Project pathway
The quickest route to the right decision.

Which areas have already been investigated, which remain occupied and which will become accessible later? For a construction project with several stages, this must be clear for each forthcoming ground works activity. FONTANA-EOD helps plan explosive ordnance investigations in Wiesbaden and documents the results for the individual work areas.
Show investigated and outstanding sections on the plan.
Account for access roads and areas that remain in use.
Pass reports and plans to site management.
For official information about your property in Wiesbaden, the contact is the statewide explosive ordnance clearance service at the Darmstadt regional administration. It specifies a written enquiry with an accurate site, cadastral or detailed plan and marked property boundaries. Alternatively, its website provides an online application for aerial photograph analysis. The statement describes possible contamination and the work required as a result.
We relate this statement and existing technical reports to your planned ground works. Investigated, outstanding and currently inaccessible areas remain distinct on the plan. Further investigation needs and the next steps are agreed with the responsible parties for each construction stage.
An example of our own local work is the ground-penetrating radar investigation in Wiesbaden-Biebrich. The method description helps place it in its technical context. For your project enquiry send the official statement, existing reports and current location and depth plans.
Explosive ordnance survey – Wiesbaden – railway services – 813217, ZECH Umwelt Wiesbaden
Service period: 2026-09
Service areas:Surface surveys: GPR, TDEM and magnetometryMethod used in this project: Ground-penetrating radar

For projects in Wiesbaden, the independent city and state capital, clearly identify the part of the city, project address and affected land parcels. This applies to the city centre and historic neighbourhoods as well as Biebrich, Schierstein, Dotzheim, Erbenheim, Mainz-Kastel, Mainz-Kostheim, Nordost and Sonnenberg. For enquiries from the surrounding Rhine-Main region, such as Hochheim am Main, Taunusstein, Rüsselsheim am Main or Hofheim am Taunus, the responsible municipality is identified from the project location. Mainz is in Rheinland-Pfalz and has a different state procedure. For each project, existing statements, investigation reports and the next ground works are brought together. In an evacuation, the specific official emergency response determines subsequent measures and when people may return; routine investigation services and such measures are recorded separately within the construction programme. Further project locations are available in the regional overview.
For the regional context of your construction project, the Darmstadt administrative district overview provides further local information.
The specialist authority for explosive ordnance matters in Hessen is the explosive ordnance clearance service at the Darmstadt regional administration. It processes enquiries with a precise spatial reference and issues a statement about possible contamination and necessary work. Compare the resulting tasks with the proposed construction stages.
The historical account published by the state capital Wiesbaden documents the air raid on the night of 2–3 February 1945. For investigations today, such historical indications are related to the specific ground works area. Available records and aerial photographs must be assessed for urban infill, older residential and commercial neighbourhoods, railway and route corridors or redeveloped sites. Documented reconstruction, filling and later earth movements may affect comparison with the present ground. For a proposed excavation, retaining structure, utility crossing or bridge project, the spatial references at the time are therefore checked against the current location and depth plans. The type and scope of further specialist work depend on the actual local findings.
When a bomb is found, the explosive ordnance clearance service assesses defusing or detonation and defines the safety area. The state capital Wiesbaden explains the evacuation procedure and the subsequent announcement that it has ended. Routine construction planning accounts for the fact that the duration and sequence of the official emergency response depend on the specific find.
For the commissioned work, the applicable technical requirements, permits, competence and responsibilities are clarified. The actual scope of work is what matters. Tasks and interfaces are described for the project and checked against the required authorisations.
The risk assessment, work areas and communication arrangements must suit the planned activities. Specialist explosive ordnance work is coordinated with the other construction activities. Site organisation, traffic safety and other technical assessments retain their own responsible parties. Joint coordination assigns the relevant specialist work and responsibilities to the affected construction sections.
A measurement anomaly first requires specialist assessment; its appearance alone does not identify it as explosive ordnance. If an object is genuinely suspected to be ordnance, the prescribed reporting procedures and the measures set by the responsible authorities apply. Investigation reports specify the work completed and its limitations, so that results are not extended to unexamined areas or later design changes.
The KMRD at the Darmstadt regional administration explains the statewide aerial photograph information service and the involvement of a specialist contractor. The state capital Wiesbaden provides information on the safety area, evacuation and return following a specific bomb find.
The BFR KMR guidelines on clearance planning describe preparation for the technical work. The guidance on geophysics explains investigation methods; the documentation requirements support a traceable handover. The DGUV FAQs on explosive ordnance clearance address the requirements for investigations during construction. The Hessen general provisions specify, among other matters, work notifications, responsible persons and site plan documentation.
For proposed explosive ordnance clearance work in Hessen, the brief, responsible person, start of work and file reference are communicated to the KMRD in good time. Its published notification guidance lists, among other documents, a site plan, the permit under § 7 SprengG and the supervisor’s certificate of competence. The respective tasks are described with the evidence required before work begins. For explosive ordnance surveying in Wiesbaden, these coordination points belong in preparation of the relevant work package; routine construction and official measures are coordinated with their responsible parties.
The BFR KMR apply to federal properties and provide supplementary technical guidance for other projects. The locally applicable requirements and responsibilities are established for the specific project.
The permit, certificate of competence and responsibilities for the specific activity are assessed under the Explosives Act and the First Ordinance to the Explosives Act. The risk assessment under Section 5 of the Occupational Safety and Health Act relates to the planned activities. The DGUV Information 201-027 covers preventive investigation and clearance of conventional explosive ordnance and defines its scope. Its explanations concerning DGUV Rule 113-003 relate to specific activities involving explosives; they are not applied indiscriminately to every investigation for construction.
The client describes the project and provides the available project records. The operator adds requirements for use, access and timing. A coordinating contact brings the parties together; individual tasks remain assigned to the named parties. Before commissioning, it is clearly recorded what information is missing, who will obtain it and what decision the result is intended to prepare.
The specialist designers describe areas, depths, construction methods and changes. Site management coordinates the planned sequence with the construction contractors and agreed specialist works. Results are assigned to the respective intervention. A technical plan change is communicated early enough for its effect on the survey task to be assessed before construction. Organisational construction stage boundaries remain distinguishable from technical survey boundaries.
The private explosive ordnance specialist carries out the agreed investigation and documentation work. Requirements and decisions of public authorities are addressed with the responsible bodies. The documents needed for a particular procedure depend on the location and project. The technical report describes the work carried out, including its documented area, depth and scope. Decisions reserved for public authorities are made by those authorities.
The KMRD at the Darmstadt regional administration is responsible for the whole of Hessen. On request, it evaluates wartime aerial photographs and issues a statement on possible explosive ordnance contamination and necessary work. Investigation or clearance of the site is prepared with a suitable explosive ordnance specialist contractor. Defusing, detonation and removal remain the responsibility of the KMRD or persons it commissions. For a find, the local public order authority or police are involved; they notify the state service. The project owner, specialist contractor and site management record the respective brief, responsible persons and coordination needed for the specific construction stage.
First establish which findings are still needed for the proposed section. Method selection considers existing findings, ground conditions and possible interference. An adjoining section already investigated does not automatically determine the method. What matters is whether the proposed investigation can provide suitable findings under the specific conditions.
Select the specialist service for the outstanding questionWhen a previously occupied area becomes available, its condition and proposed ground works are compared anew. Specialist planners relate the previous limitation to the outstanding task. An earlier investigation attempt is considered with its limitations. The required addition is described specifically before the work it affects.
Compare investigation methods
Mark which ground works are next and the area they will actually affect. This includes preparatory ground disturbance outside the later structure. A shared project address is insufficient to establish the location. The specialist task is described by location, planned depth and the findings available for it.
Compare specialist services
If an area was inaccessible during the investigation, this remains documented with the reason. The other results retain their actual scope. Access cleared later initially creates a new opportunity to work. Whether supplementary investigation is needed, and which kind, is assessed professionally against the ground works concerned.
Document findings and their limitations
For each transition, record which results the following stage can use and which questions remain outstanding. Identify the person receiving these records. A shared schedule helps coordination, but does not replace comparison of the investigation scope with the ground works actually proposed next.
Coordinate the sequence and tasksFirst establish which decision the commission needs to support. Is the task an initial assessment of existing documents, an investigation of a specific area or examination of an anomaly that has already been assessed? These tasks require different evidence. A general wish for safety does not define an investigation that can be carried out. The enquiry therefore specifies the groundworks, location, depth and available findings. Suitable specialist work and the required reporting are then agreed on that basis.
Define the specialist taskRequired access and survey conditions are clarified before the site visit. This may include keeping areas clear, obtaining service information and coordinating with other trades. The method and site determine which preparations are actually needed. Changes to the surface or additional groundworks are not undertaken unilaterally simply to prepare for a survey. Their sequence is agreed with the specialist designers and responsible parties.
Clarify preparatory work in the programmeA realistic programme distinguishes technically resolved work from prerequisites that are still outstanding. If only part of a site will be accessible, the commission must take this into account. Handover and assessment of the results also need time in the construction programme. The schedule and effort are agreed once the scope, access and prerequisites are clear. This coordination brings together the specified scope, access, documents, site conditions and the date by which a decision is needed.
Discuss the scope and scheduleMark on the site plan which sections are available for investigation, which have already been covered and which are not yet accessible. A continuous property may have different stages of work. Mark the transitions too. Before later ground works, check whether existing investigations cover these areas.
Where building entrances, access roads or utility routes are needed during the project, describe these conditions early. Agree with those responsible on site which use is possible during the investigation. Record the agreed work windows, closed sections and responsible contacts on the current plan.
Alongside the main structure, a construction stage may involve additional ground works for utilities, drainage or temporary facilities. Record such possible tasks with their spatial references. Check whether existing investigation results cover them. Assignment to the same construction stage is insufficient on its own.
Before the next ground works, the plan version, investigation result and outstanding tasks should be available together. If the construction programme changes, these references must be checked again. A verbal reference to an earlier assessment is insufficient for traceability where the area covered or its boundaries remain unclear.
Link the report to a traceable area boundary and associated plan versions. Explicitly identify sections not investigated. Site management can then check which findings apply to the forthcoming ground works. Even a brief handover retains the complete appendices and technical limitations as part of the records. After clearance work, the clearance record, its scope, results and remaining limitations are assigned to the area actually treated and associated plan version.
A moved utility or additional foundation is shown on the current plan. The existing results are then compared with the changed ground works. Other areas retain their documented status. The necessary addition is determined from the actual difference, not simply inferred from an unchanged project name.
Compile the proposed construction stages with their associated areas and depths. Include existing statements and reports in full. The sequence in which results are needed is agreed together. Preparatory ground works that precede the main excavation or later foundations can then also be included.
Add newly available results to the common overview and check their relevance to the next activity. Outstanding areas retain their own identification. Where the plans have changed, the implications are clarified professionally. The handover thus describes the status actually achieved and the prerequisites still needed.
Historical aerial photograph assessment and other old records help place the basis for suspicion in its spatial context. The available images, their evidential value and the limits of the area considered matter. The absence of an identifiable indication must be distinguished from a technically surveyed ground area. The assessment is considered together with the planned intervention and other available findings. It can support the choice of a survey, but is not a measurement of the present-day subsurface or confirmation for all future works.
Understand aerial photograph assessmentMagnetometric methods detect magnetic anomalies. Whether they can address the specific survey task depends, among other things, on the expected objects, ground conditions, interference and required survey area. Fences, utilities or existing structures may affect interpretation. A measurement signal is therefore not described as ordnance solely because of its strength. Method, interpretation and any further investigation are planned as a connected specialist task.
Understand the scope of magnetometryElectromagnetic investigations can be suitable for particular metallic targets and site conditions. Their suitability must be explained for the task, rather than inferred simply from the availability of equipment. Interfering installations, accessible areas and the findings required must also be considered. Results are documented with their location and survey conditions. The specialist assessment determines whether a supplementary method is needed; this remains a project-specific decision.
Understand electromagnetic surveyingUnder suitable conditions, ground-penetrating radar can provide information about subsurface structures and reflections. Ground conditions, moisture, installations and the particular survey task affect interpretability. An anomaly is not automatically ordnance, and an area with no apparent anomalies is not general evidence for arbitrary depths. The specialist interpretation and its limits are documented with the instruction. A survey for another purpose is not adopted without checking as ordnance evidence.
GPR and limitationsFor deeper groundworks, it may be necessary to establish whether a surface investigation can provide the required findings or another approach is needed. Preparation includes the location, depth, borehole layout and existing services. Creating access for the investigation must also be properly planned by specialists. A general depth figure or standard grid cannot replace that work. Findings remain limited to the areas actually investigated and the method used.
Prepare deep interventionsIf a necessary preliminary investigation cannot be completed, the specialists assess whether a planned approach during construction is suitable. This includes coordinated investigation, interpretation and communication of findings within the intended work sequence. Visual observation of excavated material is not an interchangeable substitute for a necessary survey. Site management needs a clear description of when specialist work will take place, how new findings will be handled and which areas remain unresolved.
Agree the approach during constructionThe historical aerial photograph analysis and existing statements are compared with the proposed division into sections. Check the records to establish which findings are available for each section. The construction schedule’s sequence does not determine the coverage of an existing investigation.
Where reliable historical information is missing for an extension area or new construction stage, the necessary research and aerial photograph analysis are commissioned specifically. Existing explosive ordnance records are also checked with their file references, dates and spatial scope. The Hessen KMRD statement describes the possible contamination derived from aerial photograph analysis and the work required. If area boundaries change, those of the original enquiry remain identifiable. Additional exploratory work, utility trenches or excavations may affect different sections from those in the site plan initially submitted. Clarify such changes with the technical parties before the affected ground works.
For a surface survey an area being marked as available in the schedule is insufficient. Actual survey conditions and possible interference must be assessed. Record unanswered questions and agree the next steps. Completion of another section does not answer these questions.
Method selection considers the investigation objective, required depth and actual site conditions together. Fill, ground composition, metal utilities, reinforcement or interfering objects can limit interpretation. Specialist planners describe which investigation is suitable under these conditions and how remaining questions will be addressed. For deep foundations, retaining structures or borehole positions, the location and depth of the proposed work are stated specifically. Any necessary deep survey or borehole clearance is related to that task. If a survey point moves or the ground works depth changes, the existing investigation scope is compared with the revised plan.
The explosive ordnance clearance during construction is planned according to the specialist task, existing findings and actual working conditions. According to the DGUV FAQ, visual observation alone during excavation does not meet the state of the art. Appropriate detection, technical assessment and documentation are provided for the agreed investigation scope.
The investigation is coordinated with the other work on site. For staged projects, identify approved access, transport and utility routes still needed, and operational restrictions. If storage areas or installations are removed, the resulting conditions are assessed before the next investigation. Site management needs the area covered and outstanding tasks in an unambiguous plan version. An agreed handover point in the construction programme ensures that results are available before the work intended to rely on them.
For a tender divided into sections, describe each investigation task with its prerequisites. These include the investigation objective, available area, proposed depths and required results documentation. Distinguish work already commissioned from additions whose need will be established only after further assessment. Travel to sections worked at different times, restricted work windows and handover to several executing contractors also belong in the scope agreement. Offers can be compared when they concern the same task and conditions. Changes are recorded against the affected construction stage and a traceable plan version. Additional depth or an extension area can then be addressed technically and organisationally as a separate addition, while previously documented results retain their original scope.
Show areas, ground works and the intended sequence on the plan. The initial discussion records the construction task and results needed first. The document review compares existing reports and statements with the proposed areas and depths and identifies missing information.
Agree access and operational requirements on site. Where historical information is incomplete, the necessary research and aerial photograph analysis are planned. Uses, access and possible interference are recorded so that investigations can be prepared for the relevant areas.
Bring together the investigation task and existing findings. Method selection considers the investigation objective, depth and survey conditions. The commissioned survey or technically suitable supervision investigates the defined areas. Results are assessed with their interpretation limits.
Pass on the areas covered and outstanding questions clearly. The report and site plan document the actual scope completed. The next-step decision checks which subsequent ground works are covered and where further specialist work or consultation with the authorities is required.
Site management needs more than the report date: its spatial and technical scope matters. Record which areas were investigated, the results and the conditions that applied. If further areas become accessible later, their investigation needs require separate clarification. The earlier result does not automatically apply to them.
Hessen’s provisions require assessed or cleared areas to be documented with a site plan. This spatial evidence supports assignment to the construction stage; official decisions are recorded separately. The planning and documentation principles in the BFR Kampfmittelräumung support a traceable investigation brief and complete results handover.
For handover between investigation and construction, the results plan, investigation brief and current construction plan are provided together. The plan shows the sections investigated, their depth references and areas with limited findings. For clearance work, the project file includes the clearance record with the actual scope completed. Hessen’s provisions require a copy of the site plan documentation to be submitted to the KMRD after completion. Agree the necessary records and recipients when commissioning. Site management or executing contractors brought in later can then trace the authoritative status for each section. Where area clearance or recovery are required, the task, area and responsibilities are clarified before work begins.
Hessen’s provisions require site plans at a scale of 1:1,000 for investigated areas or areas cleared of ammunition. The project file must retain a traceable relationship to the respective property and construction stage. Reports containing depths also record the vertical reference used. If excavation, filling or later construction has changed the ground, these conditions are compared with the original investigation. A local elevation change may affect which ground layers the next ground works reach. Use the associated plans together with the report and mark later changes. For a site in Wiesbaden suspected of explosive ordnance contamination, this comparison defines the outstanding specialist task more precisely. The next brief can then target the areas actually requiring supplementary work.
We assess the planned groundworks against the available documents and their design revision. Before attending site, we agree with you what needs to be investigated, which areas are accessible and what findings are required. If the design or site conditions change, we check whether the agreed scope remains appropriate. The report states what was actually investigated and the limits of the findings. This allows designers and site management to see which findings they can use and where questions remain.
Discuss the investigation taskWe first establish the investigation objective: which question must it answer? We then select a technically suitable method. The availability of a particular device or experience on a similar neighbouring site is not enough to justify the choice of method on its own.
Inaccessible areas and limited conclusions are identified. They do not disappear into a total area figure. Designers and site management can then decide specifically which areas still need attention and when a suitable survey becomes possible.
A new location, additional depth or different construction method is compared with previous results. A familiar project name does not replace this comparison. Feedback is provided before the affected work so that an outstanding question can be included in the sequence.
The technical conclusion remains connected to its location references and appendices. A brief summary helps orientation but does not replace the documented survey scope. This basis is retained even if site management or contractors change.
An area’s availability and its technical work status describe different prerequisites. Document both in the project overview. If a previously inaccessible area becomes available, the outstanding task can be prepared specifically. A change in use alone does not add to the contents of an earlier report.
Understand investigation reports and their limitationsUse the same unambiguous names in the plan, report and construction stage. The list refers to the complete appendices and identifies outstanding points. Parties joining later can then understand the status. A brief note such as completed remains insufficient without the task and investigated area. Resuming work depends on the specific circumstances, official measures and prerequisites for the following activities.
Understand the service scope
Aerial photograph interpretation is related to the actual groundworks. Its purpose and geographical scope remain distinct from a technical investigation of the ground as it is today.
Understand aerial photograph assessment
The findings, their locations and limitations are handed over together. This makes clear to those carrying out the work which area has been investigated and which task remains outstanding.
Assess investigation reports


Historical assessment, technical investigation and further work answer different questions. In your enquiry, describe the planned ground works and the findings needed to prepare them. For projects in the industrial and infrastructure sector add the operational conditions.
Compare services
Preparation connects the commission, site work and handover of findings. Changes to the project can then be incorporated into technical coordination in good time.
Process and documentationWhether separate work is appropriate, and how it should be arranged, must be established from the specialist task and local conditions. Section boundaries and transitions must remain traceable. A result for one section does not automatically apply to an adjoining area or one added later.
Identify the access needed, operations affected and responsible contacts. These details form part of investigation planning. The use possible during a particular activity can be agreed only for the specific project. Agree investigation needs early, before the affected ground works. This includes preparatory ground disturbance before the main excavation.
According to the DGUV FAQ, visual observation alone during excavation does not meet the state of the art. Explosive ordnance clearance during construction needs a suitable, technically justified task and appropriate detection and documentation.
The official lifting of the evacuation is decisive. Wiesbaden’s emergency services provide information through the media, loudspeaker announcements and municipal crisis information. People may return only after it is lifted and in accordance with the authorities’ instructions.
Stop the affected work, keep your distance and leave the object untouched. Notify the police immediately on 110 and follow the authorities’ instructions. Do not move the object, expose it further or remove it yourself.
The outstanding investigation question can be prepared specifically using the area now available. This does not retrospectively extend the earlier report. Provide the current site plan, proposed depths and existing statements, complete investigation reports and utility plans. Clarify outstanding requirements in the KMRD statement with the bodies responsible for the project.
Each section receives a clear spatial reference, the proposed ground works and the results available for them. Outstanding questions remain separately visible.
The area, ground works depth, access, interference and evidence needed determine the work involved. Several construction stages also require the relevant site visits and handovers. Agree the specialist work needed for each on the basis of the actual plan version.
Also mark preparatory ground works and sections needed later. For a further construction project in Frankfurt the location, foundations and local investigation tasks are agreed separately.
Add complete reports and information on previously inaccessible areas.
Whether historical aerial photograph analysis, explosive ordnance surveying, surface surveying using GPR, magnetometry or TDEM, deep-ground surveys, downhole surveys, excavation supervision, area clearance or ordnance recovery is needed depends on the location, ground disturbance, depth, ground and existing documents. An early ordnance assessment provides clarity for tendering, programming, occupational safety and construction.
FONTANA-EOD combines its Section 7 SprengG licence, specialists holding Section 20 SprengG certificates of competence, suitable survey and clearance methods, and traceable documentation. Send the site plan, depth of ground disturbance, construction phase and existing documents for an initial technical assessment.