewers and chambers, affected sections are described by width and depth.
Agree development alignmentsService limits, methods, investigation areas and evidence should be defined before procurement and the construction schedule.
Prepare evidenceThe construction objective, existing knowledge and planned interventions are compared before method selection.
A detached house, apartment building, new development, neighbourhood development and access road create different interventions and evidence requirements.
Excavations, basements, underground car parks, utility trenches, chambers, retaining works, piles, infiltration trenches and development alignments are considered separately by depth and position.
Agree intervention depthsAerial-photo analyses, old documents, preliminary decisions, geotechnical data, utility plans and known requirements help define the investigation area.
Arrange a suspicion assessmentSurface surveys, deep-ground surveys, borehole surveys, excavation monitoring or combinations are selected according to surface, interference fields, depth and construction phase.
Understand the serviceAssessment, excavation, development, foundations and subsequent trades must be coordinated in time and organisation.
Documentation describes the area assessed, method, conditions, assessment and follow-on decision for the client, designers and site management.
Clarify documentationHousing projects need documents that remain understandable through changing construction sections, subcontractors and approval or procurement interfaces.
Address, land parcel, building limit, building envelope, development alignment, excavation and sub-areas are described unambiguously.
The planned depth is stated separately for excavation, basements, underground car parks, utilities, chambers, foundations and external works.
The report must show which areas were investigated or supervised using which method and under which conditions.
Anomalies, suspicion indicators, interference fields and statement limits are assessed by specialists and linked to the next step.
Site management and contractors need clear handovers so that assessed areas, unresolved questions and reporting procedures are known during construction.
The project file brings together documents for clients, designers, contractors and other parties. Its reliability increases with the precision of the match between investigation area and construction activity. After actual exposure or clearance work, the corresponding findings and clearance records are included.
Prepare documentationFor technical investigation, area-wide, linear and point ground interventions are recorded separately. A shared plan revision connects plots, buildings and development sections with their respective depths.
Before earthworks, existing ordnance assessments are checked for coverage of the planned areas and depths.
The building footprint alone does not describe the whole ground volume involved in construction. Excavation width, slopes or retaining works, working space and any foundation elements supplement the building geometry. For basements and underground car parks, position and depth references must match the current excavation plan.
Access roads, utility trenches and chambers are stated with alignment, width and depth. Property connections and additional excavations may differ from the standard section. Preparatory borehole positions and temporary interventions are also included where they belong to the intended construction sequence.
The investigation report and execution design use traceable area, section and point identifiers. After a plan change, it is checked which results still fit and which volumes need additional consideration. Completed and unresolved areas remain distinct at handover.
Land parcel, building limit and work area are connected on the site plan. Neighbouring properties or later sections are not included without spatial evidence.
Excavation depth, lateral working space, retaining works and foundation elements describe the ground volume needed. Investigation is checked against these dimensions and the installation method.
Alignment, trench width, bottom and larger chamber areas are stated separately. Additional connections or crossings receive their own identifiers when their geometry differs.
Position, target depth and drilling method are described before preliminary ground investigations. Existing results are checked for coverage of this exact intervention.
Utilities, old foundations, surfacing and vegetation may restrict access and measurement conditions. The sequence states when affected areas will become accessible.
Changed buildings, depths or connections are compared with the documented status. The documents identify which areas remain usable and where further tasks exist.

Plots, buildings, development alignments and planned depths are compared with existing ordnance records. Preparatory boreholes and property connections are also part of the intended intervention. Comparison shows which results fit and which work volumes require further investigation.
Compare existing results with the construction project
An accessible open area, deep basement excavation and narrow utility route may need different investigations. Ground structure, technical installations and construction conditions affect the conclusions achievable. Areas not sufficiently investigated are recorded with position, depth and the next step needed.
Select methods according to ground volume and accessFONTANA-EOD coordinates investigated areas with planned work and documents which statement applies to each construction section.
FONTANA-EOD records planned interventions for excavations, foundations, underground car parks, utility trenches and external works separately. For method selection, their positions and depths are checked against suspicion indicators, existing knowledge and measurement conditions.
Agree the working approachInvestigation is tied to construction areas, alignments, depths and phases so that statements remain useful during construction.
Surfacing, utilities, reinforcement, interfering objects and access are considered as technical conditions.
Handovers, reporting procedures, work areas and documents are prepared so that the site can use them.
Reports and plans should remain traceable for clients, designers, contractors and competent parties.
Housing and development involve clients, designers, contractors, civil engineers, utilities, site management and competent authorities.
Those responsible provide the project objective, area, construction section, documents and required evidence. They decide which services to commission and which parties to involve in the project.
Designers and project managers translate the construction objective, intervention depth, schedule and procurement requirements into assessable tasks. They need reliable information to integrate ordnance assessment into the bill of quantities, schedule and project file.
Construction teams need clear work areas, documented investigation steps, agreed reporting procedures and safe handovers between surveying, excavation and subsequent trades.
FONTANA-EOD assesses suspicion indicators, methods, investigation depth, construction sequence and evidence for the project. The service remains limited to the commissioned technical investigation, supervision and documentation.
In Germany, the ordnance disposal services of the federal states and the locally competent authorities carry out hazard-response and find-management duties. Their involvement is established for the project location; outside Germany, local responsibilities apply. Private specialist services support project preparation and communication between the parties within the commissioned scope.
The local public-order authority and, where relevant, the building-control authority are involved in their project-specific roles. Requirements, contacts and reporting procedures are assigned to the affected plots, development alignments and construction sections.
HSE teams, health-and-safety coordinators or safety officers consider investigation areas, exclusion zones, findings procedures and site organisation. Specialist documentation helps incorporate these matters into construction.
Ordnance assessment in construction projects is shaped by responsibilities, occupational safety, specialist knowledge, documentation and interfaces with authorities. The specific assessment depends on the project location, activity and requirements of the parties involved.
Investigation scope and evidence are defined for each work volume. Requirements for qualifications, occupational safety and reporting procedures are established according to project location and commissioned activity. The Baufachliche Richtlinien Kampfmittelräumung contain requirements for historical and technical investigation, clearance planning, procurement and documentation within their defined remit for the German federal government. Their application to the specific housing or development project is established separately.
In Germany, § 7 SprengG concerns the commercial authorisation for activities requiring authorisation; § 20 SprengG concerns the certificate of competence of responsible persons. Under § 1b SprengG, searching for found munitions also counts as handling them. The requirements applicable to the project depend on the activity actually commissioned and the allocation of responsibilities.
The First Ordinance to the Explosives Act (1. SprengV) includes requirements for specialist knowledge and state-recognised training courses. In housing and development projects, the required qualification is assigned to the specific investigation or clearance commission and its work areas.
DGUV Information 201-027 concerns protective measures during ordnance clearance work. DGUV Rule 113-003 concerns the dismantling or destruction of explosives or corresponding objects and also includes the disposal of found munitions. It applies according to this field of activity; it does not replace a risk assessment specific to the planned ground intervention.
Work on ordnance and technical ordnance services raise questions of authorisation, competence and responsibility. These are not treated as formalities but incorporated into services, personnel, sequence and documentation.
Risk assessment, site organisation, access areas, reporting procedures and protective measures must match actual execution. Ordnance assessment is therefore part of construction planning, not merely an individual measurement operation.
Reporting, find-management and hazard-response procedures remain with the competent authorities. Clients need to prepare documents, findings and communication so that project interfaces can be handled traceably.
A report describes the investigated scope, methods used, conditions and assessments. It does not replace investigations not carried out and should always be read against the specific construction activity.
Procurement, site management and operator communication need traceable documents clearly showing the area, method, result and follow-on decision.
Agree evidence requirementsIf an unexpected suspicious object is found, stop work in the affected area immediately. Do not touch, move or uncover the object further. Leave the immediate area and keep others away without putting yourself at risk. In Germany, notify the police immediately on 110; outside Germany, use the local emergency reporting procedure. The competent authorities determine what happens next. Inform site management and the client; internal reporting must not delay the emergency call.
Prepare project communicationThe technical service required depends on suspected contamination, surface, depth, interference environment and construction phase. These details should be brought together before commissioning.
Clarify the service scopeThe address, land parcels and site plan help assign existing documents and local contacts.

The enquiry needs the address, land parcels, construction-area boundaries and responsible parties. The region affects interfaces, available documents and coordination procedures.
Check the project region
Competent authorities, applications and reporting procedures depend on the project location. Existing official information is considered in planning.
Prepare regional assessment
In addition to the place, identify the excavation, property connection or development section and planned depth. Only then can investigation requirements for upcoming work be assessed.
Arrange specialist assessment of the construction projectInvestigation for a road or sewer does not automatically describe the excavation for a later house. Compare the respective work volumes and depths with the report before applying results to the next construction phase.
Check evidence against the interventionChanged basements, relocated buildings and additional connections are compared with the previous investigation scope. Handover to the project owner and site management clearly identifies the plan revision, investigated areas and outstanding tasks.
Explore the technical principlesSurface, depth, utilities, interference fields, access and construction phase determine which investigation is useful and reliable.
Brownfield sites, meadows, asphalt, concrete, ballast, demolition areas and construction roads have different measurement conditions.
Basements, underground car parks, chambers, retaining works, utilities, foundations and infiltration trenches must be described with target depths.
Existing and new utilities affect safety, access and measurement data. They belong in the project documents early.
Reinforcement, scrap, existing structures, fences, storage areas and construction equipment may mask measurement signals.
Investigation must fit site preparation, demolition, development, excavation, foundations and subsequent trades.
The statement remains reliable only if the investigation area, method, conditions and follow-on decision are documented.
The appropriate service depends on project phase, suspicion indicators, depth, surface and construction sequence.
It assesses suspicion indicators and former use and helps plan technical investigation areas before geotechnical work, development or excavation.
It is suitable for accessible areas that can be measured sufficiently. Surfacing, reinforcement and utilities may affect the statement.
Magnetometry detects ferromagnetic anomalies on accessible areas. Utilities, reinforcement, foundation remains, fences and site equipment may mask the data. Interpretable areas and measurement limits are documented separately for the construction area.
TDEM detects time-dependent electromagnetic responses from conductive objects. The target object, soil conductivity, required depth and technical installations determine suitability for the excavation or development alignment.
GPR records reflections at material and structural boundaries and can provide supplementary investigation of utilities or installations. Soil, moisture, surface coupling and reinforcement affect data depth. A reflection does not uniquely identify ordnance.
Suspicion indicators, required investigation depth and measurement conditions determine whether a suitable surface method covers the work volume sufficiently. If coverage is inadequate, additional deep investigation is planned. The investigation is assigned to the actual position and target depth of the intervention.
It investigates the subsurface from survey boreholes. Its suitability and the volume that can be investigated are assessed according to the objective, depth and local measurement conditions.
For areas with limited preliminary investigation, the technical suitability of construction-phase ordnance surveying is assessed. Each working layer is technically surveyed and assessed before controlled layer-by-layer removal with supplementary visual inspection. The steps are repeated down to the agreed excavation bottom. Excavation layers, stop signals, authority to give instructions, reporting procedures and documentation are agreed with site management and safety officers before work begins.
Measurement anomalies receive targeted follow-up investigation or exposure. Recovery of confirmed ordnance is coordinated with the permitted activities, local responsibilities and documentation. If an unexpected suspicious object is found, stopping work, keeping distance and immediate reporting take priority.
Planned areas, depths and construction sections are described separately for plots, new developments, excavations and access roads.

Assess individual plots with building envelopes, property connections, foundations and excavation.
Assess the building plot
Assess construction areas, roads, utility alignments and sections before development works.
Assess a new development
Integrate earthworks, findings, excavation sequence and site management into the process.
Supervise the excavation
Prepare road alignments, utility trenches, chambers and service networks by length.
Coordinate development works

Before drilling, excavation and development works, suitable investigations and the evidence needed for each work volume are defined.

Assess individual plots, building envelopes, property connections and preparatory earthworks.
Arrange assessment of a building plot
Clarify construction areas, development works, construction phases and later civil-engineering packages before implementation.
Assess the new development
Bring together excavation, foundations, utilities, external works and inner-city constraints.
Prepare an apartment-building project
Coordinate demolition, new construction areas and development works by construction section and investigated depth.
Arrange specialist assessment of a neighbourhood
Define excavation methods, document investigation limits and agree reporting procedures.
Plan excavation monitoring
Assess deep excavations, retaining works, excavation bottoms, borehole positions and underground components for the project.
Assess underground car parks and basements
Clarify road alignments, utility trenches, chambers, service networks and construction sections before civil-engineering work.
Agree development alignments
Service overview for suspicion assessment, surveys, excavation monitoring, recovery and documentation.
Understand the service
Prepare the sequence, project file and documentation for the client, designers and site management.
Prepare evidenceTechnical information
From development works to excavation: the brochure shows how to consider ordnance risks early and prepare investigations suited to the planned earthworks.

Before the relevant ground interventions, existing ordnance assessments are checked against the planned areas and depths. Whether an investigation is required, and which one, depends on suspected contamination, existing knowledge and local conditions.
Useful documents include a site plan, land parcels, construction-area boundaries, excavation and development plans, utility plans, planned depths, construction schedules, existing expert reports, aerial-photo analyses, geotechnical data and known requirements. Information and requirements from authorities are supplied with their date, complete appendices and geographical scope.
They include individual building plots, new developments, apartment buildings, neighbourhoods, excavations, underground car parks, basements and access roads. Their areas, depths and construction sections are described separately for investigation planning.
Depending on the project situation, historical aerial-photo analysis, surface surveys, GPR, magnetometry, TDEM, deep-ground surveys, borehole surveys, excavation monitoring or ordnance recovery may be relevant. Selection depends on the surface, interfering objects, investigation depth and construction sequence.
Position and target depth are stated for excavations, retaining works, the excavation bottom and deeper chambers. The investigation must cover each intervention; the method able to do so is assessed against suspicion indicators and measurement conditions.
If an unexpected suspicious object is found, stop work in the affected area immediately. Do not touch, move or uncover the object further. Leave the immediate area and keep others away without putting yourself at risk. In Germany, notify the police immediately on 110; outside Germany, use the local emergency reporting procedure. The competent authorities determine what happens next. Inform site management and the client; internal reporting must not delay the emergency call. FONTANA-EOD supports project-specific specialist assessment, surveys, documentation and communication between parties within the commissioned scope.
Typical evidence includes document analysis, location references, measurement records, survey or supervision reports, findings assessments, photographic records and recommendations for the next project step. The scope depends on the service and project phase.
The determining factors are area, excavation geometry, development length, intervention depths, soil, interference sources, access, construction phases, existing documents, required methods and documentation scope. Calculation requires the planned work volumes and the commissioned investigation scope.
Send the site plan showing planned interventions and depths. Add existing assessments and information on the next construction section.
Address, land parcels, site plan, construction-area boundaries, sections, plots, road alignments and affected sub-areas.
Excavation, basement, underground car park, foundations, borehole positions, utility trenches, chambers, retaining works, infiltration trenches and planned target depths.
Aerial-photo analysis, geotechnical data, utility plans, old documents, expert reports, requirements, schedule and existing assessments.
Procurement, project file, site management, HSE, development body, developer communication or the follow-on decision for the next construction section.
Send existing documents as completely as possible. Incomplete details can also be assessed if the project location, construction objective, intervention depth, phase and desired next step are identifiable.
+49 (0) 6843 - 999 499 7
info@fontana-eod.de
Site plan, depth, construction phase, suspicion indicators
Site management, designers, HSE or project management
Whether historical aerial photograph analysis, explosive ordnance surveying, surface surveying using GPR, magnetometry or TDEM, deep-ground surveys, downhole surveys, excavation supervision, area clearance or ordnance recovery is needed depends on the location, ground disturbance, depth, ground and existing documents. An early ordnance assessment provides clarity for tendering, programming, occupational safety and construction.
FONTANA-EOD combines its Section 7 SprengG licence, specialists holding Section 20 SprengG certificates of competence, suitable survey and clearance methods, and traceable documentation. Send the site plan, depth of ground disturbance, construction phase and existing documents for an initial technical assessment.