Project pathway
The quickest route to the right decision.

An older report is available, but does it also cover the extension, shaft or demolition now planned? For construction projects in Detmold, FONTANA-EOD helps compare investigated areas and documented limitations with the new groundworks. This establishes which findings can be used and what still needs clarification before construction.
Read the investigation areas and attachments in full.
Keep uninvestigated areas identifiable on the plan.
Compare location, depth and construction method with the result.
For your construction project in Detmold, we assess which findings existing ordnance documents actually contain. Investigated areas, previous survey limits and new groundworks are compared clearly. This enables further specialist needs to be identified without transferring an old partial finding to the entire property.

The current Detmold service portal identifies the Public Order team for ordnance checks and describes cooperation with the Westfalen-Lippe explosive ordnance disposal service. A clear site plan, the specific construction plan and, where applicable, an authorisation are required. Existing older reports are assessed together with the current works; successful submission of an application is not yet an investigation result. Alongside the address, the enquiry identifies the construction phase affected and existing file references. The service portal specifies an approximate processing time of eight weeks; this does not establish a promised deadline for an individual project. Agree the response date needed with the competent authority early and identify outstanding alternatives so that the documents match the actual construction task.
The overview of the Detmold administrative district provides further local information for the regional context of your construction project.
Detmold's explanatory statement for development plan 01-83/A, Adenauerstraße/Teilbereich A, describes earlier ordnance checks in Section 13.5. It distinguishes investigated locations of suspected ordnance from areas where existing structures or earthworks already carried out prevented measurement directed at the required findings. The description relates to that planning procedure and the earlier investigations described in it. The investigation of suspected locations in 2015 described there is read together with the areas explicitly identified as uninterpretable. When reusing such information, the investigation date, actual spatial scope and condition of the site are recorded. A map marking remains linked to its associated findings. For a present-day enquiry, existing results are compared with the newly planned extension or utility section.
The town archive describes Detmold as a town whose historic appearance largely survived the Second World War. In early April 1945, National Socialist rule there ended with the arrival of American troops; British occupation followed. For a construction project, local histories of use and alteration are linked with property records and historical findings. A largely preserved townscape does not answer the specific ordnance question for a construction site.
For a present-day project, the complete findings must therefore be read. A report may contain a result for one part of the site and identify a limitation elsewhere. Omitting these differences from a short summary can easily create the false impression of an assessment covering the entire site. The plan cited provides no result for another property. Demolition can change access to an area without itself providing new investigation data. Likewise, deposited fill or new installations can change comparability with an older measurement. Identify these changes with their timing and known evidence. Further specialist work addresses the specific outstanding question and is agreed in relation to the current groundworks.
For the commissioned activities, the relevant technical requirements and questions of permits, competence certification and responsibility are clarified. The actual planned service scope is decisive. A general company designation does not replace checking that the tasks and interfaces are described appropriately for the specific project.
Risk assessment, work areas and communication must suit the proposed activities. Ordnance specialist works are coordinated with the other construction activities. Operational organisation, traffic safety and other specialist technical inspections retain their own responsible parties. Joint coordination brings the information together without equating the different tasks.
A measurement anomaly first requires specialist assessment; its appearance alone does not identify it as explosive ordnance. If an object is genuinely suspected to be ordnance, the prescribed reporting procedures and the measures set by the responsible authorities apply. Investigation reports specify the work completed and its limitations, so that results are not extended to unexamined areas or later design changes.
Procedure at the site: Town of Detmold: apply for an ordnance check · Town of Detmold: explanatory statement for development plan 01-83/A, Adenauerstraße/Teilbereich A, Section 13.5, pages 22–23.
Planning and documentation: BFR KMR: principles of clearance planning · BFR KMR: geophysics · BFR KMR: documentation · North Rhine-Westphalia Ministry of the Interior: explosive legacy
The BFR KMR are used as technical guidance; locally applicable requirements and responsibilities must be clarified separately.
The permit, qualifications and responsibilities for the specific activity are assessed under the Explosives Act and the First Ordinance to the Explosives Act. The risk assessment under Section 5 of the Occupational Safety and Health Act relates to the planned activities. The DGUV Information 201-027 addresses preventive investigation and clearance of conventional explosive ordnance and defines its scope. The references it explains to DGUV Regel 113-003 concern specific activities involving explosives; they are not applied indiscriminately to every construction investigation.
For private activities in North Rhine-Westphalia, the specific requirements of the exceptions under the KampfmittelVO and the official guidance must be observed. Technical suitability alone does not establish that a private commission is permissible. The information held by the authorities and the authorisations required for the activity are checked before an agreement is made.
The client describes the project and provides the existing project documents. The operator adds the requirements for use, access and timing. A coordinating contact agrees the assigned tasks with those responsible. Before commissioning, a clear record is made of which information is missing, who will obtain it and which decision the results are intended to inform.
The specialist designers describe areas, depths, construction methods and changes. Site management coordinates the planned sequence with the construction contractors and agreed specialist works. Results are assigned to the respective intervention. A technical plan change is communicated early enough for its effect on the survey task to be assessed before construction. Organisational construction stage boundaries remain distinguishable from technical survey boundaries.
The private explosive ordnance specialist carries out the agreed investigation and documentation scope. Official requirements and decisions are clarified with the competent authorities concerned. The documents needed for a particular procedure depend on the location and project. The technical report describes the specialist service performed; its conclusions are not presented unchecked as general authorisation for further groundworks or as an authority's decision.
The documented reason for a survey limit forms part of specialist assessment. Together with the new plans, the findings needed now and the conditions present for obtaining them are assessed. An area previously impossible to survey does not automatically determine one particular follow-up method. Selection is justified for the specific task on specialist and procedural grounds.
Assess historical documentsTechnical feasibility alone does not establish a permissible private commission under the North Rhine-Westphalia procedure. Official requirements and authorisations needed are clarified before an agreement. Existing results remain usable insofar as their scope fits. Missing findings are identified as a specific task and are not replaced by general supervision of construction.
Compare investigation methods
A report is read with its associated map and the area investigated at that time. The address and project name are not always sufficient for allocation. Show the new groundworks plans using a comparable reference. Unclear boundaries are identified before older findings are used for new structures or connections.
Document findings and their limitations
A measurement that was missing or could not reasonably be obtained at that time is retained in the overview with its documented reason. It is not presented as an unremarkable result. For the new construction task, it must be clarified whether the area is affected and what further assessment is needed. Earlier limitations remain traceable until a new documented status is available.
Document findings and their limitations
Known demolition, deposited fill or other earthworks are identified with their timing and existing documents. This information helps compare investigation conditions at that time with the present plans. A changed surface does not produce a new ordnance finding. It may, however, influence the specialist question and conditions for further investigation.
Specialist services and investigation tasksThe investigation objective and suitable methods are determined from the planned construction task and existing findings. Which activity may be commissioned privately under the specific North Rhine-Westphalia procedure is clarified separately before an agreement. For the quotation, the information required, affected area and contributions of other parties are identified. Where a project involves several specialist questions, the ordnance commission is described with its own intended results. Specialist preparation establishes which details are already sufficient and what information is still needed before the work.
For the Detmold commission, existing reports are compiled in full with their plan attachments. A result without anomalies is distinguished from an area that was not investigated or could not be interpreted at that time. Planned extensions, shafts and demolition works are described by location, depth and construction method. This establishes which findings can be used and which ground areas and volumes still need specialist work. The permissible commissioned specialist service and results required receive this scope. A shortened summary does not replace comparison of the actual survey limits.
Define the specialist taskBefore the investigation appointment, the survey areas accessible today, known utilities and interfaces with other trades are clarified. Earlier access obstacles are compared with present-day conditions without inferring from this alone that investigation has since taken place. The preparatory work needed depends on the method and site. Additional breaking of the surface or other interventions to provide survey access are professionally prepared with those responsible and are not undertaken independently. Areas omitted and areas with limited interpretability remain identifiable with their respective reasons.
Clarify preparatory work in the programmeThe commission describes the question still outstanding for the current construction project and the findings already documented. Assessment and handover of results form part of the process. Effort and timing depend on actual access, documents and coordination. The historical distinction between investigated and uninterpretable areas is retained in the task description. Newly obtained results are added after the work. As long as required findings are missing, the relevant ground area and volume remain visible as a further task and are not replaced by a general total-area figure.
Discuss the scope and scheduleCompare the report's maps with the current site plan. Check whether property boundaries, construction phases and marked investigation areas correspond. A similar address or belonging to the same former site is insufficient to assign evidence spatially. For an excavation, for example, the foundation footprint, proposed shafts and lateral utility connections are shown separately. Any axis relocated later is identified by a clear revision status. The specialist authorities involved can then identify which new part of the site needs assessment and which previous details still describe the same groundworks.
Establish from the report what was actually investigated and the depth to which the findings apply. Documented conditions and limitations must also be observed. A result must not be extended to larger areas or deeper structures solely on the basis of a short concluding sentence. Use an understandable reference for existing and proposed elevations. A ground investigation report can provide information on the sequence of strata, but must be assigned to the correct site for this purpose. Where elevations differ or the ground has only been partly investigated, the outstanding question is identified and clarified before the documents are used together.
Carry areas not investigated or only assessable to a limited extent into the working documents. They must not disappear accidentally when a new plan is drawn. This does not yet determine a particular follow-up measure; first, specialist clarification must establish the findings needed for the groundworks proposed there. The overview identifies the date, commission and associated plan attachments for each document. An earlier assessment of another structure is not assigned solely on the basis of a shared address. Specialist planning compares the ground area and volume actually investigated with the new work and records which findings can inform the next decision.
Mark the extension, demolition areas involving groundworks, foundations, utilities and other proposed work. Add depths with an understandable elevation reference. Only this information enables assessment of whether existing findings suffice for the current task or supplementary steps are needed. In the comparison, each new ground intervention receives a reference to the relevant report and its plan attachment. A new connection may lie outside the earlier investigation grid even if the associated building address remains the same. The specialist task is then defined for this additional area. Other results already usable remain in the overview with their actual scope.
The report findings are handed over with maps, methodology and documented limitations. Where clearance work has been carried out, the clearance record with the actual scope and results forms part of this document set; the areas treated remain located in the plan attachments. A shortened summary must not extend the scope actually investigated. When the documents are used later, the new groundworks are compared with it. Outstanding areas remain visible even if other parts of the site already have usable results. The handover identifies the plans used and spatially relevant findings for each construction phase. Site management receives the restrictions affecting its immediately forthcoming work. Outstanding conditions are recorded together with the responsible party and the next step required. When the contractor changes, this information is handed over in full.
For further planning, record which existing findings are relevant and which additional questions arise. The plan revision used remains identifiable. Later changes can then be assessed specifically. A collection of older reports alone does not replace this allocation to the current task and next steps required. A deeper foundation may raise different questions from a simple shift on the site plan. Therefore state the changed geometry and affected documents in each case. Those responsible assess the change within their own specialist remit and bring their findings together with the current design. Any earlier quotation is related to the scope actually agreed.
Bring together complete older results, associated maps and the present design. Identify the proposed groundworks and known changes to existing structures. An overview of outstanding details helps coordination. Further work can then focus on locations where existing findings do not yet answer the current question. For the service description, preparation, possible investigation, interpretation and handover are clearly distinguished. Identify who provides access, utility information and existing reports. Responses still outstanding are also identified with their actual processing status. The enquiry can then focus on the outstanding specialist task and proposed construction phase.
After supplementary work, it becomes clear which outstanding areas now have usable findings. Earlier and new results retain their respective references. Remaining limitations are carried forward. Before construction, site management receives the current status with its associated plans instead of using individual completion notices without spatial context. Before work resumes, the plan revision and report version are checked together. A new site organisation receives the information relevant to its task on investigated, uninvestigated and partly assessed areas. The handover note identifies outstanding questions and the authority or party with whom further work is coordinated.
Historical aerial imagery analysis and other older documents help to place the basis for suspected ordnance in its spatial context. Images, their information value and area boundaries are linked with the current groundworks. The absence of a visible finding is not a technical investigation of the ground as it is today. Other existing findings are included. Older technical reports retain their own survey limits. An uninterpretable part of the site is therefore treated neither as historically unremarkable nor as technically resolved merely because a short summary cites the earlier overall result.
Understand aerial photograph assessmentMagnetometric methods detect magnetic anomalies. Suitability is assessed according to expected objects, ground conditions, interference and the investigation area and volume required. Utilities, fences and existing structures can influence interpretation. Signal strength alone does not identify ordnance. Measurement, assessment and further investigation are planned as a specialist task. An older report is checked to establish where interpretable measurement data were actually obtained. Missing data for an area and an unremarkable result from an investigation carried out there remain different findings.
Understand the scope of magnetometryElectromagnetic investigations may be suitable for certain metallic target objects and site conditions. Selection considers the information required, accessible survey areas and interfering installations, rather than equipment availability alone. Results are documented with their location and actual investigation conditions. Any addition needed follows from specialist assessment. The new work is linked with the limitations of earlier measurements. An area that has since become accessible receives a corresponding additional result only through specialist work actually carried out and assessed.
Understand electromagnetic surveyingUnder suitable conditions, ground-penetrating radar can provide information on subsurface structures and reflections. Ground conditions, moisture and installations affect interpretability. A reflection is not automatically ordnance; an unremarkable area does not confirm conditions at any arbitrary depth. Specialist interpretation and limitations are documented with the commission. A radar report is read according to its investigation purpose and coverage. Its findings are not transferred to an area previously omitted merely because it lies on the same plan.
GPR and limitationsFor deeper groundworks, it may be necessary to check whether investigation from the surface can provide the information required or whether another approach is needed. Positions, depths, elevation references, borehole layout and known utilities are prepared for this purpose. The provision of suitable investigation access is also professionally planned. A standard grid or general depth figure does not replace this task. Results are assigned to the ground area and volume actually investigated. Before older area-based evidence is used for a new shaft, its documented depth reference and method are checked.
Prepare deep interventionsIf a necessary advance investigation cannot be completed in full, it is assessed whether a professionally planned approach during construction is suitable. Investigation, interpretation and communication of findings are linked to the groundworks actually proposed. Visual observation of excavated material alone does not replace a necessary ordnance survey. Site management receives an allocation of specialist work and unresolved areas within the sequence. A previously uninterpretable area is carried into further planning with its actual boundary; new findings arise from documented work, not merely from the removal of an access obstacle.
Agree the approach during constructionA historical aerial photograph analysis may provide indications of past events. A technical investigation, by contrast, addresses a specifically defined task under the respective site conditions. Read the results in context without inferring a complete instrumental investigation merely from the existence of an analysis.
For a survey the conditions now present must be clarified. If a building has been removed, an area filled or a utility newly installed, this may be important for planning. Whether this creates additional investigation needs is assessed on specialist grounds. A change is neither automatically an all-clear nor evidence of ordnance contamination.
The clearance plan describes the steps required for the planned task. An uninterpretable area identified in a previous report needs a traceable further assessment. Merely observing excavation is not a substitute for a suitable investigation or professionally planned explosive ordnance clearance during construction.
Bring together existing ordnance reports, including maps, appendices and additions. Note which plans they were based on. If only a summary is available, the complete report should be requested before findings are derived from it for the new work. For initial contact, state the project address, proposed work and current plan revision. Specialist planning checks existing ordnance reports for their area and depth references, limitations and identifiable gaps. It assigns official notes and investigations already carried out to their respective functions. The document overview identifies which results can be used for the new construction task and which question still needs an answer.
Existing aerial imagery analyses and historical indications are related to the present-day project area. Where the basis is incomplete, the necessary supplementary research or aerial imagery analysis is carried out through the appropriate specialist or official route with its question defined. The findings obtained are assessed together with previous use and current plans to determine investigation needs. An entry in the town's history is first checked for its actual relevance to the property.
For general construction projects, the town of Detmold specifies a site plan clearly identifying the property and a construction plan showing the specific works. An authorisation from the property owner may be required. For specialist coordination, also include available previous reports and information on changes. Investigation planning defines suitable methods according to the findings required, depth of groundworks and actual site conditions. Existing utilities, installations and interference are taken into account. The commission describes its spatial scope and prerequisites for carrying it out. The marked area remains linked to the specific construction task if a foundation or utility route changes.
Mark new areas, different depths and areas not previously covered. Agree which assessment or investigation is needed and who arranges it. The fact that construction has already taken place on the same property does not answer the outstanding questions concerning the new groundworks. On the basis clarified, specialist personnel carry out the investigation or agreed supervision permitted within the respective legal and technical scope. Data are recorded with their location, local measurement conditions and limitations. If conditions change, the further approach is coordinated. A suspicious find triggers the prescribed reporting and hazard prevention procedures.
The data and findings collected are professionally assessed in the context of the investigation objective, method and site conditions. Interference and areas that cannot be investigated remain identifiable. The report documents the work carried out, results, location and depth references, and limitations; maps and attachments remain connected to it. Any further clarification required is assigned to the affected area. A measurement anomaly is professionally assessed and is not identified as a particular object solely on the basis of the measurement signal.
Before the relevant work, site management receives the current results with their associated plans and limitations. A superseded drawing should not continue alongside the new revision as an equivalent working basis. Further changes must be compared with the investigation scope again before the affected groundworks. For the next construction phase, the assessed report and associated plans are handed over together. Site management compares its forthcoming work with the investigated area and documented limitations. Outstanding tasks receive a responsible point of contact and a link to the next groundworks. The plan and report revisions used remain traceable for later additions.
A useful report does not merely state a result; it makes its spatial and specialist context traceable. When findings from several investigations are brought together, different stages of work must remain identifiable. An area without interpretable measurements must not receive the same marking as an area with a documented investigation result.
The town of Detmold describes ordnance checks as cooperation with the Westfalen-Lippe explosive ordnance disposal service. FONTANA-EOD undertakes the specialist scope commissioned and does not replace an official decision. The BFR Kampfmittelräumung provide a specialist basis for planning and documentation; their direct scope is federal property. For other projects, the respective applicable requirements remain decisive.
FONTANA-EOD carries out the agreed specialist task for the construction phase described in Detmold. Before work begins, usable earlier results and findings still required are compared. Accessible areas and results needed are agreed. Changes in planning or site conditions are assessed before the affected work. The report documents the work actually carried out and its limitations. Site management can identify which findings are available for the next groundworks and which area still needs separate clarification.
Discuss the investigation taskMethod selection begins with the information still missing for the current construction project. Specialist planning considers existing results, ground conditions and actual site conditions. Available equipment or the earlier investigation of a neighbouring part of the site is not sufficient as the sole basis. Selection is justified for the ground area and volume described. Previously stated limitations are also read, rather than reducing an old report to its concluding result sentence.
Inaccessible areas and areas with limited interpretability are identified with their actual boundaries and known reasons. Site management can assign outstanding specialist work and additions needed to them. A general total-area figure does not replace this distinction. Planning and construction teams agree when a suitable investigation will become possible. After the work, results and remaining limitations are carried forward clearly. A missing measurement is not retrospectively reinterpreted as a finding with no anomalies.
A new location, additional depth or different construction methods are compared with existing results before the affected work. Any change in existing structures or ground surface since the report is also identified. Specialist planning receives the identifiable difference from the earlier status. Its response and any additions required are assigned to the ground area and volume affected. Demolition can provide access without itself supplying new measurement data. The next groundworks are therefore planned according to the findings actually available.
At handover, reports and associated plan attachments are provided together. Map markings remain linked to their specialist explanation. An overview can list investigated, omitted and partly interpretable areas; it does not replace the documented investigation scope. When planning teams, site management or contractors change, the date, stage of work and limitations remain traceable. Those carrying out further construction receive the findings important for their task in full, preventing an old partial finding from being passed on as evidence covering the entire site.
If a report could not assess an area, this describes the limit of its findings at that time. This information remains relevant to later planning. It means neither a confirmed find nor a completed all-clear. For the new groundworks affected, further clarification needs are determined on the basis of the information available.
Understand investigation reports and their limitationsAn extension or new connection may lie beside an area investigated earlier. A change in depth may also exceed the previous scope. Each significant change is therefore compared spatially and on specialist grounds. The unchanged property address alone is insufficient to transfer earlier results to the new work.
Understand the service scope
Aerial photograph interpretation is related to the actual groundworks. Its purpose and geographical scope remain distinct from a technical investigation of the ground as it is today.
Understand aerial photograph assessment
The findings, their locations and limitations are handed over together. This makes clear to those carrying out the work which area has been investigated and which task remains outstanding.
Assess investigation reports


Historical assessment, technical investigation and further work answer different questions. The service overview helps distinguish these tasks in an enquiry.
Compare services
Preparation connects the commission, site work and handover of findings. Changes to the project can then be incorporated into technical coordination in good time.
Process and documentationThis depends on its investigation scope and the planned groundworks. Compare area, depth and previous limitations with the current construction plan. A report for another construction phase cannot be transferred to the extension solely because it has the same property address. Before the affected groundworks, clarify the procedure required with those responsible.
No corresponding interpretable measurement is available there within the investigation described. This is not equivalent to an unremarkable measurement result. For new work, specialist clarification must establish which findings are needed and how the outstanding question can be addressed under present-day conditions.
For general construction projects, Detmold specifies a site plan clearly identifying the property and a construction plan for the specific works. An authorisation from the owner may also be needed. Existing investigation results with attachments additionally help specialist assessment of the project.
No. The explanatory statement describes earlier findings and investigations in the context of the specified planning procedure. It establishes neither ordnance contamination nor a completed assessment for another property. Use the documents relevant to your own project.
Stop the affected work. Leave the object untouched, keep your distance and keep other people away. From a safe distance, call the police immediately on 110 and follow the authorities' instructions.
The description of results with maps, attachments, investigation scope and limitations. Only these make the relationship to present-day plans traceable.
No. The changed condition may create new investigation opportunities or questions, but does not itself provide a new ordnance result.
Their scope and results are linked to the current plan. Areas with existing findings and those still outstanding remain identifiable in the common overview. The effort also depends on the size and accessibility of the area, proposed depth of groundworks, suitable methods, interference and usable previous findings. Preparatory services, interpretation and documentation required are agreed with their scope for the specific task. Cost information for official hazard prevention is distinguished from privately commissioned services.
Send maps and limitations together with the results texts. For your project in Detmold, the current site and construction plans and existing reports with all attachments are helpful. Identify changed structures, depths and known investigation gaps. On this basis, the specialist clarification required before the next groundworks can be discussed.
Show the current groundworks and known changes since earlier investigations. Also state which earthworks are due to start first and which areas are not yet accessible. This enables the necessary preparatory work and handover of results to be coordinated in time.
Whether historical aerial photograph analysis, explosive ordnance surveying, surface surveying using GPR, magnetometry or TDEM, deep-ground surveys, downhole surveys, excavation supervision, area clearance or ordnance recovery is needed depends on the location, ground disturbance, depth, ground and existing documents. An early ordnance assessment provides clarity for tendering, programming, occupational safety and construction.
FONTANA-EOD combines its Section 7 SprengG licence, specialists holding Section 20 SprengG certificates of competence, suitable survey and clearance methods, and traceable documentation. Send the site plan, depth of ground disturbance, construction phase and existing documents for an initial technical assessment.