Project pathway
The quickest route to the right decision.

Do you have old photographs or information about previous buildings on your site, but no survey report clearly linked to it? Before ground works in Marburg, establish what the records actually show. Send the available documents and the current site plan; FONTANA-EOD can help identify the technical questions they raise for your project.
Record the source and location of each photograph.
Compare the former and current sites.
Clarify the specific investigation required.
For an explosive ordnance assessment before construction in Marburg, we examine the source, date and location of the available records. Historical photographs are assessed alongside current plans and available technical reports. Confirmed information remains distinct from unresolved questions about locations, so that the further investigation needed for the specific ground works can be established on a clear basis.

Marburg is in the Marburg-Biedenkopf district and the Gießen administrative district in Hessen. A project must clearly identify the site, current address and affected land parcels. This also applies to work around the railway station, on redeveloped industrial sites and on existing transport and utility infrastructure. Historical descriptions in the city archive collection are recorded with their location and date and related to the present construction site. The bomb damage, demolished houses and subsequent redevelopment described there form part of the site research. For an enquiry concerning a neighbouring municipality, local responsibility is established from the actual project location. The KMRD at the Darmstadt regional administration, which is responsible throughout Hessen, handles the official site assessment concerning explosive ordnance. Further project locations are available in the regional overview.
The digital image collection of Marburg City Archives contains records of bomb damage at the railway station and in Bahnhofstraße. The descriptions also mention houses demolished later and subsequent redevelopment. These are historical indications of conditions at the time. For ground works today, they must be assessed against the specific site, further technical documents and the planned works.
For your planning, the location and context matter: which area does the photograph show, when was it taken and what changed afterwards? A street-level photograph shows different details from a historical aerial photograph. Both can contribute to research, but require technical assessment and a clear connection to the present construction site. Uncertain dates or site boundaries that cannot be identified reliably should remain recorded as unresolved questions.
For the commissioned work, the applicable technical requirements, permits, competence and responsibilities are clarified. The actual scope of work is what matters. Tasks and interfaces are described for the project and checked against the required authorisations.
The risk assessment, work areas and communication arrangements must suit the planned activities. Specialist explosive ordnance work is coordinated with the other construction activities. Site organisation, traffic safety and other technical assessments retain their own responsible parties. Joint coordination assigns the relevant specialist work and responsibilities to the affected construction sections.
A measurement anomaly first requires specialist assessment; its appearance alone does not identify it as explosive ordnance. If an object is genuinely suspected to be ordnance, the prescribed reporting procedures and the measures set by the responsible authorities apply. Investigation reports specify the work completed and its limitations, so that results are not extended to unexamined areas or later design changes.
The Marburg City Archives image collection describes historical views of the railway station and Bahnhofstraße. The University City of Marburg explains how to report a find through the public order authority or police and how the Hessen KMRD is involved.
The BFR KMR guidelines on clearance planning describe preparation for the technical work. The guidance on geophysics explains investigation methods; the documentation requirements support the handover of results. The DGUV FAQs on explosive ordnance clearance address requirements for investigations during construction. The KMRD at the Darmstadt regional administration explains the statewide property information service and the involvement of a specialist contractor.
Hessen’s general provisions require explosive ordnance clearance work to take place under the continuous supervision of a responsible person holding a certificate of competence under § 20 SprengG. The notification guidance published by the regional administration requires the permit holder’s signature and lists, among other documents, a site plan, the permit under § 7 SprengG and the certificate of competence of the supervisor on site. The client, responsible person, start of work, working hours and KMRD file reference must be communicated in good time. Project preparation establishes who will compile this information and pass it to the relevant parties. If areas or construction stages change, their relationship to the planned specialist work must remain clear. The project owner and site management coordinate the commissioned investigations with the rest of the construction programme. Building control requirements and other project conditions are clarified with the responsible bodies; the relevant contacts and required documents are recorded in the project file.
The BFR KMR are used as technical guidance; locally applicable requirements and responsibilities must be clarified separately.
The permit, certificate of competence and responsibilities for the specific activity are assessed under the Explosives Act and the First Ordinance to the Explosives Act. The risk assessment under Section 5 of the Occupational Safety and Health Act relates to the planned activities. The DGUV Information 201-027 covers preventive investigation and clearance of conventional explosive ordnance and defines its scope. Its explanations concerning DGUV Rule 113-003 relate to specific activities involving explosives; they are not applied indiscriminately to every investigation for construction.
The client describes the project and provides the available project records. The operator adds requirements for use, access and timing. A coordinating contact brings the parties together; individual tasks remain assigned to the named parties. Before commissioning, it is clearly recorded what information is missing, who will obtain it and what decision the result is intended to prepare.
The specialist designers describe areas, depths, construction methods and changes. Site management coordinates the planned sequence with the construction contractors and agreed specialist works. Results are assigned to the respective intervention. A technical plan change is communicated early enough for its effect on the survey task to be assessed before construction. Organisational construction stage boundaries remain distinguishable from technical survey boundaries.
The private explosive ordnance specialist carries out the agreed investigation and documentation work. Requirements and decisions of public authorities are addressed with the responsible bodies. The documents needed for a particular procedure depend on the location and project. The technical report describes the work carried out, including its documented area, depth and scope. Decisions reserved for public authorities are made by those authorities.
The KMRD at the Darmstadt regional administration is responsible for the whole of Hessen. On request, it evaluates wartime aerial photographs and issues a statement describing the possible contamination and required work. Technical investigation or clearance of the site is prepared with a suitable specialist contractor. Defusing, detonation and removal remain the responsibility of the KMRD or persons it commissions. The City of Marburg identifies the local public order authority or police as the contacts for a possible find. They notify the state service. Before work starts, the commission, responsible persons, required evidence and work notifications are agreed.
The historical assessment first sets out the available indications and their limitations. Together with the planned ground works, these establish what further specialist work is required. A technical method is selected to suit the task and conditions. The viewpoint of an old photograph determines neither the suitable method nor what that method can establish.
Assess historical documentsIf a historical indication cannot be located reliably, that uncertainty is passed to the specialist planners. How it is addressed depends on its significance for the project. An unknown photograph location must not be replaced by an assumption. The investigation brief should clearly account for this starting point.
Compare investigation methods
Refer to the archive record or the source of the photograph. Its date, viewing direction and existing notes help establish the context. Unknown details must be identified explicitly. An image cropped without its context may lose important features, making comparison with the present site and planned ground works more difficult.
Arrange specialist assessment of historical evidence
Check how addresses, buildings and site boundaries have changed since the photograph was taken. The current site plan provides the reference for the project. An assumed match remains identified as an assumption. The technical assessment should show which locations are confirmed and what information is still needed.
Document findings and their limitations
Records of alterations, demolition or investigations can add to the site’s history. Each report is read according to its actual purpose and area. Bringing the records together makes the assessment easier to trace. It does not turn a historical description into current technical evidence for every part of the site.
Document findings and their limitationsFirst establish which decision the commission needs to support. Is the task an initial assessment of existing documents, an investigation of a specific area or examination of an anomaly that has already been assessed? These tasks require different evidence. A general wish for safety does not define an investigation that can be carried out. The enquiry therefore specifies the groundworks, location, depth and available findings. Suitable specialist work and the required reporting are then agreed on that basis.
Define the specialist taskRequired access and survey conditions are clarified before the site visit. This may include keeping areas clear, obtaining service information and coordinating with other trades. The method and site determine which preparations are actually needed. Changes to the surface or additional groundworks are not undertaken unilaterally simply to prepare for a survey. Their sequence is agreed with the specialist designers and responsible parties.
Clarify preparatory work in the programmeA realistic programme distinguishes technically resolved work from prerequisites that are still outstanding. If only part of a site will be accessible, the commission must take this into account. Handover and assessment of the results also need time in the construction programme. The schedule and effort are agreed once the scope, access and prerequisites are clear. This coordination brings together the specified scope, access, documents, site conditions and the date by which a decision is needed.
Discuss the scope and scheduleFor a historical photograph, provide its location in the collection and the existing description. A cropped image without its source is harder to assess. If the date or exact location is only assumed, mark it accordingly. A reference to the archive record is sufficient for the initial discussion; this does not grant permission to reuse someone else’s images publicly.
Old addresses, building outlines and land divisions may differ from the current plans. Mark the proposed ground works on an up-to-date site plan and compare it with the older plans available. The technical assessment must show which locations are confirmed. An approximate resemblance between two views is not enough to define an investigation area.
If construction, demolition or investigations took place after the historical photograph, reports and associated plans may exist. Their precise scope matters. An existing building does not demonstrate that a site is free from explosive ordnance. Equally, an older report need not be rejected simply because of its age: first read its purpose, the area it covers and the limits of its findings.
Compile not only the available documents, but also a note of any missing plan or photograph area that has not yet been located. Describe the proposed ground works and their depths, where these are known. This helps establish whether more records are needed first or a technical investigation can be prepared.
The documentation identifies the sources used and relates them to the investigated area. Uncertain dates or boundaries are taken into account in the findings. This allows subsequent site management to understand the basis of the technical assessment. Simply stating that old photographs were available does not describe their actual contribution. For commissioned investigations, the project file brings together the measurement data, survey results and interpretation of findings with the full report, site plan and limitations. After clearance work, the clearance record and its scope and results are assigned to the areas actually treated.
When another plan or report is found, its relevance to the unresolved task is assessed. It may improve the identification of a location or raise new questions. The existing assessment is supplemented according to the document’s specific contents. An additional document does not automatically extend the investigation scope or replace a missing technical finding.
Compile the original references, available descriptions and current plans. Include any technical reports in full. Describe the location and depth of the planned ground works. This allows the initial discussion to establish which historical locations are already supported and what further information or investigation the project needs.
The report is handed over with the source material used and the associated plans. Unresolved questions remain visible in any summary. If plans change later, the spatial coverage is checked again. Subsequent construction planning then has a clear record against which additional findings can be assessed.
Historical aerial photograph assessment and other old records help place the basis for suspicion in its spatial context. The available images, their evidential value and the limits of the area considered matter. The absence of an identifiable indication must be distinguished from a technically surveyed ground area. The assessment is considered together with the planned intervention and other available findings. It can support the choice of a survey, but is not a measurement of the present-day subsurface or confirmation for all future works.
Understand aerial photograph assessmentMagnetometric methods detect magnetic anomalies. Whether they can address the specific survey task depends, among other things, on the expected objects, ground conditions, interference and required survey area. Fences, utilities or existing structures may affect interpretation. A measurement signal is therefore not described as ordnance solely because of its strength. Method, interpretation and any further investigation are planned as a connected specialist task.
Understand the scope of magnetometryElectromagnetic investigations can be suitable for particular metallic targets and site conditions. Their suitability must be explained for the task, rather than inferred simply from the availability of equipment. Interfering installations, accessible areas and the findings required must also be considered. Results are documented with their location and survey conditions. The specialist assessment determines whether a supplementary method is needed; this remains a project-specific decision.
Understand electromagnetic surveyingUnder suitable conditions, ground-penetrating radar can provide information about subsurface structures and reflections. Ground conditions, moisture, installations and the particular survey task affect interpretability. An anomaly is not automatically ordnance, and an area with no apparent anomalies is not general evidence for arbitrary depths. The specialist interpretation and its limits are documented with the instruction. A survey for another purpose is not adopted without checking as ordnance evidence.
GPR and limitationsFor deeper groundworks, it may be necessary to establish whether a surface investigation can provide the required findings or another approach is needed. Preparation includes the location, depth, borehole layout and existing services. Creating access for the investigation must also be properly planned by specialists. A general depth figure or standard grid cannot replace that work. Findings remain limited to the areas actually investigated and the method used.
Prepare deep interventionsIf a necessary preliminary investigation cannot be completed, the specialists assess whether a planned approach during construction is suitable. This includes coordinated investigation, interpretation and communication of findings within the intended work sequence. Visual observation of excavated material is not an interchangeable substitute for a necessary survey. Site management needs a clear description of when specialist work will take place, how new findings will be handled and which areas remain unresolved.
Agree the approach during constructionThe historical aerial photograph analysis examines suitable photographs for indications relevant to explosive ordnance assessment. It is not the same as looking at individual street-level photographs. The findings must relate to the area in question; poor image quality, insufficient coverage or features that cannot be identified reliably limit the conclusions. The absence of an indication in a single image is not general evidence that a site is unaffected.
Where historical information remains incomplete, the necessary research and aerial photograph analysis are commissioned for the specific area. This includes the available site and land-use records, earlier statements and the question of which ground works are to be prepared. A commission might, for example, concern the assessment of an extension area not previously evaluated or the analysis of additional photographs. The technical assessment records what these establish and where the available historical record remains limited. Newly found documents are interpreted in relation to their original brief. For a site in Marburg suspected of explosive ordnance contamination, the next step is to establish which technical investigation can address the remaining questions under the actual site conditions.
A survey is planned on the basis of the defined task and the site conditions. Existing utilities, structural remains or other interference may affect interpretation. Selecting the suitable method and any additional steps requires a specialist decision. A historical photograph description does not in itself determine a particular survey method.
For method selection the investigation objective and required depth range are assessed against the local survey conditions. Ground composition, fill, metal utilities, installations and structural remains can limit interpretation. These limitations are documented with their locations; specialist planning determines the additional work required. For excavations, piled foundations, retaining structures or deep utility works, the proposed ground works are therefore described by location and depth. Any required deep survey or borehole clearance remains specific to that task. Preparation of access for investigations is also agreed with the specialists. If a survey point or foundation depth changes, existing results are compared with the revised plans.
Where areas or depths remain uninvestigated, these limitations must be taken into account in the next steps. A clearance plan can specify the measures and evidence required for the project. According to the DGUV FAQ, visual observation alone during excavation does not meet the state of the art. Particularly where areas are difficult to access, the proposed solution should be justified rather than adopting an unsuitable measure solely because of time pressure.
For tendering, research, technical investigation and any necessary further work are described with their respective purposes. State the available findings, affected areas and depths, and the reports and site plans required. Access, building entrances that remain in use and operational work windows are among the relevant conditions. For separate construction stages, establish when each area will be available and who will receive the results. Offers can then be compared against the same technical tasks and execution conditions. Subsequent site management receives details of the areas actually treated and the unresolved questions before the work that depends on them begins. Additional ground works or plan changes are assigned to the affected section and agreed as supplementary tasks.
A later reader must be able to understand the basis of the assessment. This includes the documents analysed, their sources and their versions. Limited photographic coverage or an unresolved location must also be documented. Merely stating that historical photographs were examined does not adequately describe the scope of the findings. The initial discussion records the planned ground works and the decision required. The document review relates existing reports and historical evidence to the construction site and identifies missing information.
Historical indications, technical measurement data and the assessments derived from them serve different purposes. They should not disappear beneath a single general note at handover. Record which task was completed and which question it answered. This makes it clear, for example, whether a further investigation was recommended or has already been carried out. Where the underlying information is incomplete, the required historical research and aerial photograph analysis are planned. Method selection takes their results, the proposed depth and the actual site conditions into account.
Compare the documented area with the ground works actually proposed. If an excavation is moved or a structural element is designed deeper, the existing coverage must be reviewed. Existing evidence does not automatically become worthless, but neither does it apply to new areas and depths without comparison. The commissioned survey or suitable supervision investigates the defined areas. The results are assessed with their interpretation limits and assigned to the respective ground works.
Describe the remaining tasks precisely enough for site management to account for them in the programme. These may include a missing appendix or a section not yet investigated. Pass new findings to the responsible specialist planners. A verbal assumption about previous use should not enter construction as an established fact. Reports and site plans document the specialist work carried out. Before subsequent work, the next-step decision identifies where further investigation, records or consultation with the authorities are required.
The explosive ordnance clearance service at the Darmstadt regional administration is responsible for Hessen. To provide information on possible site contamination, it requires a precise plan with the boundaries marked; alternatively, it offers an online application for aerial photograph analysis. Any existing statement and its associated plans should be included in further preparation. Check which area the statement covers.
Hessen’s general provisions require site plans at a scale of 1:1,000 for investigated areas or areas cleared of ammunition. After completion, one copy is submitted to the KMRD. The project file brings together the investigation brief, spatial reference, method, assessment of results and remaining limitations. For clearance work, this includes the clearance record and the actual scope of work. Agree these documents and their recipients when commissioning the work. This keeps the relationship between the technical report and construction plan clear even if site management changes. Later changes are added with their own plan version. Where area clearance or recovery are required, the task, area and responsibilities are clarified before work begins. The clearance documentation describes the actual area, depths and services covered.
FONTANA-EOD carries out the agreed investigation and documentation tasks. Official decisions are made by the respective responsible bodies. For an actual find, the instructions of the responsible authorities apply. The BFR KMR apply directly to federal properties; for other projects, their principles provide technical guidance. An investigation report should clearly document the area covered, findings and remaining limitations.
We assess the planned groundworks against the available documents and their design revision. Before attending site, we agree with you what needs to be investigated, which areas are accessible and what findings are required. If the design or site conditions change, we check whether the agreed scope remains appropriate. The report states what was actually investigated and the limits of the findings. This allows designers and site management to see which findings they can use and where questions remain.
Discuss the investigation taskWe first establish the investigation objective: which question must it answer? We then select a technically suitable method. The availability of a particular device or experience on a similar neighbouring site is not enough to justify the choice of method on its own.
Inaccessible areas and limited conclusions are identified. They do not disappear into a total area figure. Designers and site management can then decide specifically which areas still need attention and when a suitable survey becomes possible.
A new location, additional depth or different construction method is compared with previous results. A familiar project name does not replace this comparison. Feedback is provided before the affected work so that an outstanding question can be included in the sequence.
The technical conclusion remains connected to its location references and appendices. A brief summary helps orientation but does not replace the documented survey scope. This basis is retained even if site management or contractors change.
For technical preparation, the first priority is to be able to locate the document and trace its source. Identify the archive record and the relevant description. Public reuse of an image is a separate matter. The fact that a photograph is available does not grant general permission to publish it.
Understand investigation reports and their limitationsA former business site or demolished building may cover several separate areas. Compare the available information with the current site and ground works plan. Document the locations and any uncertainty. A shared street address alone establishes neither where previous ground works took place nor the scope of a technical investigation. A construction record found later may describe previous use or completed work more precisely. Its actual contribution is assessed according to its purpose, spatial reference and contents.
Understand the service scope
Aerial photograph interpretation is related to the actual groundworks. Its purpose and geographical scope remain distinct from a technical investigation of the ground as it is today.
Understand aerial photograph assessment
The findings, their locations and limitations are handed over together. This makes clear to those carrying out the work which area has been investigated and which task remains outstanding.
Assess investigation reports


Historical assessment, technical investigation and further work answer different questions. In your enquiry, describe the planned ground works and the findings needed to prepare them. For projects in the industrial and infrastructure sector add the operational conditions.
Compare services
Preparation connects the commission, site work and handover of findings. Changes to the project can then be incorporated into technical coordination in good time.
Process and documentationNo. It documents the conditions described at the time. Whether the area shown belongs to your site and what conclusions can be drawn for ground works today require specialist assessment using further records.
A single ground-level photograph does not replace professional aerial photograph analysis. It may provide additional indications, but shows a different area and viewpoint. Its source, date and location must be traceable.
First check the documented task, area and depth, together with the stated limitations. Then compare the evidence with the present project. Alterations alone establish neither that a site is unaffected nor that a complete repeat investigation is automatically required.
Send the current site plan showing the proposed ground works, along with any existing statements, reports and source references. Explicitly identify unknown dates or missing appendices. This helps prepare the next technical clarification. Agree the investigation needed before the affected ground works and clarify any outstanding requirements in the KMRD statement with the responsible bodies.
Stop work, do not touch or move the object and keep others away. From a safe distance, call the police on 110. The City of Marburg also identifies the police and responsible public order authority as contacts; follow the authorities’ instructions.
No. A traceable source reference and the existing description may initially be sufficient. Rights to publish the image must be considered separately.
The uncertainty is explicitly recorded and assessed professionally using further documents. An assumed location is not adopted as a confirmed finding about the site.
The work required depends on the necessary research, the area and depths covered, access and survey conditions. The agreed interpretation and documentation are additional factors. In your enquiry, identify the statements and technical reports already available and the tasks still required. Any fee for official aerial photograph information is considered separately from the cost of private investigation and documentation services.
Send archive references, existing descriptions and older plans.
Mark new ground works and any locations that remain uncertain.
Whether historical aerial photograph analysis, explosive ordnance surveying, surface surveying using GPR, magnetometry or TDEM, deep-ground surveys, downhole surveys, excavation supervision, area clearance or ordnance recovery is needed depends on the location, ground disturbance, depth, ground and existing documents. An early ordnance assessment provides clarity for tendering, programming, occupational safety and construction.
FONTANA-EOD combines its Section 7 SprengG licence, specialists holding Section 20 SprengG certificates of competence, suitable survey and clearance methods, and traceable documentation. Send the site plan, depth of ground disturbance, construction phase and existing documents for an initial technical assessment.