Project pathway
The quickest route to the right decision.
In cable civil works and signalling installations, cable trenches, chambers, crossings and signal foundations differ in location, depth and access. FONTANA-EOD compares the ordnance evidence, cable alignments and installation points. Send the route drawing, point list and depths of ground disturbance so that investigation methods, construction stages and the required section records can be defined.
Define chainage, width and depth.
Locate chambers, signals and foundations.
Record unresolved areas and areas monitored during construction.
For cable civil works and signalling and train control, the available evidence of ordnance is compared with cable alignments, chambers, crossings and foundation points. Trench depth, bore path, existing utilities and proximity to tracks determine which volumes of ground need investigation and which methods are suitable. The records must clearly identify investigated sections and outstanding measures so that the next cable or signalling construction step can build on them.
The reference for track and cable civil works at DB Cologne junction lists surveying and monitoring during construction. The project reference concerns the ground disturbance described there. View project details.
Service areas:Ordnance specialist supervision of groundworksSurface surveys: GPR, TDEM and magnetometry
Cable civil works and signalling and train control combine long, narrow routes with deep chambers, crossings and numerous individual foundations. A uniform scope of services would not adequately represent these different working volumes.
Each working volume is assessed separately according to route width, depth, construction method, technical interference and the follow-up decision required.

Cable trenches often run alongside tracks, cable troughs or trackside paths and pass through open, paved and technically congested sections. The investigation is related to the alignment, working width, depth and actual construction sequence.
Known utilities and installations are considered both as information about existing conditions and as possible sources of survey interference.
Investigate the cable trench and route width
Chambers create locally deeper excavations and often require additional excavation support or dewatering areas. Their geometry is assessed separately from the shallower connecting corridor.
Relocated or additional chambers are not automatically covered by an existing investigation along the route.
Investigate chambers and depth volumes
Crossings connect launch and reception pits with a deeper bore or pipe path. Open-cut and trenchless construction have different access and investigation geometry requirements.
The entire working volume is therefore divided into near-surface pits, a corridor at depth and any additional areas.
Assess the crossing and bore path
Depending on their design, signals, axle counters, balises and other trackside installations require localised foundations, cable connections or assembly areas. The position and depth of planned ground disturbance may change during construction design.
Each point is recorded with its identifier, coordinates, foundation or installation geometry and associated cable route.
Select investigations for signalling points and foundations
Technical buildings combine excavations, foundation slabs, cable connections, earthing systems and ancillary areas. Explosive ordnance investigation must define these working volumes separately from the general railway corridor.
Existing foundations and utilities affect both survey feasibility and construction stages.
Assess technical and operating areas
Possession windows, excavation section by section and parallel signalling works can restrict a complete preliminary investigation. Open route sections are prioritised; remaining areas are assigned an agreed investigation step at a later stage.
Further investigation options are assessed for zones that cannot be adequately surveyed. Explosive ordnance surveying during construction is specified only where it is technically suitable for the planned ground disturbance.
Coordinate cable construction and excavation monitoringCable projects often change because of discoveries of existing installations, revised crossings, additional chambers or relocated signalling equipment. Each change is assessed for its effect on the documented investigation scope.
Early options are compared by alignment, working width, depth, crossings, chambers and existing installations. A historical ordnance assessment helps identify technically critical sections early.
Revised corridors are not carried over from an earlier option without a fresh spatial assessment.
Clarify ordnance evidence for route optionsService specifications and quantities must distinguish open trenches, chambers, crossings, individual foundations, depth investigations and remaining services during construction.
Data formats, chainage, quality control and the required section records are defined before the contract is awarded.
Define procurement and documentation requirementsInconsistent utility drawings, disused cables, earthing systems, foundations and earlier excavations affect survey feasibility and construction. The reliability of as-built information is checked before selecting methods.
Structures that cannot be conclusively classified receive their own technical follow-up decision.
Assess survey conditions and area survey methodsFor directional drilling and deep crossings, the launch and reception pits, bore path, design depth, diameter and working volume are considered together.
A near-surface assessment along the alignment covers the deep path only if the selected method and geometry demonstrably achieve this.
Investigate the crossing volume at depthSignal, balise, axle-counter or cabinet locations may change between design and construction. Each change is checked against existing point and area investigation records.
New or deeper foundations receive additional investigation where the previous scope is insufficient.
Check point records against drawing revisionsA survey anomaly, an object causing technical interference and an actual suspicious object are distinguished technically. If a suspicious object is encountered in a cable trench or chamber, work stops immediately. Leave the immediate area and contact the police without delay.
Further action depends on the findings, project location and regional responsibilities.
Define the findings and ordnance recovery procedureBefore selecting methods, the ordnance evidence, route drawing, depths of ground disturbance and survey conditions are reviewed. Site management needs to know which areas the eventual records will cover.
Linear routes and individual signalling installations share a common data structure but are assessed separately.
Initial situation: No reliable ordnance assessment is available for the planned route section.
Technical step: Historical sources and existing information are related to the alignment, chambers, crossings and individual installations.
Documentation objective: Prioritised investigation areas and identified data gaps for further design.
Establish the historical evidence for the routeInitial situation: An accessible corridor is to be opened within a defined width and depth.
Technical step: A suitable area survey method is selected according to the surface, ground, target object and interference.
Documentation objective: Survey and interference zones recorded with geographic coordinates and a clear follow-up decision.
Select an area investigation for the cable trenchInitial situation: Chambers, launch and reception pits or bore paths extend beyond the volume covered by an area survey.
Technical step: Point and depth volumes are incorporated into a separate investigation design, including design depth, excavation support and construction method.
Documentation objective: A depth assessment of the actual future working volume.
Investigate chambers and bore paths at depthInitial situation: Rails, cables, earthing systems, foundations or installations prevent a reliable preliminary investigation.
Technical step: Subareas that can be surveyed are investigated separately. For the remaining zones, access timing and the investigation method suitable for the planned ground disturbance are assessed.
Documentation objective: A spatially defined limitation with a specific follow-up task.
Choose suitable methods for remaining areasInitial situation: A signal, cabinet, axle counter or balise is relocated or given a different foundation.
Technical step: The new point, foundation and cable connection are checked against the previous drawing revision and investigation status.
Documentation objective: An updated point assessment without applying an unsuitable earlier geometry.
Relate the revised point to the existing recordsInitial situation: The route and trackside installations are constructed over several possessions and construction stages.
Technical step: Investigated corridors, chambers with an unresolved status and individual installations not yet assessed are combined in a status drawing.
Documentation objective: Clear handover to cable contractors, signalling contractors and site management.
Structure section status and handoversThe project file records cable routes, deep individual points and construction stages using the same coordinates and identifiers.
Conclusions are limited to the area, linear section and depth volume actually investigated.
The cable alignment, chainage, track, working width, chamber, crossing and signalling point share consistent spatial references. Drawing revisions and deviations in as-built positions are recorded so that changes remain traceable.
This allows later assessment of whether a revised construction section still lies within the documented survey or investigation geometry.
Historical assessments, official information, earlier finds, utility drawings, existing cables, structural data and previous survey reports are recorded with their sources and scope.
Contradictions or uncertain utility information remain identified as outstanding project issues.
Area survey corridors, survey-line profiles, borehole positions, chamber geometries and deep crossings are related to the future working volume.
Zones that could not be reached or where data could not be interpreted are identified separately and assigned a follow-up measure.
Track superstructure, ballast, surfaces, ground conditions, existing cables, earthing systems, signals, foundations, access and possession windows are documented for each section.
This information explains why a method is reliable in one area and has only limited applicability in another.
Survey anomalies, objects causing technical interference, exposure work and actual findings are recorded separately. Each relevant change to the alignment, depth or signalling point is documented and checked against the previous investigation status.
Outstanding points remain identified with their status and responsibilities.
The report links the drawing revision, investigated corridors, chambers, individual installations, methods, results, limitations and next measures.
Where there are several work packages or possessions, an overall status summary can bring together the individual specialist reports.
Cable and signalling projects are often delivered through several work packages, possessions and installation sections. The project file contains the ordnance evidence used, investigations carried out and results of individual handovers.
Each document is clearly linked to an alignment, point, depth, drawing revision and decision.
Historical assessments, cable and utility drawings, ground investigation data, signalling designs, point lists and earlier reports are recorded with dates and drawing revisions.
Only information relevant in both spatial and technical scope is applied to the current construction section.
Cable alignments, chambers, crossings, signals, axle counters, balises and technical sites receive unique identifiers.
The common structure links linear and localised ground disturbances without conflating their different investigation geometries.
Raw data, profiles, grids, borehole positions, investigation depths and interference zones are filed by section and method.
The data structure allows the results to be checked later if cable routes or signalling locations change.
Monitored trench layers, chamber excavations, equipment, interruptions, observations and deviations are documented continuously.
Material movements and changes between sections remain traceable so that the conclusions can be assigned to the actual volume of ground.
Anomalies, exposure work, outstanding points and follow-up measures are recorded with their position, depth, status and responsibilities.
This allows designers and site management to identify which measures must be completed before cable pulling or installation.
Reports, status drawings, data registers and unresolved remaining areas are handed over as a consistent set.
Later design changes are checked against the documented corridor and point status.
The sequence follows the actual progression from design through earthworks, cable construction and installation. Before the relevant earthworks, existing records are checked to establish whether they cover the proposed working area.
Clear drawings, prepared survey geometry and agreed data transfer procedures support work within short possession windows.
Cable alignments, chambers, crossings, signals, technical sites, working widths, depths and construction stages are taken from the current drawing revision.
For each area, the assessment required before the next work step is defined.
Historical assessments, utility drawings, ground investigation data, point lists and existing survey reports are checked for spatial consistency.
Missing or contradictory information is clarified before fieldwork or documented as an outstanding prerequisite.
Open trenches, deep crossings, chambers, signal foundations and technical areas each have their own investigation geometry.
Each task can then be linked to a suitable method and supporting records.
The surface, ground, existing cables, rails, earthing systems, foundations, access and depth determine the methods.
Suitable additional investigations are planned for areas that cannot be adequately surveyed. Whether a depth investigation or explosive ordnance surveying during construction is suitable depends on the specific ground disturbance and investigation conditions.
Alignments, points, chainage, construction sections, possession windows and responsibilities are checked together before site work.
Drawing revisions are incorporated into survey and point lists before the affected work begins.
Area surveys, survey-line profiles, depth investigations and excavation monitoring follow the defined geometry.
Deviations, inaccessible zones and newly identified existing conditions are recorded immediately.
Survey data, known installations, exposure work and field observations are checked for consistency with the evidence of ordnance and construction geometry.
A technically justified follow-up decision is made for each unresolved section or point.
The report, status drawing, data, limitations and next measures are prepared for cable contractors, signalling contractors, site management and the client.
New alignments, chambers or points are checked against the documented investigation scope.
Cable civil works combine continuous corridors with locally deeper excavations and numerous individual installations. Explosive ordnance investigation must assess these geometries separately while maintaining connected data.
Chainage, coordinates, width, depth, construction method and drawing revision provide the basis for surveys, depth investigation, excavation monitoring and handover.
Conditions are not uniform along a cable trench. Track superstructure, trackside paths, crossings, chambers, structures and existing cables can change survey feasibility and the working volume from one section to the next.
Deep crossings are assessed beyond the launch and reception pits. The bore path itself must be evaluated by position, depth and achievable investigation geometry. If a method is insufficient there, further investigation options and, where necessary, changes to the construction design must be assessed. Monitoring excavation in the launch and reception pits does not provide investigation records for the deeper bore path.
Signalling points are managed through point lists and drawing revisions. Even small relocations can change the investigated depth volume. Planned and as-built positions and the future foundation geometry are therefore brought together in documented records.
The handover to cable and signalling contractors shows which corridors, chambers and points have been investigated, which limitations remain and which measures are still needed before the next work step.
The investigation geometry covers the actual trench, equipment and working volume, rather than just the planned centre line.
Curves, enlargements, entries and local widening are shown separately on the drawing.
Jointing, cable and drainage chambers create deeper excavations than the connecting corridor.
The chamber outline, excavation support, slope and design depth are assessed as a separate working volume.
The launch and reception pits, bore path, diameter, depth and drilling method form a connected investigation task with differing access conditions.
The near-surface assessment of the pits is not automatically extended to the deep corridor.
Signals, axle counters, balises, cabinets and other trackside installations receive a point identifier, coordinates, foundation or installation geometry and the associated cable connection.
Relocated points are checked again for investigation coverage.
Known utilities, earthing systems, cable troughs, rails and foundations are considered in survey design and interpretation.
Strong interference leads to a spatially limited assessment and suitable additional investigation, rather than a general conclusion.
If an alignment, chamber, crossing or signalling point changes, the new working volume is compared with the documented survey and depth coverage.
Handovers between civil engineering, cable and signalling contractors use the same status and identifier references.

For cable trenches, protective ducts, chambers, crossings, signal foundations and signal box connections, the available ordnance assessment and investigation documents are first reviewed. This establishes the further investigation needed for the affected volumes of ground.
Relate documents to the route drawing
Investigation requirements depend on route width, trench depth, individual installations, bore paths, existing cables, proximity to tracks and which sections can be reliably surveyed in advance.
Select methods for the specific route volumeThe methods respond to different physical properties and have their own spatial investigation ranges.
Combining methods is useful where each answers a clearly defined question about the cable trench, chamber, crossing or signalling point.
Assesses whether historical evidence indicates possible ordnance and which route sections are affected.
It does not detect objects present today and does not replace technical investigation of the future cable or point working volume.
Responds to ferromagnetic objects and can be used in suitable accessible areas.
Rails, cables, earthing systems and metal installations can strongly influence the magnetic environment.
Records time-dependent electromagnetic responses from conductive objects and can provide additional information in certain corridors.
The target object, depth, ground conditions and technical infrastructure determine suitability.
Shows reflections at material and structural boundaries and can add information about utilities and layers on suitable paved surfaces.
A reflection does not automatically identify ordnance; knowledge of existing installations and data quality remain essential.
Investigates defined depth volumes for chambers, signal foundations, crossings and other deep localised ground disturbances.
The conclusions apply only to the defined point or corridor geometry.
In suitable excavation areas, each working layer is surveyed and assessed by a specialist. Controlled excavation in layers and an additional visual inspection follow. These steps are repeated to the agreed base of excavation; simply watching the excavator is insufficient.
It requires clearly defined excavation layers, stop points, responsibilities and section-specific documentation.
FONTANA-EOD documents the investigations carried out for each cable section and individual installation. Cable contractors, signalling contractors and site management receive information on results, unresolved areas and the drawings used.
At the outset, the decision required is clarified: comparing design options, tendering, preparing a trench, assessing a crossing or handing over individual signalling points.
The method is selected according to the target object, depth, ground, surface, technical interference and access. Rails and existing cables are not treated as automatic reasons to rule out a method; they are included in a realistic suitability assessment.
During construction, revised alignments, new chambers and relocated individual installations are recorded immediately. This keeps investigation aligned with the actual construction and installation geometry.
Anomalies are assessed for consistency with their location, data quality, depth reference and known existing installations. Survey anomalies, objects causing technical interference and actual finds remain clearly distinguished in communication.
The handover describes the results together with survey limitations, unresolved sections and measures required before the next civil engineering or signalling step.
Linear cable alignments and individual signalling installations are planned together but assessed using their own investigation geometry.
Cables, earthing systems, rails, foundations and technical installations are considered both as sources of information and possible interference.
New alignments, chambers and point positions are checked against survey areas, borehole positions and documented depths.
Survey and excavation conditions are documented for each route section rather than generalised across the entire work package.
Inaccessible zones and those affected by technical interference are assigned a specific follow-up measure and responsibility.
Reports and drawings show which corridors and points have been resolved before the next installation or earthworks step.
For cable corridors, individual foundations and areas that become accessible later, the suitability of surface surveys, depth investigation or explosive ordnance surveying during construction is assessed separately.
The records must show the alignment, chainage, depth, investigation status and outstanding follow-up measures so that designers and site management can clearly relate them to the next signalling or cable construction step.
Cable civil works and signalling bring together clients, operators, design disciplines, contractors, specialist firms and public authorities. Before work begins, responsibilities are agreed for reporting design changes, commissioning investigations and passing results to subsequent contractors.
Each role receives the information needed for its own decision; technical assessment, operational authorisation and official handling of finds remain distinct.
Define project objectives, route sections, signalling scope, drawing revisions, dates and required records. They bring together available drawings, as-built information and ordnance evidence, and commission the specialist services required for each construction section.
Across several work packages, they ensure consistent chainage references, data formats and handover rules.
Translates the project into cable alignments, chambers, crossings, signal positions, foundation geometries and construction stages. It incorporates explosive ordnance investigation into the design and bill of quantities.
Design changes are passed to the relevant specialists before the affected ground disturbance.
Set access requirements, possessions, protection zones and operating conditions around the track and installations.
Operational work authorisation and the specialist explosive ordnance assessment remain separate decisions with different prerequisites.
Construct trenches, chambers, crossings, individual foundations and assembly areas in accordance with the agreed drawing revision. Deviations in position, depth or construction method are reported before work continues.
If an unexpected suspicious object is encountered, they stop work immediately, leave it untouched and leave the immediate area. In Germany, they contact the police without delay; outside Germany, the local emergency reporting procedure applies.
Reviews the ordnance evidence and design information, develops the commissioned approach, carries out specialist services and documents results and the limits of the assessment.
The assessment remains related to the agreed corridors, points and depth volumes.
In Germany, the ordnance disposal services of the federal states and the locally competent authorities carry out hazard-response and find-management duties. Their involvement is established for the project location; outside Germany, local responsibilities apply.
If a suspicious object is encountered, the police are contacted immediately. Internal project reporting follows afterwards. Further measures follow the instructions of the competent authorities at the project location.
The local public order authority and building control may be involved, depending on local procedures and the construction task. Contacts and requirements are assigned to the specific section and drawing revision. Technical investigation, operational work authorisation and official decisions about finds remain documented with their respective responsibilities.
Requirements depend on the activity, project location, construction stage and operating environment. The service specification, qualifications, risk assessment and documentation must relate to the specific commission.
Operational and electrical requirements supplement the technical framework but do not replace a clearly defined scope of explosive ordnance services.
In Germany, § 7 SprengG concerns the commercial authorisation for activities requiring authorisation; § 20 SprengG concerns the certificate of competence of responsible persons. Under § 1b SprengG, searching for found munitions also counts as handling them. The requirements applicable to the project depend on the activity actually commissioned.
DGUV Information 201-027 supports risk assessment and protective measures for ordnance clearance work. The Baufachliche Richtlinien Kampfmittelräumung set requirements for investigation, clearance concepts, quality and documentation within their defined scope of federal responsibilities. Their application to the specific cable and signalling project is clarified separately.
The cable and signalling environment adds proximity to tracks, electrical installations, existing routes, construction stages and railway safety arrangements. These constraints are coordinated with surveying, civil engineering and installation.
If a suspicious object is found, stop work in the affected area immediately. Do not touch or move the object, leave the danger area and keep others away without putting yourself at risk. In Germany, notify the police immediately on 110; outside Germany, use the local emergency reporting procedure. Then inform site management.
The First Ordinance to the German Explosives Act (1. SprengV) includes requirements for specialist competence and state-recognised training courses. For cable routes and signalling points, the qualifications of the responsible personnel are matched to the actual commissioned scope of work.
DGUV Rule 113-003 concerns the dismantling or destruction of explosives or corresponding objects and also includes the disposal of found munitions. It applies according to this field of activity; it does not replace a risk assessment specific to the planned ground intervention.
The company, responsible personnel and specific scope of work must meet the applicable requirements of explosives legislation.
Proximity to tracks, cable installations, electrical equipment, earthworks, machinery, protection zones and communication procedures are considered together for the specific project.
Corridors, individual installations, depths, methods, alternative measures, data formats and acceptance requirements are clearly specified before construction.
Site management, the operator, railway safety personnel and competent authorities follow an agreed procedure for anomalies and finds.
The route drawing, point list, construction stages, as-built data, qualification requirements and required records are defined so that tenders can be compared on a technical basis.
Provisional items have a clear technical trigger.
Alignments, chambers, crossings, individual installations, access, railway safety arrangements and contacts are checked against the applicable drawings and operating conditions.
Last-minute changes are incorporated into the scope of work.
Work stops immediately. Do not touch or move the object, leave the danger area and keep others away without putting yourself at risk. In Germany, notify the police immediately on 110; outside Germany, use the local emergency reporting procedure.
Further action follows the instructions of the competent authority.
The route drawing, point list, survey data, chamber and crossing geometry and investigation status must use the same chainage references and drawing revision. This gives cable contractors, signalling installers and site management a clear basis for action even when drawings change.
For long cable programmes, the main route, branches, chambers, crossings and individual installations are recorded in a shared, updated overview. This shows which sections have already been investigated, which design changes require additional work and which documents are needed before civil engineering or installation.

The drawing links route width, depths, chambers, signals and investigation status. Revisions and identifiers keep changes traceable.
Have the route and point drawing reviewed
The available evidence and data gaps determine which sections need more detailed technical investigation.
Clarify ordnance evidence along the cable route
For chambers, bore paths and foundations, the depth investigation records needed for the specific ground disturbance must be established. Area surveys are used only within their documented scope.
Investigate chambers and crossings at depth
Excavation layers, stop points and investigated corridors are documented continuously.
Plan excavation monitoring for cable sections
The original route or point reference is retained through to further investigation or action. Responsibilities and handovers are documented so that they remain traceable.
Assess findings and ordnance recovery procedures
The documentation supports procurement, site management, cable contractors and signalling contractors when drawings are revised later.
Structure data handover and the project file


Coordinate track construction, railway power and civil engineering structures with their respective working volumes and construction stages.
Assess the railway project in its overall context
Clarify historical evidence and data gaps before comparing design options, tendering or technical surveying.
Assess the historical evidence for the route
Relate deep chambers, bore paths and signalling points to the future ground-disturbance geometry.
Investigate deep corridors and points
Assess whether explosive ordnance surveying during construction is technically suitable for the remaining trench and chamber areas.
Prepare excavation monitoring for cable works
Coordinate service specifications, data structure, status drawings, point lists and handovers across several work packages and possessions.
Define procurement and data handover
Identify the project location, federal state and local interfaces for coordination and possible finds.
Clarify regional responsibilities
Treat deep crossings, launch and reception pits and open transition areas as separate investigation geometries.
Investigate crossings and bore paths
Define the technical scope for mast, signal and equipment foundations, their cable connections and deep point investigations.
Assess railway power and signalling points
Provide the railway line, track and chainage together with the cable alignment. Chambers, crossings and signal positions need their own identifiers. If several drawing revisions exist, identify the position and depth intended for construction; this is essential for assigning existing investigation results to the correct section.
The location of existing cables affects the working volume and survey conditions. An explosive ordnance report does not replace utility information or coordination of construction with those responsible for the installation. Both sets of documents must be brought together using the applicable drawing revision.
Distinguish the specialist tasksFor a crossing, assess the planned bore path and depths affected as well as the launch and reception points. Investigation of an open cable trench cannot be applied to a deeper crossing without technical assessment.
Check route-specific recordsTechnical information
The brochure shows how FONTANA-EOD combines historical investigation, specialist planning, surveying and construction supervision in infrastructure projects. It explains trackside constraints, method selection and limitations, and result documentation.

Technical assessment should begin as soon as cable alignments, chambers, crossings, signal foundations, signal box connections and construction stages are sufficiently defined. Early design stages can start with assessment of the historical evidence of ordnance. Before tendering and construction, route width, depth of ground disturbance, individual foundations and inaccessible areas must be addressed through suitable investigation or a clear follow-up measure.
Cable trenches, cable ducts, protective pipes, jointing and cable chambers, crossings, signals, axle counters, balise locations, switching buildings, earthing systems and temporary excavations must be considered. Each component has its own position and depth geometry. A general route assessment therefore replaces neither point-specific foundation investigation nor section-specific assessment of deep crossings.
Existing cables, cable troughs, rails, earthing systems, signals, masts, foundations and metal installations are recorded before method selection. They can obscure survey data while also providing useful comparison information. Sections that cannot be adequately surveyed are marked on the drawing. The assessment establishes when they become accessible and which additional investigation suits the planned ground disturbance.
This depends on trench depth, working width, ground conditions, surface, target object and interference. A suitable surface method may be sufficient for shallow, accessible sections. Deep crossings, chambers, signal foundations or areas outside the demonstrated investigation zone require their own point or depth investigation.
The launch and reception pits, bore path, design depth, diameter, drilling method and safety volume are considered as connected investigation areas with differing access conditions. Pits accessible from the surface may need different methods from the deep bore corridor. An assessment of the launch pit is not automatically extended to the entire underground path.
Explosive ordnance surveying during construction is considered where technically suitable for the planned ground disturbance. This may apply to trenches that become accessible only after demolition or cannot be adequately investigated beforehand because of existing cables, ballast, foundations or operational restrictions. Each working layer is surveyed and assessed by a specialist. Controlled excavation in layers and an additional visual inspection follow; these steps are repeated to the agreed base of excavation. Excavation layers, equipment use, stop points, responsibilities and reporting procedures are agreed before work begins. The conclusions remain limited to the working volume actually investigated.
If an unexpected suspicious object is found, stop work. Do not touch, move or uncover it further. Leave the immediate area and warn others without putting yourself at risk. In Germany, notify the police on 110; outside Germany, use the local emergency reporting procedure. The competent authorities determine what happens next; a project enquiry does not replace reporting the find.
The documentation should bring together the alignment, chainage, working width, depth, chambers, crossings, individual foundations, methods used, survey and field conditions, findings, limitations and follow-up decisions. Changes to the cable route or signalling locations are checked against the documented investigation scope and recorded as a drawing revision.
Official information and requirements are included with complete appendices, dates and spatial scope. In Germany, the relevant ordnance disposal service, local public order authority and, where applicable, building control are identified for the project location; operational work authorisations remain separate processes. Outside Germany, coordination is with the authorities responsible locally.
Key factors are route length, the number of chambers and crossings, trench depth, individual foundations, access, possession windows, existing cables, track superstructure, methods required, data formats and documentation requirements. Additional depth investigations, repeat surveys or services during construction are considered separately where they fall outside the original scope.
An initial enquiry does not need to contain a complete bill of quantities. The essential requirement is a clear spatial description of linear corridors, deep individual points and construction stages.
Where there are several work packages or possessions, provide priorities, drawing revisions and required handover dates.
Provide the railway line, track, chainage, cable alignments, working widths, chambers, crossings and signalling point lists with the current drawing revision.
Signal locations, technical areas and revised as-built positions should be clearly marked.
Describe open trenches, protective pipes, chambers, excavation support, bore paths, individual foundations and maximum depths.
Possession windows, access, parallel trades and the date when a decision is needed affect the method and site planning.
Include aerial photograph assessments, official correspondence, existing cable, earthing and structural drawings, ground investigation data and previous survey or clearance reports.
Incomplete utility information is also relevant because it affects survey feasibility and work preparation.
For an initial comparison, a route drawing, point list, short description of trench and chamber construction, maximum depths, planned dates and existing ordnance evidence are often sufficient.
FONTANA-EOD uses these documents to assess the investigations needed and identify missing information. For extensive signalling programmes, the work can be divided by corridor, point group and construction stage.
Railway line, track, chainage, cable alignment, chamber, crossing and drawing revision.
Working width, trench depth, excavation support, bore path, foundation and point coordinates.
Possession windows, access, civil engineering sequence, cable pulling, signalling installation and handover dates.
Documents for design, procurement, site management, cable construction, signalling construction or the project file.
Whether historical aerial photograph analysis, explosive ordnance surveying, surface surveying using GPR, magnetometry or TDEM, deep-ground surveys, downhole surveys, excavation supervision, area clearance or ordnance recovery is needed depends on the location, ground disturbance, depth, ground and existing documents. An early ordnance assessment provides clarity for tendering, programming, occupational safety and construction.
FONTANA-EOD combines its Section 7 SprengG licence, specialists holding Section 20 SprengG certificates of competence, suitable survey and clearance methods, and traceable documentation. Send the site plan, depth of ground disturbance, construction phase and existing documents for an initial technical assessment.