Project pathway
The quickest route to the right decision.

The building application has been submitted, a foundation plan has since changed and the aerial photograph analysis is in another file. These documents must correspond before groundworks. FONTANA-EOD helps clients and design consultancies with construction projects in Unna compare existing knowledge with proposed interventions and describe the specialist task clearly.
Identify the relevant drawing with its date.
Pass results on with their maps.
Clarify new areas and depths before construction.
For your construction plans in Unna, the intervention plan, existing reports and current changes must correspond. We compare the actual investigation scope with the approaching construction work. Missing appendices and different plan revisions are clarified explicitly before further specialist work.
Explosive ordnance survey – Unna – Railway station, tracks 1/2 – Nolte, 21.07.–30.09.2026 Unna
Service period: 2026-07
Service areas:Surface surveys: GPR, TDEM and magnetometryMethod used in this project: Ground-penetrating radar

Unna is the administrative centre of the Unna district within the Arnsberg administrative district in North Rhine-Westphalia. Unna's current service information identifies the Ordnungsamt, General Regulatory Law section, for an informal aerial photograph enquiry, along with the state service of the Arnsberg district government. The building control page describes digital applications separately. For your project, the respective documents and responses are brought together with their actual purposes identified.
For specialist preparation, the property, construction area and adjoining working spaces are distinguished on the site plan. An excavation pit may, for example, have a different scope from an access route, building utility connection or lateral retaining works. Assign the relevant report and proposed intervention depth to each area. Works outside the construction property receive their own location information. For a project in the surrounding area, the local contact follows the actual project address. Responses from the Unna procedure remain linked to their property and file reference. Responsible people and the respective documents required are identified for follow-up questions. Further project locations are shown in the regional overview.
For digital applications, Unna's building control page refers to Bauportal.NRW. Private individuals need a BundID; companies may use the business account. Before submission, the appropriate application type, responsible people and any power of attorney required are clarified. Related pages may form one file; individual construction documents are generally supplied separately. Files receive traceable names. The specialist project file records the version submitted and any addition still outstanding. If a further report is added, its purpose and relationship to previous plans are identified. Site management receives the status relevant to its works together with the associated investigation results. Submission confirmation, official response and specialist report remain allocated to their respective procedures.
The City of Unna describes the aerial photograph analysis application as an informal enquiry to the Ordnungsamt. Its building control page separately explains digital submission of building applications through Bauportal.NRW. For construction projects, both procedures are recorded separately with their file references, documents and responses.
The article “Retter der Stadt” in Herbst-Blatt No. 99 of June 2020 reports air raids on Unna's town centre and damage to the town church in the final months of the war. For present-day construction tasks, such historical indications are compared with images from that time and the areas actually used. Subsequent reconstruction, demolition or infrastructure works are considered with their own dates. Available documents must identify which earlier use or ground change is documented for the specific property. Outstanding questions for historical analysis and further investigation are derived from this.
For digital construction documents, the city identifies fully legible files and traceable file names. Individual documents should generally be uploaded separately; related pages may remain in one file. The same care helps specialist coordination: a report whose map is missing, or a plan without an identifiable revision, permits only limited assessment.
The Unna City Archives hold administrative records, maps, plans and photographs, together with other contemporary historical sources. Research brings together the present address and any earlier street or property names. A historical image and current site plan may show different building conditions or area boundaries. Allocation therefore considers identifiable reference points and chronological sequence. Traceably researched findings are linked to existing aerial photograph analyses. Official aerial photograph analysis is arranged through the responsible local office.
For the commissioned work, the applicable technical requirements, permits, competence and responsibilities are clarified. The actual scope of work is what matters. Tasks and interfaces are described for the project and checked against the required authorisations.
The risk assessment, work areas and communication arrangements must suit the planned activities. Specialist explosive ordnance work is coordinated with the other construction activities. Site organisation, traffic safety and other technical assessments retain their own responsible parties. Joint coordination assigns the relevant specialist work and responsibilities to the affected construction sections.
A measurement anomaly first requires specialist assessment; its appearance alone does not identify it as explosive ordnance. If an object is genuinely suspected to be ordnance, the prescribed reporting procedures and the measures set by the responsible authorities apply. Investigation reports specify the work completed and its limitations, so that results are not extended to unexamined areas or later design changes.
The City of Unna’s “Explosive ordnance” service describes the informal aerial photograph enquiry to the Ordnungsamt. The municipal building control page explains the separate digital building application and allocation of documents supplied later.
The principles of clearance planning connect the investigation with its subsequent treatment. The geophysics guidance in the BFR KMR supports technical method selection. The documentation requirements relate results to the areas actually worked. The North Rhine-Westphalia Ministry of the Interior explains state explosive ordnance disposal.
The BFR KMR describe specialist work on federal properties. For construction projects in Unna, local requirements and responsibilities are determined separately.
The permit, qualifications and responsibilities for the specific activity are assessed under the Explosives Act and the First Ordinance to the Explosives Act. The risk assessment under Section 5 of the Occupational Safety and Health Act relates to the planned activities. The DGUV Information 201-027 addresses preventive investigation and clearance of conventional explosive ordnance and defines its scope. The references it explains to DGUV Regel 113-003 concern specific activities involving explosives; they are not applied indiscriminately to every construction investigation.
For private activities in North Rhine-Westphalia, the specific requirements of the exceptions under the KampfmittelVO and the official guidance must be observed. The private contract connects technical suitability with the scope provided for in law. The authority's state of knowledge and the permissions required for the activity are checked before an agreement.
The client describes the project and provides the available project records. The operator adds requirements for use, access and timing. A coordinating contact brings the parties together; individual tasks remain assigned to the named parties. Before commissioning, it is clearly recorded what information is missing, who will obtain it and what decision the result is intended to prepare.
The specialist designers describe areas, depths, construction methods and changes. Site management coordinates the planned sequence with the construction contractors and agreed specialist works. Results are assigned to the respective intervention. A technical plan change is communicated early enough for its effect on the survey task to be assessed before construction. Organisational construction stage boundaries remain distinguishable from technical survey boundaries.
The private explosive ordnance specialist carries out the agreed investigation and documentation work. Requirements and decisions of public authorities are addressed with the responsible bodies. The documents needed for a particular procedure depend on the location and project. The technical report describes the work carried out, including its documented area, depth and scope. Decisions reserved for public authorities are made by those authorities.
For aerial photograph enquiries within the city, Unna's Ordnungsamt, General Regulatory Law section, is the local contact. The state explosive ordnance disposal service at the Arnsberg district government performs its tasks through the official interface. For a permissible private commission, the specific specialist task, authorisations required and result documents needed are clarified. In the event of a find, hazard prevention and further measures are led by the competent authorities. Project participants record which response is needed before each construction phase. Any need for ordnance recovery is coordinated with the permissible task and the competent authorities.
Legible files enable processing but do not yet demonstrate a completed investigation. First, it is clarified which findings exist for the proposed intervention and which are missing. Further needs are derived from this. Technical method selection then considers the question and actual conditions at the investigation site.
Assess historical documentsThe agreed scope describes the findings required and underlying plans. Official tasks remain separately identifiable within the process. For private activities in NRW, legal prerequisites and authorisations required are checked. Successful transmission of a document replaces neither an outstanding decision nor a necessary investigation.
Compare investigation methods
The date and plan designation must show which drawing is to be used for the next step. Older versions remain distinguishable as predecessors. When a change occurs, its content is also explained. The parties thus work with the same intervention rather than merely similarly named files.
Document findings and their limitations
Without a map or explanation, specialist findings may lose their spatial reference. Therefore attach all related parts in full. Missing appendices are identified explicitly. Subsequent work can then clarify whether the document covers the proposed area and which limitations must be considered.
Document findings and their limitations
Record file references and contacts separately for each procedure. A new document must identify the question it answers. Communication is coordinated where several parties are involved. The version actually considered and the response still outstanding thus remain traceable.
Coordinate the sequence and tasksThe specialist service is selected according to the specific investigation question and proposed ground intervention. Which activity may be privately commissioned within the specific NRW procedure is clarified separately before agreement.
For the Unna commission, the relevant intervention drawing and existing analyses are compiled with their respective appendices. A foundation changed after the building application is identified clearly against earlier versions. This allows it to be established whether documents first need interpretation, additional ground volumes need investigation or assessed findings need further work. The specialist service and result documents required receive a specific scope. The informal aerial photograph enquiry and digital building application retain their own procedures. Transmission of files does not yet describe a completed specialist investigation status.
Define the specialist taskBefore the investigation appointment, actual survey areas, access and available utility information are clarified. Preparation refers to the explicitly identified current plan revision. Preparatory work required depends on the method and site. Additional opening-up work or other ground interventions to create survey access are coordinated technically with the responsible parties and are not undertaken independently. Other trades receive the information needed for their interfaces. Older drawings and changes submitted later are linked so that the construction work actually approaching remains traceable.
Clarify preparatory work in the programmeThe commission records which version of the construction task is addressed and which results already exist for it. Partly accessible areas and missing prerequisites are considered within the scope. Effort and dates depend on actual access, documents and coordination; interpretation and handover are part of the process. Outstanding responses are assigned to their respective procedures. A file receipt confirmation is distinguished from official information and a technical results report. Plan changes are compared with the agreed commission before additional specialist work.
Discuss the scope and scheduleIdentify the property and draw the proposed groundworks. A building application may encompass more than the area of an earlier explosive ordnance investigation. Therefore check not only whether the address and file reference match but also which subareas the documents actually describe.
Add proposed depths for the excavation pit, foundation and connections. The reference to ground or design elevation must be identifiable. If two drawings use different elevations, that difference must be clarified before construction. An unchanged building name says nothing about unchanged intervention depths. Ground structure, utilities and other metal installations may affect the method and findings achievable. Specialist planning considers these survey conditions.
Attach maps, appendices and explanations for existing investigations. An email containing abbreviated findings does not replace the report. Comparison requires a traceable record of the works carried out, areas covered and limitations applicable to further planning. Anomalies and possible interfering objects are assessed by specialists. Limitations and outstanding questions remain identified in the survey report.
Record who maintains current plans and who can answer questions about older reports. This allocation helps when additions are needed because documents are missing or contradictory. The respective specialist leads perform their tasks; official decisions are made by the competent authorities.
Hand reports over with their associated maps and the relevant design. A short status message is often insufficient for subsequent technical comparison. The limits of existing knowledge remain identifiable. New participants can thus assess what is already evidenced for current construction.
A document overview links file name, date and content to the work area concerned. An aerial photograph analysis includes its associated area boundary and the assessment supplied. For technical investigations, the results report, site plans and documented limitations are supplied together. If an appendix is missing, that item remains explicitly outstanding at handover. The origin of a drawing supplied later also remains identifiable. Subsequent work can thus start from the correct version and obtain the information still needed specifically. The site plan, cadastral parcel and construction area or route must correspond clearly.
If an intervention is relocated or deepened, the change is compared with the previous investigation scope. The resulting assessment belongs in the current project status. An addition must not remain solely in one planning file. The parties affected need the traceable connection between change and result.
At handover of results, areas actually addressed are distinguished from outstanding positions or those with limited interpretability. Site management receives the reports and maps relevant to its construction work. If a route is extended later, the new section is compared with the documented scope. The same applies to additional depth or a changed foundation. The resulting specialist task is assigned a responsible person and linked to the relevant construction phase. A later change of participants takes over this overview together with the complete result documents. In the results file, initial data, survey data, survey results and assessment of findings are assigned to their spatial reference. If clearance was carried out, the associated clearance record supplements the evidence chain. Conclusions for the following construction section are derived from this.
Collect the relevant plans and existing results with their appendices. Identify missing parts and contradictory information. The specialist task is related to a shared status. Only then can it be determined meaningfully which additional work is needed for the approaching groundworks.
Site management receives the results and limitations relevant to its work area. Later changes are assessed again. Record which documents concern each construction phase. The knowledge actually achieved thus remains traceable even if several companies work on the project consecutively.
Historical aerial photograph analysis and other earlier records help establish the spatial basis of a suspected hazard. Images, interpretive capability and area boundaries considered are linked to the present-day intervention drawing. An absence of visible findings is not a technical investigation of the present-day ground. The analysis is brought together with other knowledge and actual construction work. If the plan changed after the enquiry, it is assessed which parts the existing analysis covers. The date of the historical image and date of the current design remain identifiable as different time references.
Understand aerial photograph assessmentMagnetometric methods detect magnetic anomalies. Suitability is assessed using expected objects, ground conditions, interference and the investigation area required. Fences, utilities and existing structures can affect interpretation. Signal strength alone does not identify explosive ordnance. Surveying, assessment and necessary further clarification are linked to the current construction task. The results report shows the area actually addressed and its conditions. A foundation plan changed later is compared with this scope, not merely with the name of the overall area investigated.
Understand the scope of magnetometryElectromagnetic investigations may be suitable for certain metallic target objects and site conditions. Selection considers the findings required, accessible survey areas and interfering installations, rather than equipment availability alone. Results receive a spatial reference and information about actual investigation conditions. Whether a supplementary method is needed follows from assessment and the outstanding task. Allocation to the relevant construction design remains documented. The same file name or project name does not, by itself, confirm matching ground volumes.
Understand electromagnetic surveyingUnder suitable conditions, ground-penetrating radar can provide information about subsurface structures and reflections. Ground conditions, moisture and installations affect interpretability. A reflection is not automatically explosive ordnance; an area without anomalies does not confirm any arbitrary depth. Specialist interpretation and limitations are documented with the commission. Before an existing radar plan prepared for other purposes is used as explosive ordnance evidence, its objective and scope are assessed. Where several file versions exist, the basis actually assessed is assigned to current construction plans.
GPR and limitationsFor deeper interventions, it may be necessary to assess whether investigation from the surface can provide the findings required or whether another approach is needed. Current positions, depths, reference elevations, borehole layouts and known utilities then form part of preparation. Creation of suitable investigation access is planned by specialists. A standard grid or general depth figure does not replace this task. Results remain bound to the ground volumes actually addressed and method used. If a foundation is relocated or deepened later, the change is checked by specialists before the work concerned.
Prepare deep interventionsIf a necessary advance investigation cannot be completed in full, it is assessed whether a specialist-planned approach accompanying construction is suitable. Investigation, interpretation and communication of findings are linked to the current construction programme. Visual observation of excavated material alone does not replace a necessary survey. Site management receives the allocation of specialist work, new knowledge and outstanding areas to the proposed activities. Revised construction documents are passed on with their revision so that specialist work and actual construction describe the same task.
Agree the approach during constructionA historical aerial photograph analysis is considered with the other information available. Its result must be related to the area identified. Further investigation needs depend on the specific project and applicable requirements, not merely on a document already being in the construction file.
For comparison of different drawings, scale, north direction and elevation reference are identified. A site plan shows the proposed area, while a foundation or section drawing clarifies the depths concerned. If the depictions do not agree, the difference is clarified before further work. For a relocated excavation pit, retaining works, slopes and connecting areas are also considered. A shaft added later may occupy ground not previously considered. Specialist planners therefore describe the change using actual working spaces and the findings required for them.
In the digital procedure, the submitted version and later change remain distinguishable. Technical assessment records whether a new drawing fully replaces an older plan or adds only a subarea. Where several specialist designs exist, buildings, drainage and utilities receive the same traceable reference points. An older investigation plan is kept alongside with its own boundaries. The presentation then shows where existing knowledge covers the new plans and which additional question needs work. Those carrying out the works receive the relevant document revision.
For a survey, the actual conditions matter as well as the question. Existing utilities, foundations and access therefore belong in preparation. A digitally legible plan can convey this information; it does not, however, demonstrate that a particular method can provide the findings required everywhere.
In the clearance plan, necessary investigations and construction steps are coordinated. Record which results are needed before a particular construction phase. A date in the construction programme alone does not confirm that the associated ground intervention has already been sufficiently clarified.
Initial contact describes the construction project, existing documents and decision required. Reports are brought together with their maps and the current location and depth plans. Missing appendices and contradictory versions are identified. Unresolved historical information is researched and assessed by specialists using suitable records and images. The required official aerial photograph analysis is arranged through the Ordnungsamt. Its findings are assigned to the intervention area actually proposed.
The plans relevant to further work are identified clearly. A relocated excavation pit, additional shaft or deeper foundation is shown as a specific change. Specialist investigation needs follow the outstanding questions and applicable requirements. Methods, survey scope and preparatory work are determined considering target objects, ground conditions, depth, interference and accessibility. The parties and competent authorities clarify their respective tasks before execution. For additional construction documents requested, the file reference communicated and digital communication route specified by the City of Unna are used. Additions to the explosive ordnance procedure are assigned to the relevant plan revision and outstanding specialist question.
Once prerequisites are clarified, the agreed investigation or technically suitable supervision is carried out. Data and observations obtained are interpreted and assessed for their significance to the intervention described. Actually accessible positions and those with limited interpretability remain distinguishable. Changes in site conditions are coordinated with the responsible parties. Assessment identifies usable knowledge, anomalous findings and outstanding questions. The next specialist or official step follows from this.
Reports and maps document the scope actually addressed, results and their limitations. Site management receives the documents relevant to its area. Before the work concerned, the construction plan and documented findings are compared. Changes to location, depth or construction method are assessed again. The subsequent decision identifies additions or coordination needed for the next construction section. Even if contractors change, the plan revision and investigation scope remain traceable together.
Documentation includes the areas actually addressed, works carried out and results derived from them. At handover to another design consultancy, this context should be retained. A single marking without a legend or a sentence without its report can conceal the spatial and technical limits of the findings.
FONTANA-EOD addresses the agreed specialist commission. The local regulatory authority and responsible state explosive ordnance disposal service retain their duties. The BFR Kampfmittelräumung provide principles for planning and documentation; they apply directly to federal properties. For other projects, they serve as technical guidance alongside the respective applicable requirements.
FONTANA-EOD addresses the agreed specialist task for the explicitly identified Unna plan revision. Existing reports and official responses are incorporated with their appendices and limits of findings. Before work begins, accessible areas and results required are coordinated. Changes to plans or site conditions are checked before the work concerned. The report documents the work actually carried out and its limitations. Site management can relate the findings to the current activity and identify clarification still needed. Separate application procedures retain their respective functions.
Discuss the investigation taskMethod selection starts with the knowledge needed for the current intervention plan. Specialist planning considers existing results and actual conditions. Available equipment or a similarly named neighbouring project does not suffice as the sole basis for selection. Revised drawings are assessed for their effect on the ground volume. The approach is justified for the specifically described task. Merely transmitting a plan does not replace this technical decision.
Inaccessible areas and areas with limited interpretability are identified with their boundaries in the relevant spatial reference. Site management can assign proposed activities and additions still required to them. Information on the whole construction area is supplemented by these outstanding tasks. Planning and construction teams coordinate when a suitable investigation will be possible. Where several report and drawing revisions exist, the ground volume already assessed and the change not yet covered remain identifiable.
A new location, additional depth or different construction method is compared with existing results before the work concerned. Specialist planners receive the revised design with its date and identifiable difference from the previous status. Their response and additions required are assigned to the ground volume concerned. An unchanged file reference or continued file name does not, by itself, confirm an unchanged investigation task. The next activity is prepared using the plan revision actually relevant.
Reports and plan appendices are handed over in full with their corresponding drawing revisions. An overview may allocate official procedures, existing results and outstanding tasks. It does not replace the documented investigation scope. Submission confirmation, official response and specialist report retain their respective functions. If site management or companies change, the documents describing the specialist works carried out and their relationship to present proposed construction remain traceable.
It helps trace submission of a document. The specialist findings already available, by contrast, follow from the corresponding results. Keep these two statuses separate. Further planning can then identify whether a response is merely awaited or usable findings about the intervention already exist.
Understand investigation reports and their limitationsAlso identify the areas, structural elements or depths changed. Technical assessment can then focus on the difference from the previous scope. A traceable change description helps coordination between designers and the construction team. The current design is then recorded with the results applicable to it.
Understand the service scope
Aerial photograph interpretation is related to the actual groundworks. Its purpose and geographical scope remain distinct from a technical investigation of the ground as it is today.
Understand aerial photograph assessment
The findings, their locations and limitations are handed over together. This makes clear to those carrying out the work which area has been investigated and which task remains outstanding.
Assess investigation reports


Historical assessment, technical investigation and subsequent work answer different questions. In your enquiry, identify the planned groundworks and the information needed to prepare them.
Compare services
Preparation connects the commission, site work and handover of findings. Changes to the project can then be incorporated into technical coordination in good time.
Process and documentationAccording to the City of Unna's service description, an informal enquiry may be submitted to the Ordnungsamt. Use the current contact options identified there and clarify the information needed for your project. Coordinate needs in good time before proposed ground interventions. The state service at the Arnsberg district government supports the local authority within its remit.
The city's information describes the digital building application and explosive ordnance enquiry separately. Clarify the documents needed for each procedure. Successful file transmission does not, by itself, demonstrate completed explosive ordnance assessment. Specialist comparison requires complete reports with their maps and the current intervention plans.
Identify the change and compare the new intervention with existing results. Whether additional steps are needed depends on location, depth and previous coverage. Do not pass revised plans unchecked to the construction team as an already investigated scope. The method used and site interference limit the findings available for additional areas or depths.
Technical assessment requires the complete findings and their spatial reference. Therefore also supply maps, appendices and limitations. An abbreviated message cannot reliably convey this information.
Stop the affected work and keep your distance. Neither touch nor move the object; keep others away. Immediately notify the police on 110 from a safe distance and follow official instructions.
Submission of the document concerned. It does not demonstrate a specialist assessment or investigation already completed. The specialist process proceeds from document assessment and required historical analysis through method selection and investigation to assessment and documentation. Results are checked against the plans before follow-on works.
The method, investigation scope, depth, interference and access determine the effort required. Missing documents or necessary preparation are considered during coordination. For commissioning, agree the specialist service and required result documents with their specific scope. Cost allocation is clarified with the responsible parties under the respective procedure.
Relevant results and limitations are assigned to the respective work areas. Changes and outstanding questions are passed to the parties affected. A revised plan requires a clearly identified version and a description of the location, structural elements or depths changed. Its effect on existing results can then be assessed specifically.
State the date, plan revision and known changes to proposed interventions. Add the project address, cadastral parcel, official letters and complete analyses with their appendices. The sector overview explains typical interventions and the documents they require.
Send complete results including maps and appendices. Identify the groundworks approaching first, additional subareas and people responsible for follow-up questions. Also identify proposed access and areas not yet accessible.
Whether historical aerial photograph analysis, explosive ordnance surveying, surface surveying using GPR, magnetometry or TDEM, deep-ground surveys, downhole surveys, excavation supervision, area clearance or ordnance recovery is needed depends on the location, ground disturbance, depth, ground and existing documents. An early ordnance assessment provides clarity for tendering, programming, occupational safety and construction.
FONTANA-EOD combines its Section 7 SprengG licence, specialists holding Section 20 SprengG certificates of competence, suitable survey and clearance methods, and traceable documentation. Send the site plan, depth of ground disturbance, construction phase and existing documents for an initial technical assessment.