Specialist personnel with a plan and survey trolley on a construction site in front of homes under construction.

Ordnance assessment for building plots

Before house construction or geotechnical drilling begins, we establish whether existing ordnance assessments cover the planned work. FONTANA-EOD reviews the site plan, excavation depths and available reports with the client and design team. Service connections, access routes and adjoining work areas are assessed according to the ground disturbance involved. Send these documents together with details of the next construction phase so that the necessary investigations can be agreed.

Before purchase

Assess the evidence of suspected ordnance.

Before planning

Define the depth of work and construction area.

Before earthworks

Agree the survey work and required records.

At a glance

Establish what investigation the building plot needs

Whether an investigation is needed depends on the evidence of suspected ordnance, existing findings and the planned ground disturbance. Where past land use is unclear, the relevant records are reviewed. Plot size alone does not determine the approach: the evidence, planned depth, ground conditions, existing services, access and the records needed for design, procurement or site management all matter. FONTANA-EOD uses these details to establish which documents are missing and which investigation is suitable for the work.

The wider housing development

Which adjoining areas may need to be assessed

A building plot may form part of a new development or adjoin infrastructure areas that have already been investigated. These specialist pages explain how to prepare related construction work.

Specialist personnel with a plan and survey trolley on a construction site in front of homes under construction.
Housing construction

Ordnance assessment for housing projects

Whether the project involves a new development, excavation, underground car park or access road, the ordnance assessment must address the planned earthworks.

Housing and infrastructure development
Specialist personnel with a plan and survey trolley on a construction site in front of homes under construction.
Housing construction

New development with multiple plots

Where individual plots become a connected construction area with roads, services and several construction phases.

Have a new development assessed
Specialist personnel with a plan and survey trolley on a construction site in front of homes under construction.
Housing construction

An apartment building on a confined site

Dense development, deep excavations, basements, lift pits and neighbouring buildings make early planning of the ground works essential.

Prepare an apartment-building project
Specialist personnel with a plan and survey trolley on a construction site in front of homes under construction.
Housing construction

Excavation for housing construction

Where the evidence requires it, excavation, slopes, retaining works and deeper sections are considered in the construction sequence.

Plan excavation monitoring
Specialist personnel with a plan and survey trolley on a construction site in front of homes under construction.
Housing construction

Underground car parks and basements

Deeper excavations, ramps, vehicle access passages and foundations need a different investigation depth from shallow garden works.

Assess an underground car park
Specialist personnel with a plan and survey trolley on a construction site in front of homes under construction.
Housing construction

Infrastructure roads and service connections

Road construction, service trenches and utility corridors link the plot assessment to infrastructure planning.

Have infrastructure works assessed
Technical principles

Key terms in building plot assessment

For a building plot, the building, excavation, service connections, access route and other work areas are described with their respective depths of ground disturbance.

Suspected hazard

Evidence of suspected ordnance comes from historical sources, traces of past land use, existing reports, regional experience and the planned work. For housing projects, it matters whether that evidence concerns the whole site, particular areas or specific depths.

Intervention depth

Depth is more than a single figure on a section drawing. The excavation formation level, service trench base, borehole, shaft, infiltration trench and deeper foundation sections may call for different investigation approaches on the same site.

Extent of the construction area

The relevant area often extends beyond the future building footprint. Working space, access routes, retaining wall alignments, utility trenches, temporary roads and landscaping may each involve ground disturbance.

Method limitations

Survey methods respond differently to ground conditions, moisture, interfering objects, metal content, the surface and the target object. Investigation records are reliable only when these limitations are understood for the project.

Ground investigation and ordnance assessment

Geotechnical investigation and ordnance assessment should be coordinated in both location and timing. Borehole locations, starting elevations and planned depths help determine the appropriate technical approach.

Excavation and site supervision

Where prior investigation is limited, the suitability of ordnance surveying during excavation is assessed. Each working layer is surveyed and evaluated before controlled removal in stages, supported by visual checks. This sequence is repeated down to the agreed formation level. Before work starts, site management, machine operators and specialist personnel agree the excavation layers, stop signal, authority to give instructions, reporting arrangements and documentation.

Findings assessment

Survey anomalies are assigned for follow-up investigation using their location, survey conditions and technical evaluation. If an unexpected suspicious object is found, work must stop, people must keep their distance and the find must be reported immediately.

Project file

The project records should show what was investigated, which methods were used, where the limitations lie and what site management, the client and following contractors need to do next.

Procurement

Tendering and subcontractor coordination need clear service boundaries, investigation depths, responsibilities, working windows and documentation requirements.

Communication

The design team, site management and civil engineering contractor receive the same current plan showing the investigated areas and depths, survey limitations and any further investigation required. The relevant authorities receive the information they need for their duties.

Decisions before ground works

When a project requires an ordnance assessment

Technical assessment begins as soon as ground works are defined. Bringing the location, depth, construction phase and available documents together early makes it easier to include the investigation in design and procurement.

Land purchase or project start

Before a purchase, reservation or project acquisition, a technical assessment can help bring together the evidence of suspected ordnance, the intended development and the planned depth of work.

Have the site documents reviewed

Planning application and preliminary design

Once the floor plan, levels, basement, access route and service connections are defined, the area needing ordnance assessment can be specified more precisely.

Prepare investigation records for design

Geotechnical report and borehole locations

Ground investigation, window sampling or exploratory drilling may require prior assessment of the borehole locations and planned depths.

Agree borehole locations and depths

Basement, ground slab and foundations

Deep work beneath the building, foundation beams, lift pits and strip foundations affect the survey method and documentation.

Assess the foundation depth

Procurement and site management

Tendering, construction scheduling and site mobilisation need clear information on the investigation area, method, depth and responsibilities.

Prepare documents for procurement
Phases of a housing project

Assess the building plot from initial plans through to construction

Ordnance assessment is not a single appointment. It affects land acquisition, design, ground investigation, procurement, excavation, documentation and subsequent handovers. Defining the project phase clearly helps specify the specialist work accurately.

01

Early project concept

At an early stage, only the plot, outline concept and intended use may be known. An initial technical assessment can still be useful where excavation, foundation work or infrastructure works are foreseeable. This helps prevent ordnance issues emerging only after ground investigation dates, purchase decisions or procurement arrangements have been fixed.

02

Land acquisition and due diligence

When land is purchased, a project is taken over or a housing site is developed, the available records, previous use, existing reports and planned ground works all matter. An ordnance assessment can identify unresolved questions early and help include subsequent investigation work in the project budget and programme.

03

Ground conditions and surveying

Geotechnical reports, surveys, terrain models, design levels and proposed borehole locations provide important technical information. Bringing these details together with the evidence of suspected ordnance and the depth of work helps determine whether surveying or specialist supervision is needed before drilling or excavation.

04

Design and approval planning

At this stage, the building footprint, infrastructure, basements, underground car parks, road alignments and utility trenches become more clearly defined. The ordnance assessment should address these actual ground works, construction phases and the records needed by the design team and site management.

05

Tendering and specifications

Before procurement, the service boundaries, investigation depths, areas, documentation and interfaces must be described so that the client, bidders and site management understand the same requirements. Unclear wording often leads to variations, programme difficulties or uncertainty over responsibilities during construction.

06

Site establishment

Access routes, storage areas, crane positions, temporary roads and working spaces may each involve ground disturbance. Leaving them out of the investigation area creates gaps between the assessed area and the parts of the site actually used. Necessary investigations and protective measures are planned before the ground works needed to establish these areas, and before intrusive vegetation clearance, demolition or breaking up surfaces.

07

Earthworks and civil engineering

Excavation, drainage works, utility trenches, formation levels and foundations are critical interfaces with ordnance assessment. Investigated sections, ongoing work, reporting arrangements and documentation must be coordinated so that the project can respond consistently to unexpected findings.

08

Communication of findings

If a suspected object or ordnance find is encountered, an orderly flow of information matters alongside the technical evaluation. Its location, depth and surroundings, the trades affected, contact persons and relevant authorities must be established without speculation.

09

Construction phases and remaining areas

Housing developments are often serviced or built in phases. The records must therefore show which areas have already been assessed to which depths and which remaining areas need to be reviewed for later phases.

10

Subcontractors and subsequent trades

Civil engineering, retaining works, structural construction, utility installation and landscaping need clear investigation records. The documentation should support both the initial decision and subsequent trades by identifying the assessed areas and unresolved follow-up questions.

11

Handover to buyers or operators

For building plots, new developments and apartment buildings, information may later be passed to buyers, operators, property managers or subsequent designers. The investigated areas, depths and service boundaries must be documented clearly for this purpose.

12

Follow-up decision

After the assessment, it must be clear whether further records, an ordnance survey, checks during construction, follow-up investigation of findings or simply documented continuation of the project are appropriate. That next decision is the practical value of the technical assessment.

Starting conditions, investigation and documentation

From suspected ordnance to a documented project decision

A reliable ordnance assessment brings together existing records, available survey methods, the construction sequence and documentation. The result is a traceable basis for the next project decision, rather than an isolated finding.

01

Unclear previous use

Previous buildings, made ground, changes to the terrain and missing records increase the need to review the site's history. They do not determine the outcome automatically, but call for a structured assessment.

Assess the site's previous use
02

Small plot with a deep excavation

Even a small site can present complex ordnance investigation requirements where basements, lift pits, infiltration trenches or foundations extend deep into the ground.

Set the investigation depth
03

Interfering objects and existing services

Fences, reinforcement, old services, ballast, demolition rubble and foundations affect survey conditions and the choice of method on a confined plot.

Agree the appropriate service
04

Excavation under time pressure

Where excavation is due to start soon, the investigation status, working spaces still to be assessed, contact persons and reporting arrangements are reviewed with site management. The suitability of ordnance surveying during excavation depends on the survey conditions and planned excavation method; time pressure alone does not determine the approach.

Include investigation areas and reporting arrangements in the construction sequence
05

Survey finding or suspected object

Survey anomalies are evaluated and assigned for targeted follow-up investigation. Do not touch, move or continue uncovering an unexpected suspicious object. Stop work in the affected area, leave the immediate vicinity and keep others away without putting yourself at risk. In Germany, notify the police immediately on 110; elsewhere, use the local emergency reporting route. The relevant authorities decide what happens next. Internal reporting must not delay the emergency call.

Agree how findings will be handled
06

Investigation records for the project file

The location, method, investigation area, presentation of results and recommended action must remain clear to site management, the client and subsequent trades.

Prepare the project file
Selecting a method

Which assessment suits the housing site?

The appropriate ordnance assessment depends on the available records, surface conditions, interference, depth of work and construction sequence. For housing projects, the method must suit both the programme and the required documentation, as well as being technically feasible.

Two monitors displaying aerial photographs and maps; further aerial photograph printouts lie on the desk.

Historical assessment

Aerial photographs, historical plans and land-use records help define areas of suspected ordnance. They do not replace a physical investigation, but provide an important basis for selecting the method, depth and documentation.

Assess historical documents
Illustration of a person beside a GPR instrument, with schematic waves in a ground section

Near-surface surveying

Ground-penetrating radar, magnetometry or TDEM may provide suitable information, depending on the surface, interfering objects and survey targets. Their suitability depends strongly on the ground conditions and surrounding interference.

Request a technical assessment of the surface survey
Person beside a survey instrument on a construction site; a wheeled excavator with drilling equipment stands behind them.

Investigation at depth and borehole locations

For deep excavations, boreholes, shafts or foundations, we assess whether a suitable surface method can adequately investigate the intended working space. Where coverage is insufficient, additional investigation at depth is planned. The location, planned depth and starting point must be described precisely.

Agree borehole locations and depths
Person with a tablet at the edge of a cordoned-off excavation, with an excavator behind.

Excavation supervision

Where prior investigation is limited, the suitability of ordnance surveying during excavation is assessed. Each working layer is surveyed and evaluated before controlled removal in stages, supported by visual checks. This sequence is repeated down to the agreed formation level. Before work starts, site management, machine operators and specialist personnel agree the excavation layers, stop signal, authority to give instructions, reporting arrangements and documentation.

Plan excavation monitoring
Coordination within a housing project

Who should be involved early in assessing the building plot?

Before work begins, design information, ground investigation data, civil engineering works, utilities and investigation records are assigned to the same construction phase and plan revision.

Planning and construction management

The design team and site management need to work from the same site information. The site plan, construction limits, sections, depths, construction phases and existing records are brought together so that decisions are documented, rather than agreed only verbally during a site meeting.

Civil engineering and retaining works

Civil engineering contractors and retaining works designers need clear details of working space, borehole locations, excavation sequence, exclusion areas and possible interruptions. This information should be available before work starts so that it can be included in the programme.

Utility coordination

Utility routes often extend beyond the building footprint and are installed under separate contracts. The ordnance assessment must therefore consider service connections, public utility routes, shafts and crossings alongside the housing site.

Ground conditions and surveying

Surveying and ground investigation provide coordinates, starting elevations and sections. These data are particularly useful for documenting investigation points, boreholes and excavation depths unambiguously.

Communication with clients and buyers

Housing projects often need investigation records later for project files, handovers or communication with buyers. Statements about the investigated areas, depths and service boundaries must therefore be clear from the outset.

Scheduling

Ordnance assessment should not be scheduled as a last-minute addition just before excavation starts. A better approach is to include time for reviewing records, surveying, any necessary supervision and documentation in the construction programme.

Individual sections and remaining areas

A project may contain both investigated areas and areas that have not yet been assessed. The documentation must make that distinction clear so that later earthworks do not inadvertently rely on records that do not cover them.

A finding during the project

If a suspected object is encountered, its location, depth and surroundings, the trades affected, contact persons and relevant authorities all matter. Clear communication arrangements agreed in advance reduce uncertainty during construction.

Documentation linked to the plans

Reports and results should refer to plans, alignments, coordinates, construction phases or site boundaries. This allows them to be used reliably in meetings, procurement and subsequent decisions.

The next technical step

The assessment must establish whether further records, an ordnance survey, borehole assessment, excavation supervision or follow-up work on findings is needed. Providing that clarity is its main value to the project.

Records for the project file and site management

Which documents need to be usable after the ordnance assessment?

Housing project documentation must be clear, tied to specific locations and usable by subsequent teams. It should record the result and explain how the site, depths, construction sequence and interfaces are to be addressed next.

Record the baseline information

The site address, site plan, land parcel, construction area, sections, construction phase and existing requirements provide the initial working basis.

Assess suspected ordnance

Historical records, previous land use, aerial photograph analysis and existing reports are reviewed alongside the planned ground works.

Specify the method and depth

The surface, interfering objects, ground conditions, services, excavation and planned depth determine which assessment is technically appropriate.

Document the result

The investigated areas, survey data, evaluation of findings, photographs and recommendations are recorded for the project. Where objects have actually been exposed or clearance work carried out, the corresponding investigation and clearance records are included.

Plan the next construction steps

The documentation must enable site management, procurement teams, subcontractors and subsequent trades to understand the next step.

Plan how findings will be reported

If suspected objects or ordnance are found, the location, surroundings, contact persons and relevant interfaces are established without delay.

Evidence dossier

Which project information needs to be brought together before work starts?

Housing projects need coordinated investigation work, ground data, construction planning and documentation. A well-prepared project file prevents important information being lost between design, procurement and site management.

Project file

Site information

The address, land parcel, site plan, vertical reference, plot boundaries and proposed building footprint define the location of the assessment.

Project file

Ground works information

The excavation depth, foundation type, basement, utility trenches, infiltration trenches, cisterns and temporary roads show where investigation is actually needed.

Project file

Available documents

Aerial photographs, historical plans, existing services, ground investigation data, geotechnical reports and requirements are reviewed together in the context of the project.

Project file

Documentation objective

Project management, site management, lenders, communication with buyers and procurement may each require different levels of documentation.

Project process

From the first records to a planned investigation

The sequence is planned so that ordnance assessment, ground investigation, infrastructure works, civil engineering and documentation follow the same project requirements.

01

Review the project enquiry and documents

The site plan, sections, depths of work, construction phase and existing evidence of suspected ordnance are brought together.

02

Define investigation boundaries

The construction area, route, excavation, borehole locations, working space and external areas are assessed separately according to the ground disturbance involved.

03

Assess suspected ordnance conditions

Historical and technical information is assessed so that the construction sequence is not determined by a blanket assumption.

04

Define the method

Suitable survey or supervision methods are selected according to the surface, interfering objects, ground conditions and depth.

05

Coordinate the work

Dates, access, site safety arrangements, site management and subcontractors are included in the programme.

06

Carry out the investigation

The agreed surveys or investigations during construction are carried out for the specified areas and depths. Their location, conditions and completed scope are recorded.

07

Assess results

Survey data, findings and limitations are evaluated. Working spaces that have not been investigated sufficiently, and any further investigation needed, are identified by location and depth.

08

Document results

The investigated areas, findings, data quality and next steps are recorded clearly for the project file.

Technical detail

Key factors in assessing a building plot

On a building plot, the appropriate ordnance assessment depends on the building location, depths, service connections and construction sequence. The plot area alone says little if only part of the site will be excavated deeply or if utility trenches extend beyond the building footprint.

Housing and infrastructure projects need an assessment of the actual ground disturbance: the area, depth, construction phase and required records determine the appropriate approach.

Technical consideration

Construction area rather than land parcel boundary

The investigation area follows the planned ground works, working spaces, access routes, storage areas and utility alignments. The whole parcel may be relevant, but clearly defined sections are often what matter technically.

Technical consideration

Depth and construction method

A ground slab, strip foundation, basement, bored pile, infiltration trench or shaft each has different requirements for investigation depth, method and supervision.

Technical consideration

Survey conditions in confined spaces

Existing walls, fences, metal objects, services and demolition rubble can affect survey results. The chosen method must suit the actual surface and ground conditions.

Technical consideration

Coordination with construction

The assessment must be coordinated with ground investigation, surveying, site establishment, earthworks and contractors to avoid becoming a late bottleneck.

Technical assessment points

What should be clarified before surveying, excavation or drilling?

The areas, planned depths, access, ground conditions and sources of interference are described before the method is selected. The subsequent report records the working space actually investigated and any limitations.

Check point

Surface conditions and access

Vegetation, temporary roads, stored materials, old foundations, fences and confined access routes affect whether a site can be surveyed effectively before excavation or needs a different sequence of work.

Check point

Sources of interference on housing sites

Metal fixtures, reinforcement, old services, scrap, demolition rubble and boundary structures can interfere with survey data and must be considered in the evaluation.

Check point

Depth of work and design level

The excavation formation level, drainage invert, pile starting level, infiltration trench, shaft and utility trench involve different depths. The records must show which ground works the assessment covers.

Check point

Utility and as-built plans

Information on existing services, building connections and public utility routes is needed not only for safety planning; it also informs the survey method, vehicle access and interpretation.

Check point

Construction phases and working windows

Necessary investigations are scheduled before the corresponding ground works. Separate investigation stages are defined for areas that become accessible later. Ordnance surveying during excavation must be technically suitable for the work; exclusion areas, reporting arrangements and the sequence are agreed with site management before material is removed.

Check point

Documentation limits

Every investigation record needs clear details of the assessed area, depth, method and limitations. This keeps its scope clear for later construction phases.

Comparing methods

Why the method must suit the site and the ground works

No single method replaces every other assessment. A reliable decision for a housing project considers the records, survey conditions, depth, access, construction sequence and documentation requirements.

Methods

Aerial-photo analysis

Historical aerial photographs help assess evidence of suspected ordnance and past land use, and prepare investigation areas. They do not show current ground conditions; their findings are therefore checked against current construction and survey data.

Methods

Surface survey

Surveying from the surface requires adequate access and suitable conditions. The working space, sources of interference, survey grid and achievable depth are specified for the construction area. Areas with insufficient coverage are assigned a separate investigation step.

Methods

Ground-penetrating radar

Ground-penetrating radar records reflections at material and structural boundaries and can provide additional information on non-metallic features and layering. Its suitability depends on the ground and surface conditions. A reflection does not unambiguously identify a metal target or ordnance.

Methods

Magnetometry

Suitable for magnetic anomalies in areas with little interference. Metal fences, reinforcement, services and scrap can limit the results.

Methods

TDEM

May be suitable for electrically conductive metal objects where site conditions permit. Its limitations depend on the target size, depth, surrounding interference and survey setup.

Methods

Deep-ground survey

For deeper ground works, the first step is to assess whether a suitable surface method covers the required volume of ground. Where coverage is insufficient, additional investigation at depth is planned for the actual location and required depth.

Methods

Downhole survey

Surveying from investigation boreholes may be considered where the investigation objective is suitable and other methods provide insufficient coverage. Borehole starting points, planned depths, drilling methods and the volume of ground that can be investigated are defined in advance.

Methods

Excavation supervision

The suitability of ordnance surveying during excavation is assessed for the specific work. Each working layer is surveyed and evaluated before controlled excavation proceeds. The results are documented with their location, depth and limitations; simply watching the excavator does not replace a necessary ordnance survey.

Methods

Ordnance recovery

Survey anomalies receive targeted follow-up investigation or exposure. Recovery of confirmed ordnance is coordinated within the permitted scope of work, local responsibilities and documentation requirements. If an unexpected suspicious object is encountered, stopping work, keeping a distance and reporting it immediately take priority.

Project routes

Coordinate records, investigations and construction

Tell us which work is due next. This determines whether the first step is to review reports, prepare borehole locations or plan the investigations needed for excavation.

Project pathway

Review the records before ground investigation

When borehole locations, window sampling or ground investigation are being prepared, the locations, depths and evidence of suspected ordnance should be considered together in advance.

Assess borehole locations in advance
Project pathway

Fit earthworks into the programme

The appropriate investigation method is selected in advance for excavations, utility trenches or ground reduction. Simply watching the excavator does not replace a necessary ordnance survey.

Select the investigation method before earthworks
Project pathway

Evaluate records of suspected ordnance

Before physical investigation, aerial photographs, historical plans and land-use history help define the investigation area and the priority of individual sections.

Review the evidence of suspected ordnance
Project pathway

Prepare evidence for procurement

Tendering and site management need a clear description of the scope, investigation area, depth, documentation and subsequent decisions.

Prepare evidence for procurement
Project pathway

Identify the project region

Regional responsibilities, the project location, federal state and available records may affect which interfaces need early preparation.

Assess the project region
Project pathway

Send a complete project enquiry

The site plan, sections, depths, construction phase, evidence of suspected ordnance and contact details can be sent together to FONTANA-EOD.

Send project documents
Working approach

Check the reports against the planned ground works

FONTANA-EOD assesses which existing findings cover the planned work. Areas still to be investigated, different depths and technical limitations are identified for subsequent planning.

Record locations and depths for site management and designers

The results are linked to the site plan and investigated depths. Site management and designers also receive details of the limitations and outstanding work. This makes it clear whether a later service connection or design change needs further assessment.

Project-specific assessment

The assessment follows the construction objective, depth of work, available records and construction sequence, rather than blanket assumptions.

State method limits

Survey methods are used so that interfering objects, the surface, ground conditions and access are taken into account in the evaluation.

Hand over the report and site plan together

Locations, methods, results and next steps are documented in a form that site management and the client can use.

Inform the project team about outstanding areas

Project managers, designers, civil engineering contractors, the relevant authorities and subsequent trades receive clear information about the area concerned.

Project responsibilities

Who provides which information for the ordnance assessment?

Clear responsibilities reduce delays. The client, designers, site management, specialist contractor, civil engineering contractor and relevant authorities have different tasks but work from the same site information.

Role

Client and project management

They define the project objective, working windows, available records and required documentation. These provide the framework for the technical assessment.

Role

Designers and specialist consultants

They provide site plans, sections, ground investigation data, borehole locations and technical details of the proposed ground works so that the investigation areas can be defined reliably.

Role

Construction and civil engineering contractors

They carry out earthworks, drilling, retaining works or utility trenching and need clear information on work areas, reporting arrangements and documentation.

Role

Competent authorities

In Germany, the ordnance disposal services of the federal states and the locally competent authorities carry out hazard-response and find-management duties. Their involvement is established for the project location; outside Germany, local responsibilities apply.

The local public order authority and, where relevant, building control authority are involved according to their project responsibilities. Requirements, contact persons and reporting arrangements are assigned to the plot, planned ground works and individual construction phases.

Examples of typical project situations

Records, investigation and documentation for housing construction

The working area, planned depth and access are established for each investigation. The results remain tied to the corresponding ground works.

Two people discussing plans at a table beside a vehicle on a construction site.

Investigation records for project participants

Reports, site plans and evaluations are handed over together so that the client and site management can understand the investigated areas and limitations.

Bring the investigation records together
Four people in orange high-visibility vests in front of two excavators on a construction site.
Person with a yellow survey cart on a footpath in front of a hedge.
Identify the project location

Define the plot and individual ground works by location

Illustrated map of Germany with location markers on a construction site.

Identify the site and applicable requirements

For individual building plots, the ground works concerned must be defined precisely. Excavations, ground slabs, basements, service connections, access routes and ancillary work areas can have different investigation requirements.

The project location, land parcel and site plan tie the information to the specific plot. Existing requirements, records and contact persons are assigned to the planned building and infrastructure works.

Technical information

Housing and site development: brochure

From development works to excavation: the brochure shows how to consider ordnance risks early and prepare investigations suited to the planned earthworks.

1 / 8
Housing and site development: brochure – page 1

German · 8 pages

Questions from housing projects

Frequently asked questions about ordnance assessment for a building plot

When should a building plot be assessed for ordnance?

An assessment is advisable once earthworks, foundations, a basement, utility trenches, drilling or changes to the ground levels are planned and the evidence of suspected ordnance has not been reliably resolved. The actual ground works, depth, existing records and documentation needed by the design team or site management are what matter.

Is a general site plan enough for an initial assessment?

A site plan is a useful starting point, but is often not sufficient on its own. Helpful information includes the land parcel, building footprint, planned excavation depth, utility alignments, ground investigations, existing reports, aerial photograph analysis and details from the planning application or project management team. Official information and requirements should be included with their dates, complete appendices and the areas to which they apply.

Which methods may be considered for a building plot?

Depending on the surface, interfering objects, ground conditions and depth, historical aerial photograph analysis, ground-penetrating radar, magnetometry, TDEM, investigation at depth, downhole surveying or excavation supervision may be relevant. The methods are selected for the planned ground works rather than applied as a standard package. The findings apply only to areas and depths where the investigation produced interpretable results. Areas affected by services or metal fixtures are identified with their additional investigation requirements.

Does the whole plot need an ordnance survey?

Not always. The assessment often covers the areas actually affected by ground works, such as the building footprint, excavation, service connections, access route or infiltration trenches. The available records or project objective may also make a larger area relevant.

How is the ordnance assessment coordinated with the geotechnical report?

Borehole locations, starting elevations, planned depths and equipment are checked against the evidence of suspected ordnance. This establishes whether a technical investigation or coordinated survey is needed before ground investigation.

What happens if a suspected object is found in the ground?

If an unexpected suspicious object is found, stop work in the affected area immediately. Do not touch, move or uncover the object further. Leave the immediate area and keep others away without putting yourself at risk. In Germany, notify the police immediately on 110; outside Germany, use the local emergency reporting procedure. The competent authorities determine what happens next. Inform site management and the client; internal reporting must not delay the emergency call.

Which investigation records does the client receive?

Typical records identify the location, investigated areas, methods used, measurement or survey results, photographs, evaluation of findings and recommendations for the next project step. Their precise form depends on the commission, project phase and assessment objective.

What determines the effort and cost of an ordnance assessment?

The main factors are the area, excavation geometry, depths of work, ground conditions, sources of interference, access, construction phases, existing records, required methods and documentation. Pricing requires details of the planned working spaces and commissioned investigation scope.

Preparing an enquiry

Information needed for a reliable assessment

Precise details of the project location, ground works, depth and construction phase help FONTANA-EOD identify the appropriate next technical step for the housing project.

Site and area

Address, land parcel, site plan, construction boundary, building footprint, routes and affected sections.

Ground disturbance and depth

Excavation, basement, foundations, borehole locations, utilities, shafts, infiltration trenches, excavation depth and construction phase.

Available documents

Aerial photograph analysis, historical plans, utility plans, ground investigation data, sections, requirements and existing reports.

Documentation objective

Procurement, site management, project records, communication with buyers, ground investigation or a follow-up decision.

Submit project details together

Please send the available documents as fully as possible. An early design can also be assessed if the location, planned ground works, depth, construction phase and required records are clear.

Telephone

+49 (0) 6843 - 999 499 7

Email

info@fontana-eod.de

Project documents

Site plan, depth, construction phase, suspicion indicators

Contacts

Site management, design or project management

Have project documents assessed
Project details

Information that helps us assess the building plot

Send the site plan and sections showing the planned ground works, depths and corresponding construction phase. Identify existing investigations and the next scheduled date.

Describe the location clearly

The address, land parcel, plan extract and coordinates help identify the investigation area without further enquiries. Larger projects should also identify construction phases, alignments or work area numbers.

Specify proposed formation levels and depths

Planned depths are essential for the technical assessment. Sections, excavation formation levels, drainage inverts, borehole profiles and foundation depths provide a much stronger basis than a general project description.

State the construction phase

An enquiry before ground investigation, before tendering or shortly before excavation starts leads to different next steps. Please state the project stage clearly.

Include the existing records

Aerial photograph analysis, geotechnical reports, utility plans, historical plans, existing site records and requirements should be sent together so that individual details are not taken out of context.

Identify the project contacts

Project managers, designers, site managers, civil engineering contractors and the client hold different information. Clear contact arrangements make it easier to coordinate dates and resolve questions.

Define the purpose of the documentation

Before submitting an enquiry, state whether the records are needed for procurement, site management, ground investigation, communication with buyers or a subsequent technical decision.

Project enquiry

Have your project assessed

Whether historical aerial photograph analysis, explosive ordnance surveying, surface surveying using GPR, magnetometry or TDEM, deep-ground surveys, downhole surveys, excavation supervision, area clearance or ordnance recovery is needed depends on the location, ground disturbance, depth, ground and existing documents. An early ordnance assessment provides clarity for tendering, programming, occupational safety and construction.

FONTANA-EOD combines its Section 7 SprengG licence, specialists holding Section 20 SprengG certificates of competence, suitable survey and clearance methods, and traceable documentation. Send the site plan, depth of ground disturbance, construction phase and existing documents for an initial technical assessment.