Explosive ordnance assessment for cable trenching and signalling systems

In cable civil works and signalling installations, cable trenches, chambers, crossings and signal foundations differ in location, depth and access. FONTANA-EOD compares the ordnance evidence, cable alignments and installation points. Send the route drawing, point list and depths of ground disturbance so that investigation methods, construction stages and the required section records can be defined.

Clarify the cable alignment

Define chainage, width and depth.

Identify individual installations

Locate chambers, signals and foundations.

Document construction progress

Record unresolved areas and areas monitored during construction.

Other railway and route projects

Before cable civil works and signalling works

Clarify investigation requirements for the cable route and signalling installations

For cable civil works and signalling and train control, the available evidence of ordnance is compared with cable alignments, chambers, crossings and foundation points. Trench depth, bore path, existing utilities and proximity to tracks determine which volumes of ground need investigation and which methods are suitable. The records must clearly identify investigated sections and outstanding measures so that the next cable or signalling construction step can build on them.

Project references

Selected project examples

Plan linear and localised ground disturbances separately

Which subareas need their own explosive ordnance investigation

Cable civil works and signalling and train control combine long, narrow routes with deep chambers, crossings and numerous individual foundations. A uniform scope of services would not adequately represent these different working volumes.

Each working volume is assessed separately according to route width, depth, construction method, technical interference and the follow-up decision required.

Survey trolley on an undeveloped construction site, with soil piles and a row of trees in the background.

Longitudinal cable trenches

Cable trenches often run alongside tracks, cable troughs or trackside paths and pass through open, paved and technically congested sections. The investigation is related to the alignment, working width, depth and actual construction sequence.

Known utilities and installations are considered both as information about existing conditions and as possible sources of survey interference.

Investigate the cable trench and route width
Person beside a survey instrument on a construction site; a wheeled excavator with drilling equipment stands behind them.

Jointing, cable and drainage chambers

Chambers create locally deeper excavations and often require additional excavation support or dewatering areas. Their geometry is assessed separately from the shallower connecting corridor.

Relocated or additional chambers are not automatically covered by an existing investigation along the route.

Investigate chambers and depth volumes
Person with a tablet beside an open cable duct along a railway.

Railway and utility crossings

Crossings connect launch and reception pits with a deeper bore or pipe path. Open-cut and trenchless construction have different access and investigation geometry requirements.

The entire working volume is therefore divided into near-surface pits, a corridor at depth and any additional areas.

Assess the crossing and bore path
Two people with a tablet beside a marked construction area; plans lie in the foreground.

Signals, axle counters and balises

Depending on their design, signals, axle counters, balises and other trackside installations require localised foundations, cable connections or assembly areas. The position and depth of planned ground disturbance may change during construction design.

Each point is recorded with its identifier, coordinates, foundation or installation geometry and associated cable route.

Select investigations for signalling points and foundations
Person with a tablet beside an open cable duct along a railway.

Signal boxes, switching buildings and technical sites

Technical buildings combine excavations, foundation slabs, cable connections, earthing systems and ancillary areas. Explosive ordnance investigation must define these working volumes separately from the general railway corridor.

Existing foundations and utilities affect both survey feasibility and construction stages.

Assess technical and operating areas
Person with a tablet beside an open cable duct along a railway.

Cable construction during ongoing railway operations

Possession windows, excavation section by section and parallel signalling works can restrict a complete preliminary investigation. Open route sections are prioritised; remaining areas are assigned an agreed investigation step at a later stage.

Further investigation options are assessed for zones that cannot be adequately surveyed. Explosive ordnance surveying during construction is specified only where it is technically suitable for the planned ground disturbance.

Coordinate cable construction and excavation monitoring
Changes to the route, depth and signalling locations

When the route, depth or construction stage requires an additional technical decision

Cable projects often change because of discoveries of existing installations, revised crossings, additional chambers or relocated signalling equipment. Each change is assessed for its effect on the documented investigation scope.

Route design and comparison of options

Early options are compared by alignment, working width, depth, crossings, chambers and existing installations. A historical ordnance assessment helps identify technically critical sections early.

Revised corridors are not carried over from an earlier option without a fresh spatial assessment.

Clarify ordnance evidence for route options

Tendering for cable civil works

Service specifications and quantities must distinguish open trenches, chambers, crossings, individual foundations, depth investigations and remaining services during construction.

Data formats, chainage, quality control and the required section records are defined before the contract is awarded.

Define procurement and documentation requirements

Existing cables and unidentified installations

Inconsistent utility drawings, disused cables, earthing systems, foundations and earlier excavations affect survey feasibility and construction. The reliability of as-built information is checked before selecting methods.

Structures that cannot be conclusively classified receive their own technical follow-up decision.

Assess survey conditions and area survey methods

Deep crossing or bore path

For directional drilling and deep crossings, the launch and reception pits, bore path, design depth, diameter and working volume are considered together.

A near-surface assessment along the alignment covers the deep path only if the selected method and geometry demonstrably achieve this.

Investigate the crossing volume at depth

Revised signalling points

Signal, balise, axle-counter or cabinet locations may change between design and construction. Each change is checked against existing point and area investigation records.

New or deeper foundations receive additional investigation where the previous scope is insufficient.

Check point records against drawing revisions

An anomaly in a trench or chamber

A survey anomaly, an object causing technical interference and an actual suspicious object are distinguished technically. If a suspicious object is encountered in a cable trench or chamber, work stops immediately. Leave the immediate area and contact the police without delay.

Further action depends on the findings, project location and regional responsibilities.

Define the findings and ordnance recovery procedure
Coordinate the cable corridor, chambers and individual installations

Which investigation is needed for the cable section

Before selecting methods, the ordnance evidence, route drawing, depths of ground disturbance and survey conditions are reviewed. Site management needs to know which areas the eventual records will cover.

Linear routes and individual signalling installations share a common data structure but are assessed separately.

Cable corridor with unresolved historical ordnance evidence

Initial situation: No reliable ordnance assessment is available for the planned route section.

Technical step: Historical sources and existing information are related to the alignment, chambers, crossings and individual installations.

Documentation objective: Prioritised investigation areas and identified data gaps for further design.

Establish the historical evidence for the route

Open, near-surface cable trench

Initial situation: An accessible corridor is to be opened within a defined width and depth.

Technical step: A suitable area survey method is selected according to the surface, ground, target object and interference.

Documentation objective: Survey and interference zones recorded with geographic coordinates and a clear follow-up decision.

Select an area investigation for the cable trench

Deep chamber or crossing geometry

Initial situation: Chambers, launch and reception pits or bore paths extend beyond the volume covered by an area survey.

Technical step: Point and depth volumes are incorporated into a separate investigation design, including design depth, excavation support and construction method.

Documentation objective: A depth assessment of the actual future working volume.

Investigate chambers and bore paths at depth

Section with extensive technical interference

Initial situation: Rails, cables, earthing systems, foundations or installations prevent a reliable preliminary investigation.

Technical step: Subareas that can be surveyed are investigated separately. For the remaining zones, access timing and the investigation method suitable for the planned ground disturbance are assessed.

Documentation objective: A spatially defined limitation with a specific follow-up task.

Choose suitable methods for remaining areas

Signalling point with a revised location

Initial situation: A signal, cabinet, axle counter or balise is relocated or given a different foundation.

Technical step: The new point, foundation and cable connection are checked against the previous drawing revision and investigation status.

Documentation objective: An updated point assessment without applying an unsuitable earlier geometry.

Relate the revised point to the existing records

Section-by-section handover to cable and signalling contractors

Initial situation: The route and trackside installations are constructed over several possessions and construction stages.

Technical step: Investigated corridors, chambers with an unresolved status and individual installations not yet assessed are combined in a status drawing.

Documentation objective: Clear handover to cable contractors, signalling contractors and site management.

Structure section status and handovers
Document investigated cable sections and points

Which documents designers, site management and technical contractors need to share

The project file records cable routes, deep individual points and construction stages using the same coordinates and identifiers.

Conclusions are limited to the area, linear section and depth volume actually investigated.

Route and chainage references

The cable alignment, chainage, track, working width, chamber, crossing and signalling point share consistent spatial references. Drawing revisions and deviations in as-built positions are recorded so that changes remain traceable.

This allows later assessment of whether a revised construction section still lies within the documented survey or investigation geometry.

Ordnance evidence and as-built information

Historical assessments, official information, earlier finds, utility drawings, existing cables, structural data and previous survey reports are recorded with their sources and scope.

Contradictions or uncertain utility information remain identified as outstanding project issues.

Survey areas, lines and deep investigation points

Area survey corridors, survey-line profiles, borehole positions, chamber geometries and deep crossings are related to the future working volume.

Zones that could not be reached or where data could not be interpreted are identified separately and assigned a follow-up measure.

Construction and operating conditions

Track superstructure, ballast, surfaces, ground conditions, existing cables, earthing systems, signals, foundations, access and possession windows are documented for each section.

This information explains why a method is reliable in one area and has only limited applicability in another.

Anomalies, findings and design changes

Survey anomalies, objects causing technical interference, exposure work and actual findings are recorded separately. Each relevant change to the alignment, depth or signalling point is documented and checked against the previous investigation status.

Outstanding points remain identified with their status and responsibilities.

Section report and data handover

The report links the drawing revision, investigated corridors, chambers, individual installations, methods, results, limitations and next measures.

Where there are several work packages or possessions, an overall status summary can bring together the individual specialist reports.

Keep cable route and signalling point records up to date

File drawings, survey data and reports for each section

Cable and signalling projects are often delivered through several work packages, possessions and installation sections. The project file contains the ordnance evidence used, investigations carried out and results of individual handovers.

Each document is clearly linked to an alignment, point, depth, drawing revision and decision.

Source and drawing register

Historical assessments, cable and utility drawings, ground investigation data, signalling designs, point lists and earlier reports are recorded with dates and drawing revisions.

Only information relevant in both spatial and technical scope is applied to the current construction section.

Route and point register

Cable alignments, chambers, crossings, signals, axle counters, balises and technical sites receive unique identifiers.

The common structure links linear and localised ground disturbances without conflating their different investigation geometries.

Survey and depth data

Raw data, profiles, grids, borehole positions, investigation depths and interference zones are filed by section and method.

The data structure allows the results to be checked later if cable routes or signalling locations change.

Field and excavation logs

Monitored trench layers, chamber excavations, equipment, interruptions, observations and deviations are documented continuously.

Material movements and changes between sections remain traceable so that the conclusions can be assigned to the actual volume of ground.

Findings and action status

Anomalies, exposure work, outstanding points and follow-up measures are recorded with their position, depth, status and responsibilities.

This allows designers and site management to identify which measures must be completed before cable pulling or installation.

Handover file for cable and signalling contractors

Reports, status drawings, data registers and unresolved remaining areas are handed over as a consistent set.

Later design changes are checked against the documented corridor and point status.

Plan investigation before civil engineering and installation

Investigate cable routes, chambers and foundations step by step

The sequence follows the actual progression from design through earthworks, cable construction and installation. Before the relevant earthworks, existing records are checked to establish whether they cover the proposed working area.

Clear drawings, prepared survey geometry and agreed data transfer procedures support work within short possession windows.

01

Establish the project brief and route volume

Cable alignments, chambers, crossings, signals, technical sites, working widths, depths and construction stages are taken from the current drawing revision.

For each area, the assessment required before the next work step is defined.

02

Review records and the suspected hazard

Historical assessments, utility drawings, ground investigation data, point lists and existing survey reports are checked for spatial consistency.

Missing or contradictory information is clarified before fieldwork or documented as an outstanding prerequisite.

03

Distinguish corridors from individual installations

Open trenches, deep crossings, chambers, signal foundations and technical areas each have their own investigation geometry.

Each task can then be linked to a suitable method and supporting records.

04

Determine methods and alternative measures

The surface, ground, existing cables, rails, earthing systems, foundations, access and depth determine the methods.

Suitable additional investigations are planned for areas that cannot be adequately surveyed. Whether a depth investigation or explosive ordnance surveying during construction is suitable depends on the specific ground disturbance and investigation conditions.

05

Coordinate surveying and construction stages

Alignments, points, chainage, construction sections, possession windows and responsibilities are checked together before site work.

Drawing revisions are incorporated into survey and point lists before the affected work begins.

06

Carry out surveying and services during construction

Area surveys, survey-line profiles, depth investigations and excavation monitoring follow the defined geometry.

Deviations, inaccessible zones and newly identified existing conditions are recorded immediately.

07

Assess data, objects causing interference and findings

Survey data, known installations, exposure work and field observations are checked for consistency with the evidence of ordnance and construction geometry.

A technically justified follow-up decision is made for each unresolved section or point.

08

Hand over the section and record design changes

The report, status drawing, data, limitations and next measures are prepared for cable contractors, signalling contractors, site management and the client.

New alignments, chambers or points are checked against the documented investigation scope.

Distinguish linear routes, chambers and individual installations

Define investigation areas on the cable and signalling drawings

Cable civil works combine continuous corridors with locally deeper excavations and numerous individual installations. Explosive ordnance investigation must assess these geometries separately while maintaining connected data.

Chainage, coordinates, width, depth, construction method and drawing revision provide the basis for surveys, depth investigation, excavation monitoring and handover.

Assess cable routes, chambers and signalling points separately

Conditions are not uniform along a cable trench. Track superstructure, trackside paths, crossings, chambers, structures and existing cables can change survey feasibility and the working volume from one section to the next.

Deep crossings are assessed beyond the launch and reception pits. The bore path itself must be evaluated by position, depth and achievable investigation geometry. If a method is insufficient there, further investigation options and, where necessary, changes to the construction design must be assessed. Monitoring excavation in the launch and reception pits does not provide investigation records for the deeper bore path.

Signalling points are managed through point lists and drawing revisions. Even small relocations can change the investigated depth volume. Planned and as-built positions and the future foundation geometry are therefore brought together in documented records.

The handover to cable and signalling contractors shows which corridors, chambers and points have been investigated, which limitations remain and which measures are still needed before the next work step.

Cable alignment and working width

The investigation geometry covers the actual trench, equipment and working volume, rather than just the planned centre line.

Curves, enlargements, entries and local widening are shown separately on the drawing.

Chambers and locally deeper excavations

Jointing, cable and drainage chambers create deeper excavations than the connecting corridor.

The chamber outline, excavation support, slope and design depth are assessed as a separate working volume.

Crossing and bore path

The launch and reception pits, bore path, diameter, depth and drilling method form a connected investigation task with differing access conditions.

The near-surface assessment of the pits is not automatically extended to the deep corridor.

Signal and control points

Signals, axle counters, balises, cabinets and other trackside installations receive a point identifier, coordinates, foundation or installation geometry and the associated cable connection.

Relocated points are checked again for investigation coverage.

Existing cables and interference

Known utilities, earthing systems, cable troughs, rails and foundations are considered in survey design and interpretation.

Strong interference leads to a spatially limited assessment and suitable additional investigation, rather than a general conclusion.

Drawing revision and work-package handover

If an alignment, chamber, crossing or signalling point changes, the new working volume is compared with the documented survey and depth coverage.

Handovers between civil engineering, cable and signalling contractors use the same status and identifier references.

Select an investigation

Investigate the cable route and installation points separately

Two people discussing plans at a table beside a vehicle on a construction site.

Check the ordnance evidence against the route drawing

For cable trenches, protective ducts, chambers, crossings, signal foundations and signal box connections, the available ordnance assessment and investigation documents are first reviewed. This establishes the further investigation needed for the affected volumes of ground.

Relate documents to the route drawing
Two people with a tablet beside a marked construction area; plans lie in the foreground.

Establish widths, depths and obstructions

Investigation requirements depend on route width, trench depth, individual installations, bore paths, existing cables, proximity to tracks and which sections can be reliably surveyed in advance.

Select methods for the specific route volume
Choose methods according to corridor, depth and interference

Which methods suit cable trenches, chambers and signalling points

The methods respond to different physical properties and have their own spatial investigation ranges.

Combining methods is useful where each answers a clearly defined question about the cable trench, chamber, crossing or signalling point.

01

Historical aerial photograph analysis

Assesses whether historical evidence indicates possible ordnance and which route sections are affected.

It does not detect objects present today and does not replace technical investigation of the future cable or point working volume.

02

Magnetometry

Responds to ferromagnetic objects and can be used in suitable accessible areas.

Rails, cables, earthing systems and metal installations can strongly influence the magnetic environment.

03

TDEM

Records time-dependent electromagnetic responses from conductive objects and can provide additional information in certain corridors.

The target object, depth, ground conditions and technical infrastructure determine suitability.

04

Ground-penetrating radar / GPR

Shows reflections at material and structural boundaries and can add information about utilities and layers on suitable paved surfaces.

A reflection does not automatically identify ordnance; knowledge of existing installations and data quality remain essential.

05

Deep-ground and downhole surveys

Investigates defined depth volumes for chambers, signal foundations, crossings and other deep localised ground disturbances.

The conclusions apply only to the defined point or corridor geometry.

06

Excavation supervision

In suitable excavation areas, each working layer is surveyed and assessed by a specialist. Controlled excavation in layers and an additional visual inspection follow. These steps are repeated to the agreed base of excavation; simply watching the excavator is insufficient.

It requires clearly defined excavation layers, stop points, responsibilities and section-specific documentation.

Compare drawing revisions and investigation results

What site management needs to establish from the investigation report

FONTANA-EOD documents the investigations carried out for each cable section and individual installation. Cable contractors, signalling contractors and site management receive information on results, unresolved areas and the drawings used.

Relate results to the planned earthworks

At the outset, the decision required is clarified: comparing design options, tendering, preparing a trench, assessing a crossing or handing over individual signalling points.

The method is selected according to the target object, depth, ground, surface, technical interference and access. Rails and existing cables are not treated as automatic reasons to rule out a method; they are included in a realistic suitability assessment.

During construction, revised alignments, new chambers and relocated individual installations are recorded immediately. This keeps investigation aligned with the actual construction and installation geometry.

Anomalies are assessed for consistency with their location, data quality, depth reference and known existing installations. Survey anomalies, objects causing technical interference and actual finds remain clearly distinguished in communication.

The handover describes the results together with survey limitations, unresolved sections and measures required before the next civil engineering or signalling step.

Plan cable alignments and individual points together

Linear cable alignments and individual signalling installations are planned together but assessed using their own investigation geometry.

Review existing installations before method selection

Cables, earthing systems, rails, foundations and technical installations are considered both as sources of information and possible interference.

Incorporate design changes under controlled procedures

New alignments, chambers and point positions are checked against survey areas, borehole positions and documented depths.

Maintain fieldwork quality for each section

Survey and excavation conditions are documented for each route section rather than generalised across the entire work package.

Keep unresolved areas on the status drawing

Inaccessible zones and those affected by technical interference are assigned a specific follow-up measure and responsibility.

Prepare handovers to cable and signalling contractors

Reports and drawings show which corridors and points have been resolved before the next installation or earthworks step.

Prepare the next construction section

From the cable section to a documented construction decision

Hand over results with chainage references

The records must show the alignment, chainage, depth, investigation status and outstanding follow-up measures so that designers and site management can clearly relate them to the next signalling or cable construction step.

Define tasks and handovers before construction begins

Who designs, investigates and passes on the documents

Cable civil works and signalling bring together clients, operators, design disciplines, contractors, specialist firms and public authorities. Before work begins, responsibilities are agreed for reporting design changes, commissioning investigations and passing results to subsequent contractors.

Each role receives the information needed for its own decision; technical assessment, operational authorisation and official handling of finds remain distinct.

Client

Infrastructure organisations and project leads

Define project objectives, route sections, signalling scope, drawing revisions, dates and required records. They bring together available drawings, as-built information and ordnance evidence, and commission the specialist services required for each construction section.

Across several work packages, they ensure consistent chainage references, data formats and handover rules.

Design

Cable, signalling and civil engineering design

Translates the project into cable alignments, chambers, crossings, signal positions, foundation geometries and construction stages. It incorporates explosive ordnance investigation into the design and bill of quantities.

Design changes are passed to the relevant specialists before the affected ground disturbance.

Operations and railway safety

Operator and railway safety arrangements

Set access requirements, possessions, protection zones and operating conditions around the track and installations.

Operational work authorisation and the specialist explosive ordnance assessment remain separate decisions with different prerequisites.

Execution

Cable civil works, signalling construction and site management

Construct trenches, chambers, crossings, individual foundations and assembly areas in accordance with the agreed drawing revision. Deviations in position, depth or construction method are reported before work continues.

If an unexpected suspicious object is encountered, they stop work immediately, leave it untouched and leave the immediate area. In Germany, they contact the police without delay; outside Germany, the local emergency reporting procedure applies.

Specialist contractor

FONTANA-EOD

Reviews the ordnance evidence and design information, develops the commissioned approach, carries out specialist services and documents results and the limits of the assessment.

The assessment remains related to the agreed corridors, points and depth volumes.

Regional specialist bodies and hazard-response authorities

KBD, KMBD, KRD and local authorities

In Germany, the ordnance disposal services of the federal states and the locally competent authorities carry out hazard-response and find-management duties. Their involvement is established for the project location; outside Germany, local responsibilities apply.

If a suspicious object is encountered, the police are contacted immediately. Internal project reporting follows afterwards. Further measures follow the instructions of the competent authorities at the project location.

The local public order authority and building control may be involved, depending on local procedures and the construction task. Contacts and requirements are assigned to the specific section and drawing revision. Technical investigation, operational work authorisation and official decisions about finds remain documented with their respective responsibilities.

Drawings, logs and reports

Which documents guide cable civil works and signalling construction

The route drawing, point list, survey data, chamber and crossing geometry and investigation status must use the same chainage references and drawing revision. This gives cable contractors, signalling installers and site management a clear basis for action even when drawings change.

For long cable programmes, the main route, branches, chambers, crossings and individual installations are recorded in a shared, updated overview. This shows which sections have already been investigated, which design changes require additional work and which documents are needed before civil engineering or installation.

Person beside a survey instrument on a construction site; a wheeled excavator with drilling equipment stands behind them.

Deep chambers and crossings

For chambers, bore paths and foundations, the depth investigation records needed for the specific ground disturbance must be established. Area surveys are used only within their documented scope.

Investigate chambers and crossings at depth
Three people beside a fenced excavation containing an exposed elongated object.

Findings and handover procedure

The original route or point reference is retained through to further investigation or action. Responsibilities and handovers are documented so that they remain traceable.

Assess findings and ordnance recovery procedures
People beside and inside shoring in a track area at night.
Excavator beside freight wagons and tracks at dusk.
Identify the project location

Locate the route and individual installations clearly

Illustrated map of Germany with location markers on a construction site.

Site plan and existing requirements

Provide the railway line, track and chainage together with the cable alignment. Chambers, crossings and signal positions need their own identifiers. If several drawing revisions exist, identify the position and depth intended for construction; this is essential for assigning existing investigation results to the correct section.

Use results correctly

Use utility information and explosive ordnance findings correctly

Utility information remains a separate requirement

The location of existing cables affects the working volume and survey conditions. An explosive ordnance report does not replace utility information or coordination of construction with those responsible for the installation. Both sets of documents must be brought together using the applicable drawing revision.

Distinguish the specialist tasks

Document crossings separately

For a crossing, assess the planned bore path and depths affected as well as the launch and reception points. Investigation of an open cable trench cannot be applied to a deeper crossing without technical assessment.

Check route-specific records

Technical information

Railways, roads and routes: brochure

The brochure shows how FONTANA-EOD combines historical investigation, specialist planning, surveying and construction supervision in infrastructure projects. It explains trackside constraints, method selection and limitations, and result documentation.

1 / 10
Railways, roads and routes: brochure — page 1

German · 10 pages

Design, construction and records

Common questions about explosive ordnance investigation in cable and signalling projects

When should explosive ordnance assessment for cable civil works and signalling begin?

Technical assessment should begin as soon as cable alignments, chambers, crossings, signal foundations, signal box connections and construction stages are sufficiently defined. Early design stages can start with assessment of the historical evidence of ordnance. Before tendering and construction, route width, depth of ground disturbance, individual foundations and inaccessible areas must be addressed through suitable investigation or a clear follow-up measure.

Which areas are included in investigation of a signalling cable project?

Cable trenches, cable ducts, protective pipes, jointing and cable chambers, crossings, signals, axle counters, balise locations, switching buildings, earthing systems and temporary excavations must be considered. Each component has its own position and depth geometry. A general route assessment therefore replaces neither point-specific foundation investigation nor section-specific assessment of deep crossings.

How are existing cables and sources of technical interference considered?

Existing cables, cable troughs, rails, earthing systems, signals, masts, foundations and metal installations are recorded before method selection. They can obscure survey data while also providing useful comparison information. Sections that cannot be adequately surveyed are marked on the drawing. The assessment establishes when they become accessible and which additional investigation suits the planned ground disturbance.

Is a surface survey sufficient for a cable trench?

This depends on trench depth, working width, ground conditions, surface, target object and interference. A suitable surface method may be sufficient for shallow, accessible sections. Deep crossings, chambers, signal foundations or areas outside the demonstrated investigation zone require their own point or depth investigation.

How are trenchless crossings and bore paths investigated?

The launch and reception pits, bore path, design depth, diameter, drilling method and safety volume are considered as connected investigation areas with differing access conditions. Pits accessible from the surface may need different methods from the deep bore corridor. An assessment of the launch pit is not automatically extended to the entire underground path.

When is excavation monitoring useful in cable civil works?

Explosive ordnance surveying during construction is considered where technically suitable for the planned ground disturbance. This may apply to trenches that become accessible only after demolition or cannot be adequately investigated beforehand because of existing cables, ballast, foundations or operational restrictions. Each working layer is surveyed and assessed by a specialist. Controlled excavation in layers and an additional visual inspection follow; these steps are repeated to the agreed base of excavation. Excavation layers, equipment use, stop points, responsibilities and reporting procedures are agreed before work begins. The conclusions remain limited to the working volume actually investigated.

If an unexpected suspicious object is found, stop work. Do not touch, move or uncover it further. Leave the immediate area and warn others without putting yourself at risk. In Germany, notify the police on 110; outside Germany, use the local emergency reporting procedure. The competent authorities determine what happens next; a project enquiry does not replace reporting the find.

Which records does site management need?

The documentation should bring together the alignment, chainage, working width, depth, chambers, crossings, individual foundations, methods used, survey and field conditions, findings, limitations and follow-up decisions. Changes to the cable route or signalling locations are checked against the documented investigation scope and recorded as a drawing revision.

Official information and requirements are included with complete appendices, dates and spatial scope. In Germany, the relevant ordnance disposal service, local public order authority and, where applicable, building control are identified for the project location; operational work authorisations remain separate processes. Outside Germany, coordination is with the authorities responsible locally.

What determines the effort, duration and cost of an ordnance assessment?

Key factors are route length, the number of chambers and crossings, trench depth, individual foundations, access, possession windows, existing cables, track superstructure, methods required, data formats and documentation requirements. Additional depth investigations, repeat surveys or services during construction are considered separately where they fall outside the original scope.

Assign cable and signalling documents clearly

The documents we need for the cable route and signalling installations

An initial enquiry does not need to contain a complete bill of quantities. The essential requirement is a clear spatial description of linear corridors, deep individual points and construction stages.

Where there are several work packages or possessions, provide priorities, drawing revisions and required handover dates.

Route and point documents

Provide the railway line, track, chainage, cable alignments, working widths, chambers, crossings and signalling point lists with the current drawing revision.

Signal locations, technical areas and revised as-built positions should be clearly marked.

Ground disturbance, depths and construction stages

Describe open trenches, protective pipes, chambers, excavation support, bore paths, individual foundations and maximum depths.

Possession windows, access, parallel trades and the date when a decision is needed affect the method and site planning.

Existing conditions and available records

Include aerial photograph assessments, official correspondence, existing cable, earthing and structural drawings, ground investigation data and previous survey or clearance reports.

Incomplete utility information is also relevant because it affects survey feasibility and work preparation.

For initial specialist assessment

For an initial comparison, a route drawing, point list, short description of trench and chamber construction, maximum depths, planned dates and existing ordnance evidence are often sufficient.

FONTANA-EOD uses these documents to assess the investigations needed and identify missing information. For extensive signalling programmes, the work can be divided by corridor, point group and construction stage.

Spatial reference

Railway line, track, chainage, cable alignment, chamber, crossing and drawing revision.

Intervention geometry

Working width, trench depth, excavation support, bore path, foundation and point coordinates.

Construction organisation

Possession windows, access, civil engineering sequence, cable pulling, signalling installation and handover dates.

Documentation objective

Documents for design, procurement, site management, cable construction, signalling construction or the project file.

GPR on a construction site
Project enquiry

Have your project assessed

Whether historical aerial photograph analysis, explosive ordnance surveying, surface surveying using GPR, magnetometry or TDEM, deep-ground surveys, downhole surveys, excavation supervision, area clearance or ordnance recovery is needed depends on the location, ground disturbance, depth, ground and existing documents. An early ordnance assessment provides clarity for tendering, programming, occupational safety and construction.

FONTANA-EOD combines its Section 7 SprengG licence, specialists holding Section 20 SprengG certificates of competence, suitable survey and clearance methods, and traceable documentation. Send the site plan, depth of ground disturbance, construction phase and existing documents for an initial technical assessment.