Explosive ordnance survey for commercial areas

Before road construction, utility works or handover of individual plots, we establish which parts of the commercial area have already been investigated. FONTANA-EOD compares existing explosive ordnance documents with the planned areas, routes and intervention depths and plans the necessary surveys and documentation. Send site and plot subdivision drawings with depths, construction sections and existing authority conditions so that investigation requirements can be specified before procurement or earthworks.

Site development

Investigate roads, chambers and utilities.

Plots

Document investigation status for each subarea.

Excavation

Agree specialist supervision and documentation.

Project situation

Establish investigation requirements before site development

When developing a commercial area, existing indications of suspected ordnance are used to establish which explosive ordnance investigations are needed for roads, utility routes, retention systems and subsequent building plots. Each subarea is considered by location, depth and proposed construction method. Earlier results are adopted only insofar as they actually cover the planned ground interventions. Documentation assigns findings, survey limitations and outstanding tasks to the relevant construction sections.

Project references

Selected project examples

Technical terms

Terms for site development, plots and construction sequences

Investigation areas and results are organised by subareas, routes, intervention depths and the documentation required.

Area with suspected ordnance

An area of suspected ordnance is a zone where historical land use, aerial photograph findings, historical documents or the circumstances of a find indicate a need for specialist investigation.

Clarify the term in the project context
Subarea reference

The subarea reference ensures that development routes, plots and subsequent building areas are not conflated in an unclear overall conclusion.

Clarify the term in the project context
Investigation depth

Investigation depth depends on the utility trench, chamber, stormwater retention system, drilling point, foundation or excavation and must be specified before construction.

Clarify the term in the project context
Survey conditions

Surface, accessibility, fill, existing utilities, interference sources and ground structure affect which method is technically appropriate.

Clarify the term in the project context
Communication of findings

Before work starts, it is specified how work is stopped and anomalies reported. If a suspicious object is encountered, the immediate emergency notification procedure applies.

Clarify the term in the project context
Documentation for procurement

Documentation for procurement describes the investigation area, method, limitations and result so that the service scope and construction sequence remain traceable.

Clarify the term in the project context
Land-use history

Compare historical land-use documents with the development plan

For commercial areas, the key question is which previous use is documented or can plausibly be investigated for the specific plot, route or development area.

Previous commercial or industrial use

Documents on former businesses, storage areas and technical installations are checked for indications relevant to the new project.

Traffic and transhipment areas

Roads, rail connections, loading areas and shunting areas are relevant to assessment where they coincide with the current site.

Development across several phases

Commercial areas often grow section by section. Earlier utility or road works may change ground structure and the documentation available.

Fill and terrain remodelling

Embankments, relocated soil and imported material affect both suspected ordnance conditions and technical survey feasibility.

Contaminated-land and ground investigation data

Contaminated-land or ground investigation documents can provide useful information on layers, fill, interference sources and earlier ground interventions.

Plot subdivision and documentation status

Historical indications are assigned to the affected plots or routes. Outstanding questions are recorded for later construction phases.

Aerial photograph reference

Aerial photographs are compared with the current site plan, site boundaries and depth planning, rather than interpreted in isolation.

Documentation limits

If sources are missing or unclear, the uncertainty is carried into further planning as a specialist investigation item.

Have the land-use history assessed by specialists
Applications

Project areas in the commercial development

Where site development, utility works and later building projects take place at different times, investigations and results are assigned to the relevant sections.

Two people with a tablet beside a marked construction area; plans lie in the foreground.

Access roads and routes

Roads, utilities, chambers and stormwater installations often entail linear ground interventions with different depths and construction sections.

Select methods for site-development volumes
Two people discussing plans at a table beside a vehicle on a construction site.

Plots and building sites

With several commercial plots, it must be clear which subareas have already been investigated, which remain unresolved and how documentation is maintained for each construction section.

Prepare documentation for each subarea
Two monitors displaying aerial photographs and maps; further aerial photograph printouts lie on the desk.

Former-use site or redevelopment area

Previous commercial, industrial or transport use may substantiate areas of suspected ordnance that should be assessed by specialists before site development.

Have the land-use history assessed
Two people discussing plans at a table beside a vehicle on a construction site.

Finding and follow-up measure

Survey anomalies assessed by specialists receive targeted further investigation or exposure. If an unexpected suspicious object is encountered, stop work immediately, do not touch, move or expose the object further, leave the immediate area and keep others away without putting yourself at risk. In Germany, notify the police immediately on 110; outside Germany, use the local emergency contact procedure. Further handling follows the responsible authorities' decisions.

Document findings and follow-up measures
Regional context

Prepare commercial developments for the specific location

In commercial areas, explosive ordnance investigation depends on the federal state, municipality, land parcel, suspected ordnance, route alignment and construction section.

Illustrated map of Germany with location markers on a construction site.

Municipality and project promoter

Municipalities, site-development bodies and developers need clear location references for subareas, routes and subsequent building plots.

Check the project region
Project enquiry for ordnance assessment and surveys.

Location-specific documents

Authority conditions, historical documents, aerial photograph assessments, ground investigation data and utility drawings are compared with the actual commercial area.

Have documents assessed by specialists
Documentation and records for explosive ordnance investigation.

Several construction sections

Regional coordination should consider whether site development, plot subdivision and building construction take place at different times.

Document construction sections
Illustrated map of Germany with location markers on a construction site.

Germany and Luxembourg

For projects connected with Luxembourg or involving cross-border project communication, document requirements, responsibilities and reporting procedures are agreed with the parties at the project location.

Establish the operating area
Decision situations

What needs to be established before utility works, road construction and plot handover

Investigation planning identifies the affected areas, depths and results required for each construction section.

Before building or site development starts

Site plans, historical documents, aerial photographs and known authority conditions available early help delineate areas of suspected ordnance. They can indicate which project components should be prioritised for investigation before tendering, ground investigation or site development.

Have suspected ordnance assessed by specialists

Before sewer and utility works

The depth and width of utility routes follow the specific design. Explosive ordnance investigation must address the alignment, width, depth, crossings, existing utilities and planned construction method, rather than only the commercial area's total surface.

Determine suitable investigation for sewer and utility works

Before roads and traffic areas

Temporary roads, access roads, turning areas and parking areas may create extensive excavation and compaction zones. The deciding factor is whether areas can be surveyed in advance or investigation must proceed section by section with construction. Necessary investigations and protective measures are planned before ground disturbance during breaking out, demolition, utility exposure or creation of access routes and working areas.

Coordinate method selection with traffic areas

Before plot handover

When individual properties are later handed over to occupiers, documentation should clearly show which subareas were considered, which depths were investigated and which follow-up questions may remain for later building projects.

Agree documentation for each plot

For existing commercial developments

Existing commercial areas often contain earlier construction stages, infill developments, utility alterations and technical installations. Alteration projects must therefore link the current design with previous uses, available documents and local survey feasibility.

Obtain specialist assessment of the sector context

If a finding or indication of suspected ordnance arises

Before work starts, work stoppage, reporting procedures and notification of site management are agreed. If a suspicious object is encountered, internal notification must not delay the emergency call.

Establish communication of findings before work starts
Investigation by construction section

Assign investigations to construction sections

Investigations and results are assigned to the relevant development routes, plots and subsequent construction projects.

Consider site development first

Sewers, roads, stormwater retention, utility lines and supply routes often start before later occupiers' building projects. Explosive ordnance investigation should therefore distinguish early between the overall site, development routes, traffic areas and individual plots. This produces documentation reflecting the actual construction sequence.

Distinguish site-development investigation tasks

Do not treat plots as one uniform area

A commercial area may contain different land-use histories, fill, interference sources and intervention depths within the same overall site. For later property handovers, it is important to know which subarea was investigated, which method was used and which limitations apply to later occupiers or building designs.

Prepare plot-specific documentation

Include ground investigation

Window sampling, drilling and foundation investigations disturb the ground at an early stage. If suspected ordnance or authority conditions apply, these points should receive an explosive ordnance assessment before work starts. Comparing borehole schedules, target depths and site plans is a central part of this.

Agree deep investigation before ground investigations

Avoid variations through specialist planning

Investigation areas, depths, accessibility and required documentation are described in the tender. Outstanding information and services whose scope becomes clear only after investigation are explicitly identified.

Prepare procurement documents
Coordinate your commercial development with specialists
Project coordination

Update investigation status for new construction phases and occupiers

Results from initial investigations are documented with clear area and depth information for later site development, plot handover, changes of occupier and building projects.

Distinguish development stages

Site development, utility works, road construction, retention, plot handover and new industrial buildings often take place at different times. Documentation should therefore show which step was considered and which later interventions need separate assessment.

Document development stages

Record occupier requirements

Later occupiers of a commercial area often plan their own buildings, access routes, foundations, utility connections or extensions. Existing explosive ordnance documents are compared with the areas and depths of these new projects.

Prepare occupier requirements

Distinguish municipal and private roles

In commercial developments, the municipality, site-development body, developer, contractor and later occupiers may have different documentation needs. For each construction section, it is recorded who provides background information, who commissions the work and who receives the results.

Assess roles with specialist input

Keep the construction sequence adaptable

When routes, plot boundaries or construction dates change, it is checked whether the previous investigation scope still matches the project. This requires clear drawings, traceable reasons for method selection and proper updating of results.

Update drawings and investigation results traceably
Enquire about a commercial development with documents
Decision situations

Plan investigations before each ground intervention

For commercial areas, the specialist focus is on subareas, routes, plots, construction sections and the documentation needed before procurement or excavation.

02

Plot marketing

Developers and municipalities need traceable conclusions about investigated areas, unresolved areas and documentation status.

Prepare documentation for plots
03

Extend an existing commercial area

Extensions encounter old utilities, foundations, fill and operational areas. Survey feasibility must be assessed for the specific project.

Have the existing area assessed
04

Boreholes and ground investigation

Ground investigations and piled foundations need a depth-specific explosive ordnance assessment where suspected ordnance and the intervention indicate this.

Agree drilling points and target depth
06

Procurement of civil engineering works

Clear service boundaries reduce ambiguity in tendering, variations and construction sequences.

Prepare service boundaries
Initial conditions and investigation

Define investigation areas in the commercial development traceably

Commercial areas are often planned in phases. Explosive ordnance investigation must therefore distinguish routes, plots, site-development works, building areas and later documentation requirements.

Plots with different statuses

Individual properties may be at different design stages. Documentation and location references must be unambiguous for each subarea.

Have subareas investigated systematically

Unclear historical or previous use

Indications from former commercial, industrial, railway or storage areas are assessed for their significance to the planned plot and ground intervention.

Assess the land-use history

Ground structure and fill

Fill, imported material, utilities and scrap metal can affect measurements. Methods must take account of these conditions.

Have survey conditions assessed
Technical assessment points

Organise commercial areas by area, route and depth

Investigation planning distinguishes site-development routes, plots and the working volumes of later construction projects.

Route width and depth

Utility trenches, road cross-sections, chambers and stormwater installations must be described by width, depth and construction section.

Different subareas

Plots, traffic areas, green areas and technical infrastructure should not be combined indiscriminately where different ground interventions are planned.

Surface and access

Vegetation, paving, storage areas, fences, utilities and terrain profiles affect which survey or supervision methods are realistic.

Ground structure

Fill, imported material, moisture, cohesive layers or aggregate bodies may change the technical conclusions and method selection.

Construction phases

Phased site development requires documentation distinguishing investigated and unresolved areas for later construction phases.

Documentation handover

For purchasers, site management or civil engineering contractors, location references, investigation depths, limitations and results must be documented clearly.

Procurement and project file

Documentation for site development, plot subdivision and later construction projects

Commercial areas need documentation that not only describes the current commission but also provides traceable support for later subareas, occupiers and construction phases.

Boundaries of construction sections

For commercial areas, documentation should identify which development sections, traffic areas, utility trenches, plots or ground-investigation areas were investigated. Results apply to the areas and depths described. For other sections, it is assessed separately whether existing knowledge suffices.

Service specification for tendering

A reliable tender needs clear information on area, depth, methods, accessibility, interference sources, construction periods and documentation objectives. Preparing these points with specialist input allows items for surveying, borehole investigation, excavation supervision or communication of findings to be described much more precisely.

Documents for later occupiers

In business parks, subareas often later change occupier or client. Documentation should therefore show clearly which areas were investigated, which limits apply to the conclusions and which information must be reconsidered for later building, utility or extension works.

Link ground investigation and explosive ordnance assessment

Ground investigations provide important information but themselves disturb the ground. For borehole points, probes and sampling, existing indications of suspected ordnance and requirements are used to establish whether an explosive ordnance investigation is needed before intervention.

Utility construction and service provision

Electricity, water, wastewater, fibre-optic, heating and gas lines may require different trench profiles and excavations. For explosive ordnance investigation, the actual intervention matters: alignment, width, depth, crossings, launch and reception points and whether the route is accessible and surveyable in advance.

Excavation supervision as part of a construction phase

For areas with limited preliminary investigation, the technical suitability of explosive ordnance detection during construction is assessed. Each working layer is surveyed and evaluated using technical methods before controlled removal in layers with supplementary visual inspection. These steps are repeated down to the agreed excavation base. Working areas, excavation layers, stop signals, authority to issue instructions, findings procedures and documentation are agreed with site management and the equipment operator before work starts.

Findings documentation and follow-up measures

The finding location, work stoppage, notification and further instructions are documented. Do not approach a suspicious object to obtain this information; the emergency call takes priority. These records are important for site management, the client, responsible authorities and later project decisions because they record the course of the measure and agreed next steps.

Updating the project file

A commercial development often evolves over an extended period. Results should therefore be structured for reuse with new plots, variations, additional utilities or later building construction. The project file records the drawing revision investigated and later changes.

Prepare a project file for the commercial development
Documentation

Evidence for the project file, procurement and site management

For commercial areas, documentation must clearly distinguish subareas, routes, construction sections and later follow-up decisions.

Project information

The address, land parcels, site plan, site area, routes, construction section, planned depth and project objective form the basis for specialist assessment.

Historical data basis

Aerial photographs, archival data, historical drawings, land-use history, earlier buildings and known indications of suspected ordnance are brought into a spatial reference.

Technical investigation areas

Areas, grids, borehole points, depths, accessibility, interference sources and survey limitations must be described so that data evaluators and site management can follow them.

Survey and findings data

Survey results, anomalies, findings locations, clearance or supervision measures and photographic documentation are assigned to the project stage.

Evaluation and subsequent decision

The evaluation describes which areas were considered for the next step, where limitations apply and which specialist measure follows.

Project file and communication

Reports, drawings and logs must be clearly structured for clients, site management, operators, designers and the relevant interfaces. After actual exposure or clearance work, the corresponding findings and clearance records are included.

Agree the project's documentation structure
Supporting documentation

What information belongs in plot-handover documents

For commercial areas, documentation must show which sections have been investigated, which depths apply and which documents can be handed over to site management or purchasers.

Subareas and plots

Location references for individual properties, site-development routes, stormwater retention and building areas.

Route and depth reference

Representation of investigated utility trenches, chambers, road profiles, borehole points and target depths.

Methods and constraints

Assessment of surface, accessibility, interference sources, ground structure and possible survey limitations.

Findings assessment

Traceable assignment of indications of suspected ordnance, survey points, supervision measures and subsequent decisions.

Documents for procurement

Structured information for the schedule of services, site management, project file and later construction sections.

Project process

From the development plan to handover of results

The sequence follows the question of which areas, routes and depths require specialist assessment before site development or building construction.

01

Delineate the area and construction section

Plots, access roads, utility alignments, excavations and planned depths are brought together in a verifiable location reference.

02

Review records and the suspected hazard

Aerial photographs, historical drawings, previous land uses, existing expert reports and authority conditions are compared with the current design. Where historical evidence is missing, the required sources are researched and aerial photographs assessed for the affected plots or routes. The resulting indications are assigned spatially to the present design and considered when defining investigation boundaries.

03

Specify methods and priorities

Surveying, borehole investigation, excavation supervision or further assessment are prioritised according to accessibility, depth and construction sequence.

04

Plan work for each section

Investigation is tailored to site-development works, routes, plots or individual ground interventions so that the construction sequence remains traceable. The selected investigation is actually carried out within the agreed sections. Survey data acquired are assigned to the investigated areas and agreed depth reference. Omitted subareas and relevant interference are also recorded.

05

Document findings and limitations

Survey data, indications of suspected ordnance, interference zones and assessed investigation depths are documented for use by site management and the client. The recorded data and findings are evaluated by specialists against the investigation objective and identifiable interference. Outstanding questions and necessary further investigations are identified before results are handed over.

06

Specify the next project step

Results are translated into a recommendation for further investigation, excavation supervision, recovery or documentation.

Technical details

Organise commercial-site investigation section by section

In commercial areas, linear site-development works, plots and later building areas are planned and documented separately according to their different intervention depths.

Before tendering, existing indications of suspected ordnance are compared with planned roads, utilities and construction areas.

Technical assessment begins with the planned land use. An access road, utility trench, stormwater retention basin, building or later piled foundation creates different investigation zones. FONTANA-EOD records the investigations required for sites, routes and plots in the investigation plan. Surface condition, ground structure, interference sources and planned depths are considered. The plan shows where further historical evidence is needed and which technical methods are suitable for the proposed areas and depths.

Routes and construction sections

Development alignments are described by route, width, depth and connection areas.

Plot reference

Individual commercial properties are documented so that later clients and designers can follow investigation status.

Surface and ground structure

Paving, fill, imported material and existing utilities affect method selection.

Procurement and site management

Service boundaries, investigation areas and findings procedures are formulated for use in construction planning and tendering.

Select an investigation

Select methods for site development and individual building plots

Two people discussing plans at a table beside a vehicle on a construction site.

Compare documents by subarea and ground intervention

Documents on suspected ordnance and earlier results are linked to road alignments, utility trenches, retention systems and building plots. Location, depth and construction method are stated for each subarea. This shows the investigation required for the current development phase.

Compare existing documentation by subarea and ground intervention
Person beside a survey instrument on a construction site; a wheeled excavator with drilling equipment stands behind them.

Investigate later foundations and deep special locations separately

Investigation for a site-development trench does not automatically cover deep chambers or later building foundations. Compare these working volumes with the documented areas and depths. Supplementary methods are selected according to ground conditions, technical installations and accessibility.

Assess depth-related investigation
Commercial-area planning

Investigate commercial areas by construction section and ground intervention

Site development, plot subdivision, ground investigations and later building works affect different areas and depths. Investigation follows these working volumes and the results needed for procurement and site management.

Site development before building construction

Roads, sewers, property connections, stormwater retention and utility lines often disturb the ground before building construction. Explosive ordnance investigation must consider these early interventions separately so that later plot decisions are not based on an overly general area assessment.

Determine investigation requirements for site development

Subareas and plots

Commercial areas are often developed in phases. Suspected ordnance, survey feasibility and documentation should therefore be organised by construction sections, plots, traffic areas and utility routes so that documentation later matches actual use and procurement.

Document subareas

Ground investigation and borehole points

Ground investigations, window sampling, piles and foundations may extend deeper than later area-based works. Borehole locations and target depths are compared with existing indications of suspected ordnance before ground interventions begin.

Agree borehole positions

Interference in existing areas

Existing commercial sites often contain utilities, chambers, foundations, steel remnants, fill and paved surfaces. These conditions affect method selection and must be compared in advance with site plans and local accessibility.

Have interference assessed by specialists

Excavation and construction sequence

For areas that cannot be adequately investigated in advance, the technical suitability of explosive ordnance detection during construction is assessed. Technical surveying and evaluation of each working layer are followed by controlled removal in layers and supplementary visual inspection. The steps are repeated down to the agreed excavation base. Working areas, hold points, authority to issue instructions, reporting procedures and documentation are established before work starts.

Prepare ordnance specialist supervision of excavation

Procurement and service limits

Tender documents must identify which areas are to be investigated, which depths are relevant, which methods may be used and what limitations apply. Overly broad service specifications frequently lead to queries during construction.

Prepare service boundaries
Selecting a method

Which method can investigate the proposed working volume

In commercial areas, site-development routes, plots and building areas differ considerably. Methods must distinguish these sections while documenting them as an overall project.

Historical aerial photograph analysis

Useful for spatial assessment of areas of suspected ordnance, previous use, traces of attacks, storage areas and remodelling before technical surveying.

Surface survey

Suitable for accessible areas where surface, interference sources and ground structure indicate sufficient survey quality.

Magnetometry

Magnetometry detects ferromagnetic anomalies in accessible areas. Utilities, rails, reinforcement, foundation remnants, scrap metal and vehicles can obscure survey data in commercial areas. Interpretable areas and survey limitations are documented separately.

TDEM

TDEM records time-dependent electromagnetic responses from conductive objects. The target object, ground conductivity, required depth and technical infrastructure determine suitability for each subarea.

Ground-penetrating radar / GPR

GPR records reflections at material and structural boundaries and can provide supplementary investigation of utilities or installations. Soil, moisture, surface coupling and reinforcement affect data depth. A reflection does not uniquely identify ordnance.

Downhole and deep-ground survey

A relevant component for piles, excavations, shoring, deep utilities and ground interventions extending beyond near-surface conclusions.

Excavation supervision

Where explosive ordnance detection during construction is technically suitable, each working layer is surveyed and evaluated using technical methods. Controlled removal in layers and supplementary visual inspection then follow; these steps are repeated down to the agreed excavation base. Excavation layers, hold points, authority to issue instructions, reporting procedures and documentation are established before work starts.

Ordnance recovery

Survey anomalies receive specialist further investigation or exposure. Recovery of confirmed explosive ordnance is coordinated with the permitted scope of activities and local responsibilities. If an unexpected suspicious object is encountered, work stoppage, distance and immediate notification apply.

Project decisions

Investigate and document the commercial area section by section

The earlier routes, plots and depths are organised with specialist input, the better tendering and construction can be prepared.

Establish suspected ordnance conditions before procurement

The land-use history should be assessed by specialists before tendering and civil engineering works.

Assess the suspicion indicators
Working approach

Assess documents, plan surveys and hand over results

For commercial areas, the focus is on traceable assignment of subareas, routes, depths and construction sections.

FONTANA-EOD assesses development drawings, plans suitable surveys and documents the areas and depths actually investigated. Missing information on area, depth and interference sources is identified before construction. Local coordination procedures are established. For later construction phases, existing findings and areas or depths still requiring investigation are recorded.

Project-specific investigation

Not every area needs the same method. The service scope is derived from suspected ordnance, ground intervention, surface, depth and documentation objective.

State method limits

Interference sources, reinforcement, paving, utilities and ground structure are not disregarded but included in the assessment.

Coordinate interfaces

The client, operator, designers, site management, HSE and responsible authorities receive clearly distinguishable roles and communication procedures.

Consider the construction sequence

Assessment, surveying and excavation supervision are planned to fit construction sections, closure windows and procurement.

Make documentation usable

Reports and drawings are tailored for use in the project file, site management, operator communication and documentation procedures.

Handle indications of suspected ordnance safely

If an unexpected suspicious object is encountered, stop work immediately, do not touch, move or expose the object further, leave the immediate area and keep others away without putting yourself at risk. In Germany, notify the police immediately on 110; outside Germany, use the local emergency contact procedure.

Request a technical review of project records
Coordination

Agree tasks in the site-development project

The client, designers, site management and specialist company agree their tasks before work starts. Authority reporting and decision-making procedures depend on the project location.

Specialist contractor

FONTANA-EOD as the specialist company

FONTANA-EOD assesses documents, carries out commissioned surveying and supervision services, evaluates results by specialist assessment and prepares project-specific documentation.

Client

Project owner and client

The client provides project information, defines the construction objective, area, time window and documentation needs, and coordinates project decisions.

Planning and construction management

Planning and construction management

Designers and site management need clear investigation areas, service boundaries, findings procedures and documentation status for tendering and construction.

Construction execution

Building and civil-engineering contractors

Contractors need organised working areas, stop procedures for indications of suspected ordnance and a clear interface with specialist supervision.

Competent authorities

Explosive ordnance disposal service and authorities

In Germany, the ordnance disposal services of the federal states and the locally competent authorities carry out hazard-response and find-management duties. Their involvement is established for the project location; outside Germany, local responsibilities apply.

The local public order authority and, where applicable, building authority are involved according to their project-specific tasks. Conditions, contacts and reporting procedures are assigned to the affected development sections and plots.

Operations and HSE

Operators and HSE

For industrial and commercial areas, operational safety requirements, exclusion zones, access and internal communication procedures are incorporated into project coordination.

Project images

Commercial areas, routes and construction sections

For site development and later construction projects, existing documents are assessed, suitable investigations planned and their results documented.

Project enquiry for ordnance assessment and surveys.

Industrial and commercial site

Starting point for project-specific explosive ordnance investigation with site, operational and documentation references.

Have the project area assessed
Two monitors displaying aerial photographs and maps; further aerial photograph printouts lie on the desk.

Historical assessment of suspected ordnance

Aerial photograph and document assessment helps delineate areas of suspected ordnance before technical work.

Assess historical documents
Person with a tablet at the edge of a cordoned-off excavation, with an excavator behind.

Provide specialist excavation supervision

Where explosive ordnance detection during construction is suitable, excavation layers are investigated using technical methods and documented before removal.

Agree excavation supervision
Four people in orange high-visibility vests in front of two excavators on a construction site.
Person with a yellow survey cart on a footpath in front of a hedge.

Technical information

Industry and commerce: brochure

Work on industrial and commercial sites combines existing installations, operational processes and new ground interventions. The brochure explains how ordnance assessment is coordinated with these conditions.

1 / 8
Industry and commerce: brochure – page 1

German · 8 pages

Project questions

Frequently asked questions about explosive ordnance investigation in commercial areas

When should a commercial area be assessed for explosive ordnance?

Before site development, drilling and construction, existing indications of suspected ordnance, documents and local requirements are used to establish which explosive ordnance investigations are needed for the planned areas and depths.

Which project areas are particularly relevant in commercial developments?

Typical areas include access roads, utility trenches, chambers, stormwater retention systems, commercial plots, logistics areas, foundation zones, demolition areas and edge zones with previous uses. Each may require different investigation depths and methods.

What documents does FONTANA-EOD need for a commercial area?

Helpful documents include an overview drawing, plot subdivision plan, site boundaries, route alignments, borehole points, planned depths, construction dates, existing utilities, available expert reports, aerial photograph assessments, historical documents and the documentation format required for procurement or site management. Information and conditions issued by authorities are included with their dates, complete attachments and geographical scope.

Which methods may be used to investigate a commercial area?

Depending on the area and ground intervention, historical aerial photograph assessment, surface surveys, ground-penetrating radar, magnetometry, TDEM, deep-ground surveys, borehole surveys, area clearance or ordnance specialist supervision of excavation may be used. Selection depends on accessibility, interference sources, ground structure and investigation depth. Survey limitations are identified for the subareas and depths investigated; results for a site-development route do not automatically cover later foundations.

How is phased site development handled?

Investigations are assigned to construction sections, routes or plots. Documentation shows the relevant investigation status. For later ground interventions, it is checked whether existing results suffice or further investigation is needed.

What are the roles of municipalities, designers and contractors?

Municipalities, developers and designers provide project information and documentation objectives; contractors need clear investigation areas, working windows and procedures for findings. Responsible authorities remain involved through their respective reporting and decision-making procedures.

Can an investigation make costs and construction easier to plan?

Investigation areas and depths specified early help describe the service scope for quotations and tendering. Outstanding information and possible further investigations are identified separately. Effort and cost depend on area, depth, methods, accessibility and the documents available.

What should be done if a suspicious object is found during earthworks?

Stop work immediately in the affected area. Do not touch, move or expose the object further. Leave the immediate area and keep others away without putting yourself at risk. In Germany, notify the police immediately on 110; outside Germany, use the local emergency contact procedure. The responsible authorities determine further action. Inform the client and site management; internal notification must not delay the emergency call.

Documentation in commercial developments

Hand over results to the site-development body, purchasers and site management

Handover includes the areas and depths investigated, results and remaining limitations. For later civil engineering works, it must be clear which questions remain unresolved.

01

Area references

Documentation must show which sites, road alignments, utility zones, stormwater retention areas or extension zones formed part of the investigation. When individual properties are marketed, documents are assigned to the relevant plots and passed to those involved.

Agree documentation for the project file
02

Ground-intervention reference

A commercial area contains different intervention depths: shallow formation levels, utility trenches, chambers, foundations, borehole points, ground investigations and possible demolition zones. Explosive ordnance investigation should consider these interventions separately so that conclusions from one investigated subarea are not extended too far to other works.

Select methods for different ground interventions
03

Follow-up for construction phases and operation

Initial site development is often followed by building construction, external works, utility connections, charging infrastructure or later extensions. Reliable documentation therefore not only assesses the current construction section but also records which documents can be consulted again for later changes of use, property sales or planning applications.

Have documents for the commercial development assessed
Preparing an enquiry

FONTANA-EOD needs these drawings and details

For commercial areas, location, plots, routes, construction sections, planned depths and the documentation required for procurement or site management are central.

Area and subareas

Overview drawing, plots, routes, development sections and site boundaries.

Planned interventions

Utility trenches, chambers, road construction, stormwater retention, borehole points and building areas.

Available documents

Aerial photograph assessments, historical documents, ground investigation data, existing utilities and authority conditions.

Project objective

Procurement, site management, plot handover, start of excavation or subsequent technical decision.

Submit project details together

Send the available documents as completely as possible. Incomplete data can also be assessed if the project location, area, planned intervention and desired next step are identifiable. FONTANA-EOD checks which investigations are needed, which methods are suitable and which information is still missing.

Telephone

+49 (0) 6843 - 999 499 7

Email

info@fontana-eod.de

Project documents

Site plan, depth, construction phase, suspicion indicators

Contacts

Site management, designers, HSE or project management

Have project documents assessed
Project enquiry

Have your project assessed

Whether historical aerial photograph analysis, explosive ordnance surveying, surface surveying using GPR, magnetometry or TDEM, deep-ground surveys, downhole surveys, excavation supervision, area clearance or ordnance recovery is needed depends on the location, ground disturbance, depth, ground and existing documents. An early ordnance assessment provides clarity for tendering, programming, occupational safety and construction.

FONTANA-EOD combines its Section 7 SprengG licence, specialists holding Section 20 SprengG certificates of competence, suitable survey and clearance methods, and traceable documentation. Send the site plan, depth of ground disturbance, construction phase and existing documents for an initial technical assessment.