+49 (0) 6843 - 999 499 7 info@fontana-eod.de f
FONTANA-EOD project coordination

The right starting point for your project

Available 24/7 | +49 (0) 6843 - 999 499 7 Email | info@fontana-eod.de f

Choose where to start: assess suspected ordnance, understand survey methods, open a project type or region, clarify documentation or contact us directly.

Have your project assessed Send the location and project documents Call now Speak directly with FONTANA-EOD Clarify documentation View the process and documentation

Main sections

Services, regions, guidance and contact.

FONTANA-EOD Explosive ordnance clearance ⌖ ServicesSurveys, clearance, documentation › ◇ SectorsConstruction, rail, energy, local authorities › ⌾ RegionsProject regions and operational areas › ✓ DocumentationProject process and documentation › ? GuidanceCosts, responsibilities, FAQ › E EODTerminology and scope of services › ▣Ordnance findsIdentification images and catalogue› @ ContactSubmit a project enquiry ›

Project pathway

The quickest route to the right decision.

01 Assess suspected ordnanceAerial photographs and other evidence 02 Select a serviceUnderstand the methods 03 Project typeRail, construction, energy 04 RegionOpen the location 05 DocumentationPlan the process 06 EnquiryStart the assessment

Common project questions

Typical questions from construction and infrastructure projects.

◎ Area with suspected ordnanceAssess historical evidence. ◌ Survey the surfaceGPR, magnetometry, TDEM. ⌖ Survey at depthClarify the downhole survey. ▣ ExcavationArrange specialist supervision of groundworks. ◇ Project typeRail, civil engineering, energy, local authorities. ? Technical questionsCosts, responsibilities, immediate action.
No results. Try a broader search, such as “survey”, “GPR”, “region”, “costs” or “contact”.
•

Menu item

Open the relevant section.

Hide navigation Show navigation
  • FONTANA-EOD
  • About us
  • Services
    • Historical aerial photograph analysis
    • Surface survey
      • Ground-penetrating radar / GPR
      • Magnetometry
      • TDEM
    • Deep-ground and downhole surveys
    • Excavation supervision
    • Area clearance
    • Ordnance recovery
    • Clearance concepts
  • Process & documentation
    • Project process
      • Quotation information and project documents
      • Coordination with authorities and project interfaces
      • Clearance and documentation during construction
    • Clearance concept & completion documentation
      • Ordnance clearance confirmation
      • Explosive ordnance clearance concept
      • Survey report and clearance record
    • Quality & safety
    • Expertise & equipment
  • Regions
    • North Rhine-Westphalia
      • Cologne administrative district
      • Düsseldorf administrative district
      • Münster administrative district
      • Arnsberg administrative district
      • Detmold administrative district
    • Rhineland-Palatinate
      • SGD Nord
      • SGD Süd
      • Trier area and Westpfalz
    • Lower Saxony
      • Braunschweig administrative area
      • Leine-Weser administrative area
      • Lüneburg administrative area
      • Weser-Ems administrative area
    • Hesse
      • Darmstadt administrative district
      • Gießen administrative district
      • Kassel administrative district
    • Baden-Württemberg
      • Stuttgart administrative district
      • Karlsruhe administrative district
      • Freiburg administrative district
      • Tübingen administrative district
    • Bavaria
      • Upper Bavaria
      • Lower Bavaria
      • Upper Palatinate
      • Upper Franconia
      • Middle Franconia
      • Lower Franconia
      • Swabia
    • Luxembourg
      • Central Luxembourg
      • Minette and southern Luxembourg
      • South-west Luxembourg
      • Bettembourg logistics corridor
    • Bremen
      • Bremen City
    • Saarland
  • Sectors and applications
    • Rail and track corridors
    • Road construction and civil engineering
    • Utility and energy projects
    • Industry and commercial sites
    • Housing and site development
    • Municipalities and public-sector clients
    • Ordnance surveys for critical infrastructure
    • Ordnance checks for environmental and geotechnical consultancies
    • Ordnance documents for insurers and risk management
  • News
  • Knowledge for ordnance assessment in construction projects
    • Immediate action after a find
    • Construction projects and suspected ordnance
    • Explosive ordnance disposal: process and methods
    • Public ordnance disposal service, authority and private specialist company
    • Aerial warfare and unexploded ordnance – background
    • Combat remnants and ammunition
    • Law, responsibilities and occupational safety
    • BFR KMR: guidelines for explosive ordnance clearance
    • Costs of an explosive ordnance survey
    • Tendering ordnance surveys: clarify the service and bill of quantities
    • Buying property with suspected explosive ordnance
    • DGUV 113-003, BGR 114 and explosive ordnance clearance
    • Explosive ordnance glossary A–Z
    • Questions about explosive ordnance and construction projects
  • Ordnance finds
  • Contact

Image credits

  • © BDFWT - [1]
  • © BVMW e.V. - [1]
  • © Creditreform - [1]
  • © FONTANA-EOD - [1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12] [13] [14] [15] [16] [17] [18] [19] [20] [21] [22] [23] [24] [25] [26] [27] [28] [29] [30] [31] [32] [33] [34] [35] [36] [37] [38] [39] [40] [41] [42] [43] [44] [45] [46] [47] [48] [49] [50] [51] [52] [53] [54] [55] [56] [57] [58] [59] [60] [61] [62] [63] [64] [65] [66] [67] [68] [69] [70] [71] [72] [73] [74] [75] [76] [77] [78] [79] [80] [81] [82] [83] [84] [85] [86] [87] [88] [89] [90] [91] [92] [93] [94] [95] [96] [97] [98] [99] [100] [101] [102] [103] [104] [105] [106] [107] [108] [109] [110] [111] [112] [113] [114] [115] [116] [117] [118] [119] [120] [121] [122] [123] [124] [125] [126] [127] [128] [129] [130] [131] [132] [133] [134] [135] [136] [137] [138] [139]
  • © Guideline Geo AB - [1]
  • © Heim - [1]
  • © IDS GeoRadar - [1]
  • © Liebherr - [1]
  • © Oliver Wright - Pexels - [1]
  • © SAT.1 NRW / WestCom Medien GmbH - [1]
  • © Stonex - [1]
  • © Trimble - [1]
  • © VALLON - [1]
  • © VALLON GmbH - [1] [2]
  • © Volvo Construction Equipment - [1]
  • © Wacker Neuson - [1]
FONTANA-EOD white logo

FONTANA-EOD
Consulting & Engineering GmbH

Head office:
Am Kaninchenberg 5
D-66453 Gersheim

Branch office:
Bonner Straße 72
D-50389 Wesseling

Contact:

Main telephone: +49 (0) 6843 - 999 499 7
Contact email: info@fontana-eod.de
Back office email: office@fontana-eod.de

  • Company
    • Company
    • Team
    • Careers
    • News
    • References
    • Downloads & checklists
    • Ordnance specialist holding a Section 20 SprengG certificate of competence (all genders)
  • Legal
    • Legal notice
    • Terms and conditions
    • Privacy
    • Cookies
    • Image credits

 

 

 

 

             

 

 

Contact our team directly

Monday to Friday only: 09:00 to 17:00
 

O. Fontana: +49 170 3223239

B. Surat: +49 157 337 227 77

D. Sinatra: +49 163 887 832 9

Association memberships

FONTANA-EOD BVMW e.V. membership
BDFWT
Crefo membership
 Zentrale Rufnummer +49 (0) 6843 - 999 499 7   Am Kaninchenberg 5, D-66453 Gersheim und Bonner Straße 72, D-50389 Wesseling

We use cookies to optimise our website and give you the best possible online experience . By clicking “Allow all” , you agree to this.

Settings