Ordnance surveys by sector and project type

Railway corridors, utility trenches and industrial sites present different ordnance-assessment tasks. FONTANA-EOD considers the basis for suspicion together with working area, intervention depth and construction sequence. Select your project environment and send a site plan and existing investigations so that specialist services, operating interfaces and required documentation can be agreed.

Select the project type

Identify the sector and construction task.

Describe the ground disturbance

Define the area, depth and sequence.

Plan documentation

Use results in their project context.

Clarify sector-specific investigation needs

Why the same suspected risk can require different measures in different projects

The ordnance assessment a project needs depends on the construction task, intervention depth and operating conditions. Track reconstruction, utility trenches, excavations and industrial extensions need different investigation areas and sequences. Enquiries therefore bring together the basis for suspicion, working area and operating requirements before the service and scope are defined.

Project references

Selected project examples

Ordnance survey – A 6 AS Öhringen–AS Kupferzell – ground investigation – Bohrgesellschaft Roßla Öhringen – Kupferzell / Germany · Stuttgart administrative district

The service scope for “A 6 AS Öhringen–AS Kupferzell – ground investigation – Bohrgesellschaft Roßla Öhringen – Kupferzell / Germany · Stuttgart administrative district” comprised downhole magnetometry.

Service period: 2026-08

Service areas:Downhole magnetometry / deep-ground survey

View project details · Deep-ground and downhole surveys · Region: Stuttgart administrative district

Sectors and project types

Ordnance assessment for typical project environments

Each sector has its own working areas, time pressures, interference and documentation routes. Choose the environment closest to your project.

Sector classification serves project organisation. The technical method is then derived from suspected ordnance, target object, intervention depth, surface, ground and measurement quality actually achievable.

Larger programmes can combine several sector characteristics, such as an energy project in a railway environment or municipal development on a former industrial site. Requirements are then divided by working area and responsibility, rather than assigning the whole project to a single category.

Even within the same sector, new construction, refurbishment, maintenance and demolition differ considerably. What matters is the current construction stage, the working areas actually accessible and the status that must be evidenced before the next intervention.

Roadworks with an open utility trench, pipes and an excavator near a bridge.

Road construction and civil engineering

Roads, sewers, bridges, retaining walls and urban civil engineering combine changing intervention depths with traffic, utilities and constrained construction sequences. Investigation areas are divided by excavation, alignment, junction and construction section.

Depending on survey conditions, historical preliminary assessment, area surveys, downhole surveys or excavation supervision may be used. Documentation must identify the area actually investigated or treated afterwards.

Traffic management, retaining works, dewatering and phased handovers are considered in tendering and construction-phase planning. This keeps the area investigated before the next earthworks stage identifiable.

Assess road and civil engineering requirements
Railway route with a track construction machine, cable duct and adjoining construction area.

Rail and track corridors

Track areas, railway embankments, cable routes, platforms, bridges and station areas need planning by chainage and section. Track possessions, operating installations, track superstructure and restricted access affect technical feasibility.

Survey and clearance services are coordinated with construction stage, working window and railway operations. Results remain assigned to the relevant line, chainage and intervention depth.

Cable crossings, points and switches, retaining structures and work near operational installations need particular attention. Interference and confined working areas may require additional investigation measures there.

Assess the railway project
Open utility trench beside solar panels, wind turbines and a substation.

Utility construction and energy

Cables, pipelines, wind and solar parks, substations, grid connections and mast locations create linear and point interventions at the same time. Route sections, crossings, joints, boreholes and assembly areas are assessed separately.

Historical and technical assessment must match installation depth, working width and construction method. Consistent chainage references in the documentation are essential for long corridors.

Access routes, crane standing areas, cable-pulling chambers and temporary site facilities are also considered where relevant ground interventions or load transfers are planned.

Assess the energy project
Excavator in front of a commercial building with a construction area in the foreground.

Industry and commercial sites

Existing foundations, utility networks, steel structures, fill, production operations and previous uses can considerably affect measurement and access. Extensions, halls, tank areas and logistics areas therefore need a phased approach.

Permissions to work, shutdowns, working areas and documentation interfaces are coordinated with the operator, designers and construction team.

During refurbishment or demolition, the current construction stage is continually considered. Newly accessible areas may need different investigations from areas previously built over or affected by installations.

Assess industrial site requirements
Fenced construction site with excavators and materials in front of a large building.

Local authority projects

Schools, nurseries, administrative buildings, sports facilities, road space and urban-development sites require transparent tender documents and clear responsibilities.

Ordnance assessment is described so that the authority, design consultancy, site management and contractors use the same basis for area, depth and evidence.

Early clarification supports budgeting, scheduling and formal tendering. Later changes to the construction area are checked against the documented investigation scope.

Assess the local authority project
Road and utility works between multistorey new buildings.

Housing and site development

New developments, neighbourhoods and infill projects combine land development, roads and utility infrastructure, ground investigation and subsequent individual construction projects. Investigation status must remain understandable across several phases.

Phasing and consistent data handover help developers, local authorities, utility providers and later project owners access the same status of work.

For individual plots, it must remain clear which conclusions from the wider infrastructure development can be used and which structure-specific additions are still needed before foundations or excavation.

Assess the housing project
Two people discussing plans at a table beside a vehicle on a construction site.

Critical infrastructure

Energy, water, transport and communications facilities combine high availability requirements with restricted access and sensitive operating processes. Protective areas, system isolation and reporting routes must be established early.

The service is coordinated with the installation area, deep intervention, operating state and required evidence without unnecessarily disrupting ongoing operations.

Shutdown risks and safety zones are considered when choosing methods and scheduling. Deviations from the planned working window trigger renewed coordination with operational managers.

Clarify the project process and documentation
Open, partly wet construction area with wall remains and individual metal pipes.

Environment, contaminated land and geotechnics

Percussion core sampling, groundwater monitoring wells, sampling, remediation and geotechnical investigations target specific ground volumes. Ordnance, contaminated-land and geotechnical questions remain technically separate but are coordinated in the work sequence.

Borehole positions, sampling areas and protective arrangements are planned so that every discipline receives reliable results that can be assigned unambiguously.

The investigation sequence and release points are agreed so that preliminary ordnance checks are complete before the respective drilling, sampling or remediation step.

Assess environmental and geotechnical requirements
Two people discussing plans at a table beside a vehicle on a construction site.

Insurers and risk management

Project insurers, financing partners and risk managers need traceable information on suspected ordnance, work scope, limitations and outstanding measures. General safety assurances do not replace spatially defined documentation.

The project file is structured so that investigation status, residual uncertainty, plan changes and follow-up decisions can be communicated transparently.

For risk assessment, the sources available, investigated areas and methodological limits are shown separately. Technical measures and remaining project assumptions can thereby be distinguished objectively.

Clarify the project process and documentation
Project decision scenarios

Conditions that shape the sector-specific approach

The construction task, operator environment and project phase affect how suspected ordnance, technical investigation and construction sequence fit together.

Suspected ordnance initially indicates possible contamination. The resulting specialist service depends on the actual project: a long utility trench needs a different section structure from a single mast location, track reconstruction, an urban excavation or an extension during ongoing industrial operations.

Linear projects with changing sections

Rail, road, cable and pipeline routes cross different ground conditions and historical uses. Services are therefore described by more than total length and average depth.

Chainage, crossings, structures, working widths, depth changes and inaccessible sections form the basis for surveys and later documentation.

Handover points between contract sections or construction phases are identified clearly to prevent spatial gaps between planning, surveying and execution.

Have the corridor project assessed

Construction within existing sites and ongoing operations

Industrial plants, transport areas, utility sites and urban neighbourhoods contain utilities, reinforcement, foundations and technical interference. Access and shutdowns may be available only in limited windows.

Preliminary investigation, excavation supervision and alternative measures are coordinated with the operator and construction sequence.

Documentation distinguishes permanently accessible investigation areas from areas that can be assessed only after demolition, system isolation or a new construction stage.

Assess the existing-site project

Public procurement and funded projects

Local authorities and public clients need comparable service descriptions, clear qualification requirements and a verifiable definition of work scope.

The clearance objective, investigation areas, depths, interfaces and documentation scope are described so that quotations remain technically comparable.

Ancillary prices and provisional items are included only where the potential follow-up service is technically justified and its trigger clearly defined.

Prepare procurement

Borehole locations, piles and specialist foundation engineering

Geotechnical investigation, foundations, masts, retaining works and underpinning affect defined locations and depth volumes. A general site assessment does not automatically address these working spaces.

Coordinates, design depth, construction method, safety space and surrounding utilities are linked to the deep-ground survey.

Surveying and reports link planned and actual point positions, allowing relocations and additional boreholes to be tracked clearly.

Assess deep interventions

Large development and conversion sites

Several construction areas, infrastructure alignments and later individual projects need an updatable work status. Historical preliminary assessment, technical investigation and clearance sections are organised in phases.

Maps and reports must show which subarea was treated, when and for what objective.

Overall site assessment and section-specific evidence are kept separate, allowing later individual projects to identify their own intervention space traceably.

Make an initial assessment of suspicion

Short construction windows and concurrent trades

Track possessions, traffic management, shutdowns and scheduled follow-up work increase preparation and communication requirements. Unclear hold points can affect the entire construction sequence.

Ordnance assessment is linked to construction decision points and clear reporting routes.

Staff and equipment availability, data review and report delivery are coordinated with critical dates without reducing minimum methodological requirements.

Coordinate the technical sequence
Project phase and service needs

From construction task and suspected ordnance to an appropriate service

Each project phase asks a different question. The technical step must therefore fit the current decision and actual intervention space.

Sector-specific planning combines historical background, working area, intervention depth, access, utilities, operating conditions, construction phases and required documentation. Only then can the need for historical aerial photograph analysis, surface or deep-ground surveying, excavation supervision, area clearance or ordnance recovery be identified.

Feasibility and site selection

Project question: Which historical or known indications may affect site development?

Technical step: Historical aerial photograph analysis, document review and initial spatial assessment provide the basis for options and budgeting.

Use: Unresolved site and data risks can be identified before purchase, committee decisions or further planning.

Design development

Project question: Which construction areas, routes, borehole locations and depths are actually affected?

Technical step: Areas of suspected ordnance are overlaid with the plans to define technical investigation areas and method requirements.

Use: Options can be compared by additional investigation needs, access and effect on construction sequence.

Tendering

Project question: Which services, qualifications and documentation need contractual definition?

Technical step: Area, depth, method, interfaces, quality control and acceptance criteria are defined clearly.

Use: Quotations address the same scope and can be assessed transparently on technical and commercial grounds.

Work preparation

Project question: Which access routes, utilities, operating conditions, closures and protective areas affect execution?

Technical step: Survey and construction sequences are coordinated; plan revisions and responsible persons are assigned definitively.

Use: Permissions to work, access, closures and data handovers are clarified before the trades mobilise.

Construction execution

Project question: Have all working areas been adequately investigated before ground disturbance, or is specialist work during construction required?

Technical step: preliminary investigation, deep investigation, excavation supervision or clearance are carried out and documented by section. Where technically suitable surveys during construction are used, each layer is technically checked and assessed before soil removal. Additional visual inspection accompanies subsequent excavation, followed by a new survey before the next layer.

Use: Site management and specialist supervision can identify the area treated and the deviations requiring a new decision.

Completion and updating

Project question: Which area was actually treated, and what limitations remain for later construction stages?

Technical step: Reports, site plans, findings and follow-up decisions are brought together in the project file.

Use: Operators, clients and later design phases can use the status achieved without losing its spatial reference.

Investigation task

Derive the method from the construction task

Two monitors displaying aerial photographs and maps; further aerial photograph printouts lie on the desk.

Check the basis for suspicion and design status

A sector label is insufficient for commissioning an investigation. Existing historical assessments, statements and earlier investigations are first compared with today’s working areas. What matters is the question these documents already answer and the part of the planned intervention not yet covered. The next technical step can then be justified without deriving particular contamination from the property’s use alone.

Assess the basis for suspicion
Person beside a survey instrument on a construction site; a wheeled excavator with drilling equipment stands behind them.

Consider area, depth and construction method together

One construction measure may involve broad working areas and individual deeper interventions. An existing area result is therefore not applied unchecked to piles, boreholes or new retaining-work alignments. Method selection considers location, dimensions, design depth, accessible surface and known interference together. The responsible design team can then identify the tasks requiring separate enquiries.

Clarify area and depth references
Technical assessment

Define interfaces between trades in combined projects

Shared plan, separate working areas

An energy connection beside a railway or infrastructure development on an industrial site combines several project environments. Investigation areas receive clear identifiers in the shared site plan. Overlaps and adjoining areas are explicitly identified. This keeps clear which documents apply to the cable trench, foundation or site access.

Document changes in construction stage

An investigation may use a different ground-surface or design status from later execution. After demolition, additional fill or changed intervention geometry, the team checks which conclusions remain usable. The change and affected areas are described together so that any necessary addition can be scoped technically.

Tie handovers to the next commission

Where several contractors are involved, the status handed over must support the next work instruction understandably. It includes investigated limits, plan revisions used, unresolved questions and agreed follow-up services. A combined project status does not replace spatial assignment of this information. Design and site management thereby receive a shared basis for further coordination.

Documentation across sectors

Information needed by designers, site management and operators

Documentation is adapted to project geometry and organisation. A corridor needs different references from an industrial site or single municipal measure, but the technical core remains comparable.

Report recipients may need different information. Site management needs clear section and hold-point details, operators need installation and operational references, while clients and insurers particularly need to understand work scope, limitations and outstanding measures. All outputs nevertheless use the same technical data basis.

Tendering and site management must also know how subareas, route chainage, borehole locations, closure periods, concurrent trades and handovers are documented. A general ordnance-survey item is insufficient when several construction stages or operator requirements interact.

Measurement data, survey results and assessment of findings remain linked to their working spaces. Subsequent uncovering or clearance adds the relevant finding and clearance records. Reports and maps show which evidence belongs to which completed service and construction stage.

Project and section reference

Construction areas, routes, chainage, structures, borehole locations and installation areas provide the spatial reference. Treated and untreated zones are clearly separated.

Updates identify plan revision, date and change. The geometry underlying an earlier assessment therefore remains identifiable.

Basis for suspicion and source documents

Historical assessments, official information, known finds and project requirements are documented with their scope.

Conflicting conclusions or missing appendices are not combined without explaining their origin. Outstanding points receive a specific clarification task.

Service and execution conditions

Methods, measurement coverage, depths, working layers, access, interference, operating requirements and construction-sequence changes are described traceably.

The report also identifies quality controls performed and the data actually available for technical assessment.

Findings and limitations

Anomalies, uncovering, finds, areas that cannot be surveyed and methodological limits remain tied to location and visible for later decisions.

For unresolved suspected targets, the records state whether further interpretation, target investigation, clearance or adjustment of the construction method is planned.

Interfaces and handovers

Clients, designers, site management, operators, specialist contractors and competent authorities receive the information needed for their respective responsibilities.

Handovers are documented with plan revision, appendix register and contact, keeping decisions traceable through personnel or contract-section changes.

Project-specific conclusion

The report identifies the status achieved and the further investigation, clearance, recovery or plan adjustment needed for the next step.

Conclusions remain tied to the construction stage described. Additional depths, new areas and changed methods are reassessed before execution.

Sector-specific project process

From construction task to a documented decision for the next operation

The work is integrated into the existing project organisation. Decisions follow design status, intervention space and the conclusions actually achievable.

Contract-section changes, operator handovers and construction phases separated in time explicitly transfer data status and responsibility. The technical chain is retained even when several companies work successively in the same area.

In multiphase projects, documentation retains earlier investigations without applying them unchecked to changed routes, additional structures or greater depths.

01

Record the project environment

Sector, operator structure, construction task, project phase, schedule and participants are clarified at the start.

02

Assess records and suspected hazards

Site plans, historical assessments, authority correspondence, utilities and earlier findings are assigned spatially.

03

Define working areas

Construction areas, routes, chainage, borehole locations, excavations, assembly areas and intervention depths are defined.

04

Select the service and method

Historical assessment, surface or deep-ground surveys, excavation supervision, clearance and recovery are combined according to suitability.

05

Organise interfaces

Access, closures, operator requirements, concurrent trades, channels for issuing instructions and hold points are agreed before execution.

06

Perform the specialist service

The agreed investigation or clearance is performed by section and location; deviations are recorded immediately.

07

Assess the result technically

Measurement data, findings, limitations and construction stage are assessed against the investigation or clearance objective.

08

Hand over documentation and the next decision

The project file, site plans and conclusion form the basis for the next design or execution step.

Go directly by project task

The right starting point for your project

Choose the current project need. The linked specialist pages lead to sector-specific requirements or the appropriate service.

Combined projects may need more than one starting point. What matters is the working area next to be designed, tendered or constructed.

Long corridor or transport route

For rail, roads, cables and pipelines with changing sections, crossings and intervention depths.

Chainage and construction phases provide the shared reference for investigation and documentation.

Excavation, sewer or civil engineering

For earthworks, transport areas, bridges, retaining walls and municipal civil engineering.

Excavations, utility spaces and later deeper interventions are considered separately.

Boreholes, piles or masts

For point-specific deep interventions in geotechnics, foundations, energy and infrastructure projects.

Coordinates, design depth and construction method determine the investigation area required.

Existing site with interference

For industry, commercial sites and critical infrastructure with utilities, steel, foundations or ongoing operations.

Access, system isolation and technical interference are clarified before method selection.

Large development site

For infrastructure development, housing, local authorities or conversion projects with several construction areas and phased work.

Overall assessment and subarea documentation are organised for continuing updates.

Unclear requirement or condition

For reports, specifications or official documents that do not yet identify the actual specialist service.

The unresolved requirement is expressed in terms of area, depth, method, interface and documentation objective.

Working in the project environment

Integrating ordnance assessment into complex construction and operating processes

Permissions to work, working areas and investigation results must fit the construction sequence. FONTANA-EOD agrees with the client, designers and operator which areas and depths are investigated, what access is available and which documents are needed before the next intervention.

Define the service scope for the specific working area

FONTANA-EOD first considers the decision the project needs: defining suspected ordnance, technically investigating areas, assessing deep interventions, supervising excavation, investigating anomalies or preparing completion documentation. The sector provides the organisational framework but does not replace technical assessment of the individual case.

Survey methods are selected by target object, ground conditions, interference and intervention depth. For rail, industry and critical infrastructure, metal installations and restricted access may shape interpretation; corridors and developments place particular emphasis on sectioning, chainage and data consistency.

All design or construction-stage changes are checked against the previous scope. This keeps clear which conclusions remain usable and where additions are needed.

Large programmes standardise data structures and naming conventions across the project. This helps compare subprojects without erasing the technical differences between individual areas or construction stages.

Technical review is also linked to project decision dates. Early information needs take priority; later sections receive detailed assessment once their geometry and execution are sufficiently defined. Work thereby stays targeted and capable of being updated.

Clarify project roles

Clients, designers, operators, site management, specialist contractors and competent authorities receive defined tasks and reporting routes.

Understand the construction sequence

Track possessions, operating states, construction phases, concurrent trades and decision dates are included in service planning.

Justify the methods

Methods and combinations follow measurement objectives, depth, ground conditions and interference.

Divide areas clearly

Construction areas, sections, chainage, borehole positions and inaccessible zones remain spatially traceable.

Communicate limitations

Technical limitations and residual uncertainty are identified early and linked to appropriate follow-up measures.

Keep documentation usable

Reports and maps are structured for continued use in procurement, site management, operations and later updates.

Responsibilities and interfaces

Who turns sector-specific requirements into design and execution

Complex infrastructure projects often involve several client, operator and contractor levels. Ordnance assessment therefore needs clear information flows and decision points.

Client

Developer, local authority or project promoter

Defines the project objective, investigation area, required documentation and contractual interfaces. Provides known information on suspected ordnance and existing structures.

Design

Specialist planners, engineering and environmental consultancies

Translate the project into areas, routes, depths, borehole locations and phases, and incorporate ordnance services into design and tendering.

Operations

Plant, network and infrastructure operators

Arrange access, system isolation, closures, protective areas and operational reporting routes. Changes in operating state are considered in work preparation.

Execution

Construction contractor and site management

Coordinate equipment, personnel, sections and concurrent trades, and implement agreed hold points and communication routes.

Specialist contractor

FONTANA-EOD

Assesses suspected ordnance and service needs, performs the commissioned specialist service and documents results, deviations and scope limitations.

Public authorities

KBD, KMBD, KRD and local authorities

Undertake hazard-response, find-handling and further decision tasks according to project location. Names and specific responsibilities differ regionally.

Public-order authorities and building control may be involved depending on local procedures and the construction task. Existing requirements are assigned to the actual site and working area. Commercial specialist services, operational work authorisation and authority decisions on finds each have their own contact and reporting arrangements.

Comparing project conditions

Sector-specific features that shape the service

Investigations must fit the planned ground interventions and site conditions.

The location and depth of works, existing installations and ongoing operations determine which methods can be used.

Railway route with a track construction machine, cable duct and adjoining construction area.

Corridor work by chainage

In linear projects, measurement areas, borehole locations and findings are referenced by chainage and section, keeping documentation consistent over long corridors.

Open rail and track corridors
Excavator in front of a commercial building with a construction area in the foreground.

Plant operations and interference

For existing installations, technical interference, permissions to work and possible alternative measures are considered during work preparation.

Open industry and commerce
Fenced construction site with excavators and materials in front of a large building.

Public-sector project file

Local authority projects need a clear evidence chain so that tendering, grant procedures and later construction stages use the same status of work.

Open local authority projects
Open, partly wet construction area with wall remains and individual metal pipes.

Drilling and environmental investigation

Geotechnical and contaminated-land investigations need ordnance-related checks without mixing their own assessments with ordnance assessment.

Open environment and geotechnics
Two people discussing plans at a table beside a vehicle on a construction site.

Operationally sensitive infrastructure

The specialist service is adapted to installation status and the planned intervention. Inaccessible areas and operating restrictions remain part of the conclusion.

Clarify the project process and documentation
Four people in orange high-visibility vests in front of two excavators on a construction site.
People beside and inside shoring in a track area at night.
Project site

Consider project environment and location together

Illustrated map of Germany with location markers on a construction site.

Relate regional documents to the specific construction area

For projects with several locations, maintain site plans, existing information and responsible contacts for each site. A common sector task does not mean that previous conclusions or local procedures transfer unchecked to another location. Alongside the sector, give the actual address, affected properties and existing project requirements. For longer routes, a clear section structure helps assign documents and further coordination to the correct territory.

Understand the results

Distinguish sector context from technical conclusions

Separate project organisation and investigation

Operating windows, traffic management and coordination with installation owners shape service organisation. Alone, they do not establish a suitable method or achievable conclusion. An understandable enquiry therefore presents organisational conditions together with the technical question. Access, investigation scope and documentation needs can then be coordinated.

Explore results and terminology

Assign the outstanding task to the appropriate service

Preliminary assessment, surveys, work during construction and investigation of findings need different specialist services. Where a report already exists, its spatial and depth references and stated limitations are decisive. This information identifies the appropriate service for the outstanding question and defines the required scope.

Understand the service scope
Questions about sectors and applications

Common questions from design, procurement and construction

Commissioning depends on location, basis for suspicion, planned intervention and operating conditions. Required documentation is agreed with the client, designers and operator.

Why does ordnance assessment differ by sector?

Project types differ in intervention geometry, depth, access, existing utilities, operating conditions, closure periods and required documentation. A railway corridor is organised by chainage and track possessions, an industrial site by plant areas and operator work permissions, and housing development by construction areas and infrastructure phases. Suspected ordnance remains important, but is always related to the actual construction and operating sequence.

Which service should come first in a project?

If historical ordnance contamination remains unresolved, work often starts with aerial photograph analysis and document review. Where a reliable basis for suspicion already exists, the team assesses whether surface surveys, deep-ground or downhole surveys, excavation supervision or clearance fit the intervention. The first step therefore depends on project phase, available information and the decision required.

Clarification starts once the working area and likely interventions are known. Before tendering and execution, the investigation objective, scope, interfaces and documentation are defined.

How is a long corridor project divided for ordnance work?

Corridors are described by chainage, working width, intervention depth, crossings, structures and construction sections. Historical information, survey areas, borehole positions, findings and inaccessible zones share the same spatial reference. For each section, this identifies the status achieved and the further measure required.

What needs particular attention in industry and critical infrastructure?

Steel structures, reinforcement, utilities, foundations, technical installations and ongoing operations can restrict measurement and access. Operator requirements, system isolation, protective areas and reporting routes must also be considered. The service is therefore planned against operating status, intervention space and possible alternative measures; restricted areas are spatially identified in the report and conclusion.

What documents does FONTANA-EOD need for a sector-specific assessment?

Useful information includes the project address, site plan, construction area or route, borehole positions, type and depth of intervention, construction phases, schedule, utility and existing-structure drawings, historical assessments, authority correspondence, geotechnical documents, operator requirements and the documentation needed. Linear projects should identify chainage and working widths. Official information and conditions are supplied in full with appendices, date and geographical scope.

How is ordnance assessment included in a tender?

The specification describes the basis for suspicion, investigation or clearance area, depth, service objective, permitted methods or methods to be assessed, qualification requirements, interfaces, quality control and documentation to be delivered. Sector-specific details such as track possessions, operating requirements, access, concurrent trades and section handovers also form part of the task.

What role do KBD, KMBD or KRD have in the project?

In Germany, KBD, KMBD and KRD are regional names for public bodies or tasks in ordnance disposal. Their specific responsibilities depend on the federal state and circumstances. Private specialist services such as historical assessment, surveys, excavation supervision, clearance and documentation are commissioned separately and coordinated with local procedures.

If an unexpected suspicious item is found, work stops. Do not touch or move it. Leave the immediate area, warn others without putting yourself at risk and call the police in Germany on 110. Outside Germany, use the local emergency procedure. The competent authorities decide on further handling.

What determines the effort, duration and costs?

Key factors include site area or route length, number and depth of boreholes, project phase, basis for suspicion, access, surface, ground, utilities, interference, closure periods, operating conditions, required methods, data formats and documentation scope. A reliable cost estimate therefore needs clear references to location, intervention and sequence.

Prepare a sector-specific enquiry

Information for reliable project classification

A well-defined enquiry links project type and location to the actual ground intervention. Early designs are suitable too if the construction area, route or borehole locations can be defined traceably.

For multiple contract sections or subprojects, identify plan revisions and priorities clearly. Initial assessment can then distinguish investigations needed immediately, later construction sections and areas considered only as a precaution.

A brief account of the intended procurement and execution structure is helpful. It identifies whether project organisation needs shared overall documentation, separate contract-section reports or both.

Project management and controlling identify unresolved areas, necessary follow-up measures and critical decision dates separately. Ordnance-work status can thereby inform scheduling and cost planning without concealing technical uncertainty.

Project environment and participants

Identify the sector, client, operator, designers, site management and other relevant bodies. For industry, rail and critical infrastructure, involve those responsible for access and operations early.

Also state whether the project involves new construction, extension, refurbishment, demolition, maintenance or preparatory investigation.

Working areas and construction sequence

Site plans, construction areas, routes, chainage, borehole locations, excavations, assembly areas, intervention depths, phases and time windows form the technical basis.

Track possessions, traffic management, system isolation, concurrent trades, machinery and planned changes help integrate the service realistically into the sequence.

Suspected ordnance, existing information and documentation objective

Include aerial photograph assessments, authority correspondence, survey reports, anomaly maps, utility and existing-structure documents, geotechnical data and known finds.

State whether the result is needed for design, tendering, operator permission, site management, the project file, insurance or regional coordination.

For initial specialist assessment

An initial assessment usually needs the project address, site plan, project type, planned ground intervention, maximum depth, schedule and available information on suspected ordnance. FONTANA-EOD identifies the appropriate service area and documents still needed.

Large or multiphase projects can be divided by priority and construction section, enabling early decisions without making general assumptions about later areas.

A reliable quotation basis also defines required data formats, coordinate system, report recipients and handover dates. These details affect interpretation and documentation as well as fieldwork.

Project type

Rail, roads, utilities, energy, industry, local authorities, housing, environment or critical infrastructure.

Geometry

Construction area, route, chainage, borehole locations, excavations, working widths and depths.

Project conditions

Utilities, operations, closures, access, interference, phases and concurrent trades.

Required conclusion

Basis for design, procurement, site management, operators, insurance or the project file.

GPR on a construction site
Project enquiry

Have your project assessed

Whether historical aerial photograph analysis, explosive ordnance surveying, surface surveying using GPR, magnetometry or TDEM, deep-ground surveys, downhole surveys, excavation supervision, area clearance or ordnance recovery is needed depends on the location, ground disturbance, depth, ground and existing documents. An early ordnance assessment provides clarity for tendering, programming, occupational safety and construction.

FONTANA-EOD combines its Section 7 SprengG licence, specialists holding Section 20 SprengG certificates of competence, suitable survey and clearance methods, and traceable documentation. Send the site plan, depth of ground disturbance, construction phase and existing documents for an initial technical assessment.