Project pathway
The quickest route to the right decision.

For project owners, planners and site management in Osnabrück, FONTANA-EOD coordinates explosive ordnance assessment with the earthworks sequence. Preliminary ground interventions for access roads, temporary installations or site setup are considered together with the main excavation and connections. Send the site plan, intervention depths, construction sequence and existing investigation results for specialist coordination.
Include early ground interventions too.
Schedule surveys before the respective earthworks.
Make results available before the next ground intervention.
The City of Osnabrück distinguishes aerial photograph assessment from investigation of the construction area; the type and scope of surveying depend on the planned measure. Bring together the affected construction section, planned earthworks and their depths with existing reports. A local project reference of our own is the specialist explosive ordnance supervision during construction on Bessemerstraße. Our service page explains how we provide specialist supervision of groundworks. The conclusions of the reference commission apply only to its agreed investigation scope.
Service period: 2026-05
Service areas:Ordnance specialist supervision of groundworks
View project details · Ordnance specialist supervision of groundworks

Specify the actual project location with a site plan and the affected land parcels. Existing information, official conditions and reports are assigned to this area. Osnabrück is in Lower Saxony in the Weser-Ems administrative area. The City of Osnabrück is responsible for explosive ordnance hazard response within the city; information and existing reports are assigned to the specific property and ground intervention. For addresses in the city centre and old town, Schinkel, Wüste, Westerberg, Sutthausen, Dodesheide or Hellern, identify the available documents. For enquiries from Belm, Wallenhorst, Hasbergen, Georgsmarienhütte, Lengerich or the Osnabrück district, provide the complete project address with municipality and federal state. The competent authority is clarified for the actual project location.
The City of Osnabrück’s guidance on explosive ordnance surveying explicitly addresses ground interventions during construction. It distinguishes aerial photograph assessment from investigation of the construction area and states that the type and scope of surveying depend on the proposed measure. An assessment alone is not described there as explosive ordnance clearance for the construction area.
The City of Osnabrück documents the severe bomb hit on the town hall on 13 September 1944. Reconstruction began in 1947 and was completed in 1948. When preparing ground interventions in the historic city centre, the buildings and recorded destruction at that time are compared with later construction conditions. Former basements, excavations and subsequent fill are assigned to present-day intervention areas insofar as files and plans identify them. The position and depth of the work actually planned are decisive.
When preparing construction, also describe work taking place before excavation for the building. If a temporary access road is planned first, followed by service works and then a deep excavation, the areas and depths of each stage are recorded separately. For later tasks, it is checked whether the available results cover the respective intervention. For properties around the station, railway or linear infrastructure sites and transport routes, former construction and land-use phases are compared with the present-day intervention. This also applies to records of older production and storage sites, commercial and industrial sites whose use has changed repeatedly, housing and conversion sites. Information on reconstruction, relocated rubble or terrain changes is spatially assigned to the areas affected.
For the commissioned activities, the relevant technical requirements and questions of permits, competence certification and responsibility are clarified. The actual planned service scope is decisive. A general company designation does not replace checking that the tasks and interfaces are described appropriately for the specific project.
Risk assessment, work areas and communication must suit the proposed activities. Ordnance specialist works are coordinated with the other construction activities. Operational organisation, traffic safety and other specialist technical inspections retain their own responsible parties. Joint coordination brings the information together without equating the different tasks.
A measurement anomaly first requires specialist assessment; its appearance alone does not identify it as explosive ordnance. If an object is genuinely suspected to be ordnance, the prescribed reporting procedures and the measures set by the responsible authorities apply. Investigation reports specify the work completed and its limitations, so that results are not extended to unexamined areas or later design changes.
Local procedures: City of Osnabrück: explosive ordnance disposal and surveying.
Planning and documentation: BFR KMR: principles of clearance planning · BFR KMR: geophysics · BFR KMR: documentation · DGUV: explosive ordnance clearance FAQ · LGLN: explosive ordnance contamination on sites – who does what?
The BFR KMR guidelines are used as technical guidance; the applicable local requirements and responsibilities must be clarified separately. Their defined remit concerns federal projects; their application to other projects is clarified for the specific project.
For work in Germany, the permit, certificate of competence and responsibilities for the specific activity are assessed under the Explosives Act and the First Ordinance to the Explosives Act. The risk assessment under Section 5 of the Occupational Safety and Health Act relates to the planned activities. The DGUV Information 201-027 covers preventive investigation and clearance of conventional explosive ordnance and defines its scope. Its explanations concerning DGUV Rule 113-003 relate to specific activities involving explosives; they are not applied indiscriminately to every investigation for construction. § 7 SprengG concerns the commercial permit for activities requiring authorisation, and § 20 SprengG the certificate of competence of responsible persons. Under § 1b SprengG, searching for munitions that have been found also counts as handling.
The client describes the project and provides the available project records. The operator adds requirements for use, access and timing. A coordinating contact brings the parties together; individual tasks remain assigned to the named parties. Before commissioning, it is clearly recorded what information is missing, who will obtain it and what decision the result is intended to prepare.
The specialist designers describe areas, depths, construction methods and changes. Site management coordinates the planned sequence with the construction contractors and agreed specialist works. Results are assigned to the respective intervention. A technical plan change is communicated early enough for its effect on the survey task to be assessed before construction. Organisational construction stage boundaries remain distinguishable from technical survey boundaries.
The private explosive ordnance specialist contractor performs the agreed investigation and documentation work. Official requirements and decisions are clarified with the respective responsible bodies. The records needed for a specific procedure depend on the location and project. The technical report documents the specialist work carried out and its area, depth and limits of conclusions. The responsible bodies make official decisions concerning subsequent groundworks.
The City of Osnabrück is the local hazard response authority. If explosive ordnance is found, it organises the necessary measures, such as clearing the area and evacuation. Lower Saxony’s explosive ordnance disposal service supports the municipality and carries out its assigned recovery and disposal tasks. Commercial specialist companies carry out commissioned hazard investigations. Contacts, official conditions, reporting channels and the handover of assessed findings are agreed before the affected work.
Aerial photograph analyses, official correspondence and earlier technical reports are related to the current project. What matters is which question each document answers and which spatial area it covers. Analysis of historical imagery must be distinguished from technical investigation of the present ground. If findings are missing or do not match the planned construction task, the further investigation needed is agreed with the specialists.
Assess historical documentsFor the technical investigation, a suitable method is selected according to the objective, depth, ground and interference. A standard device alone does not define an appropriate service. The agreed scope identifies accessible areas and required results documentation. Even for a partial investigation, it must remain clear which area is actually investigated and which questions still require clarification afterwards.
Prepare the survey with the specialists
An investigation is often requested for the later excavation. However, site fence foundations, temporary services, drainage or an access road may disturb the ground beforehand. Describe these tasks with the same spatial care as the main excavation. The first necessary investigation date depends on the first affected intervention. A later excavation appointment does not automatically cover this preparation.
The site setup plan identifies the individual preliminary tasks and shows the ground volumes they are intended to affect. For each area, it includes the planned depth, required working space and intended execution date. The enquiry also shows which areas are already accessible for investigation. Temporary and permanent installations remain distinguishable on the plan. The specialist planners can use this to identify which investigation results are needed for the first tasks and what belongs to the later main excavation. If, for example, a temporary service alignment or access road position changes, the specialist company receives the new plan before the affected work is carried out.
Coordinate the sequence and tasks
Utilities, drainage and road opening may be carried out by different companies. For explosive ordnance assessment, the actual trenches, chambers and working volumes are recorded together. Handovers between companies must not create undescribed gaps. Site management needs the associated report and unresolved matters for each section. A general note about the overall project is too imprecise.
Where two service sections cross, both alignments are compared with their respective depths and working space. A chamber or connection may form a different spatial task from the continuous trench. The shared site plan shows these transitions even if they belong to different commissions. Each contractor can identify the documents relating to its work area. If construction lot identifiers and report areas do not match, their correspondence is clarified before handover. Changes to a connection are then also communicated to participants whose work areas are affected.
Specialist services and investigation tasks
When replacing a building, demolition work on foundations may already constitute ground interventions. Deeper new foundations may follow. The two phases are described separately in the task definition. Existing structures may also limit investigation. Whether preliminary specialist work or work during construction is suitable is decided from actual accessibility and the investigation objective.
Floor plans and existing information on basements, foundations and underground connections help identify the individual interventions. The planned condition after demolition is compared with the later new building and its foundation depths. For each phase, the specialist planners define the investigation task and prerequisites for execution. For an area initially inaccessible, it is documented in which construction condition it is to be investigated. After existing structures change, it is checked which assumptions still apply. New findings are passed on with the previous results documents, allowing the following commission to build on the status actually achieved.
Provide specialist supervision of excavationFirst establish which decision the commission needs to support. Is the task an initial assessment of existing documents, an investigation of a specific area or examination of an anomaly that has already been assessed? These tasks require different evidence. A general wish for safety does not define an investigation that can be carried out. The enquiry therefore specifies the groundworks, location, depth and available findings. Suitable specialist work and the required reporting are then agreed on that basis.
Define the specialist taskRequired access and survey conditions are clarified before the site visit. This may include keeping areas clear, obtaining service information and coordinating with other trades. The method and site determine which preparations are actually needed. Changes to the surface or additional groundworks are not undertaken unilaterally simply to prepare for a survey. Their sequence is agreed with the specialist designers and responsible parties.
Clarify preparatory work in the programmeA reliable process distinguishes work already technically clarified from prerequisites still unresolved. If an area will only be partly accessible, this must be taken into account when commissioning the work. Handover and assessment of results also need time in the construction programme. Specific coordination connects the described scope with access, records, execution conditions and the date by which a decision is needed.
Discuss the scope and scheduleA site access road is not automatically mere use of the surface. If paving must be removed, temporary services installed or foundations constructed, for example, these interventions form part of preparation. Show the work actually planned on the site plan; the name “site setup” does not establish investigation needs.
Alongside excavation across the area, deeper sections for chambers or foundation elements may be added. Record their position and depth separately so that the investigation can take these differences into account. If the foundation design changes, compare before execution whether the existing investigation result still covers the new intervention.
For a connection outside the main excavation, different documents, installations and access conditions may be relevant. The connection to the existing network should therefore be described as a separate work area. Existing service plans and traffic constraints support coordination; they do not themselves demonstrate an explosive ordnance investigation.
If another company undertakes further earthworks after the civil engineering stage, it must receive the results relevant to its work area. Hand over the associated report with the current plan version, investigation boundaries and unresolved matters. An oral statement that an area has already been investigated is insufficient.
Provide a sequence starting with the preliminary work. Alongside the main excavation, record boreholes, services and temporary installations planned earlier. The area and depth intended for each task should be clear. This identifies when the specialist findings needed must be available.
Official correspondence and specialist reports are passed on with their appendices to the respective affected parties. An isolated sentence may omit the spatial scope or a condition. Site management assigns the documents to the construction plan. Changes are referred back to the specialist planners before the affected work.
The sequence is planned around the ground works actually proposed. Drilling, service diversions or temporary foundations may already be planned before the main excavation. For each affected area, it is clarified what must be established beforehand and which records are available. Construction plans already submitted may need additional construction details later. These additions are submitted for specialist assessment before the work concerned begins.
At the transition to the next construction phase, it is checked which results still apply. The location, depth and limitations described in the report are decisive. Additional working areas or changed methods are explicitly included. An interim release of an area for operational use and the technical findings of an investigation report are different matters. Site management receives the clarified status together with the associated plans and outstanding next steps.
Historical aerial photograph assessment and other old records help place the basis for suspicion in its spatial context. The available images, their evidential value and the limits of the area considered matter. The absence of an identifiable indication must be distinguished from a technically surveyed ground area. The assessment is considered together with the planned intervention and other available findings. It can support the choice of a survey, but is not a measurement of the present-day subsurface or confirmation for all future works.
Understand aerial photograph assessmentMagnetometric methods detect magnetic anomalies. Whether they can address the specific survey task depends, among other things, on the expected objects, ground conditions, interference and required survey area. Fences, utilities or existing structures may affect interpretation. A measurement signal is therefore not described as ordnance solely because of its strength. Method, interpretation and any further investigation are planned as a connected specialist task.
Understand the scope of magnetometryElectromagnetic investigations may be suitable for certain metallic target objects and site conditions. Suitability is justified for the particular task, rather than inferred from equipment availability alone. Interfering installations, accessible areas and the conclusion required must also be considered. Results are documented with their location and investigation conditions. Whether a supplementary method is needed follows from the technical assessment and remains a specific project decision. TDEM records time-dependent electromagnetic responses from electrically conductive objects.
Understand electromagnetic surveyingUnder suitable conditions, ground-penetrating radar can provide information about subsurface structures and reflections. Ground conditions, moisture, installations and the particular investigation task affect interpretation. An anomaly is not automatically explosive ordnance, and an area without anomalies is not general evidence for arbitrary depths. The technical interpretation and limitations are documented with the commission. An investigation for other purposes is not adopted as explosive ordnance evidence without assessment. Highly conductive ground can limit its range.
GPR and limitationsFor deeper groundworks, it may be necessary to establish whether a surface investigation can provide the required findings or another approach is needed. Preparation includes the location, depth, borehole layout and existing services. Creating access for the investigation must also be properly planned by specialists. A general depth figure or standard grid cannot replace that work. Findings remain limited to the areas actually investigated and the method used.
Prepare deep interventionsIf a necessary preliminary investigation cannot be completed, it is assessed whether a technically planned approach during construction is suitable. This includes coordinated investigation, interpretation and communication of findings within the planned workflow. Visual observation during excavation is not an interchangeable substitute for a necessary survey. Site management needs a clear description of when specialist work takes place, how new findings are handled and which areas remain unresolved. Where the method is suitable, each working layer is technically surveyed and assessed before controlled removal in layers. Visual checks supplement the survey. The process continues to the agreed excavation base and, where necessary, along walls or slopes; the stop signal, authority to issue instructions and reporting channels are agreed beforehand.
Agree the approach during constructionA historical aerial photograph analysis and existing investigation reports help describe the starting situation. The complete plan appendices form part of this. Any supplementary technical investigation needed is determined from these findings and the planned groundworks. Earlier buildings or previous excavation do not provide general evidence that an area is free from explosive ordnance.
The historical question also covers the preliminary intervention areas outside the later excavation. These work areas are identified on the current plan. Existing assessments are provided with their complete appendices and compared spatially with these areas. Unresolved assignments or missing explanations are recorded as specific enquiries. If the evidence is insufficient for the intended assessment, the scope of supplementary research or aerial photograph analysis required is clarified. Its result enters investigation planning with its spatial reference and limitations. If work areas are added later, the evidence available for this additional task is checked.
A surface survey must be assessed against the investigation objective and local measurement conditions. Different or supplementary methods may be needed for deeper interventions. The decisive point is whether the planned investigation can provide substantiated findings for the intended work area; a fixed range cannot be promised generally across the city.
The excavation, service trench and individual ground investigation points each receive their own position and depth information with the associated elevation reference. The specialist company compares this information with local conditions and explains a suitable approach. A changed formation level or additional deeper section is described with its new spatial scope. Results documentation likewise relates to the areas actually investigated. Later comparison with construction can therefore identify which question was investigated and which additional volume of ground needs assessment when plans change.
If ordnance surveying during construction is required, investigation and earthworks must be coordinated by specialists. The DGUV distinguishes this task from visual observation during excavation alone. The method, necessary personnel and protective measures must be defined before the excavator appointment.
The schedule links the respective investigation tasks with the planned construction sections. Participants agree which areas must be available, which preliminary work is necessary and who supplies the associated information. For site management, the results documents needed before the next affected task are recorded. If only part of a section is investigated, the status achieved and remaining tasks are described spatially. Further execution is coordinated with this status. Following changes to the construction sequence, excavation geometry or accessibility, coordination is updated before the next affected intervention; the companies involved receive the relevant plan and report versions.
Record preliminary work, the main excavation and connections with their areas and depths.
Assign existing assessments and reports to the respective work areas. If historical questions about individual areas remain unresolved, supplementary land-use records are researched and suitable wartime aerial photographs assessed, where available. The findings and assessment limitations are assigned to the present-day construction sections.
Before each groundworks task, clarify which investigation is necessary and under what conditions it can take place. A suitable method is selected according to the investigation objective, depth required, ground conditions, services, sources of interference and accessibility. This selection explains the specialist work and preliminary tasks needed for each construction section.
The specialist contractor carries out the commissioned investigation. Survey grids, necessary borehole locations and access for investigation are coordinated with the area, level reference, ground works depth and local conditions. Survey data and findings are spatially referenced; inaccessible sections and interference are recorded.
The results are compared with the construction task. Anomalies, assessed findings and unresolved areas are identified separately. For confirmed explosive ordnance, recovery and further handling are agreed with the responsible bodies in accordance with the division of responsibilities in Lower Saxony.
Hand over the report with its associated plans to site management and the contractors.
A suitable results report describes the area investigated, methods used and limitations of their conclusions. Areas or depths not covered remain identifiable. For investigation in stages, record which document applies to which construction condition and who arranges any necessary supplement. This prevents an older plan from silently remaining the basis of later work.
Commissioned technical work must be distinguished from statutory hazard response. In Lower Saxony, this is the responsibility of municipalities; the state explosive ordnance disposal service supports them and carries out its assigned recovery and disposal tasks. The private investigation documents the commissioned technical scope. Official decisions are made by the competent authorities; project participants coordinate further work accordingly.
We assess the planned groundworks against the available documents and their design revision. Before attending site, we agree with you what needs to be investigated, which areas are accessible and what findings are required. If the design or site conditions change, we check whether the agreed scope remains appropriate. The report states what was actually investigated and the limits of the findings. This allows designers and site management to see which findings they can use and where questions remain.
Discuss the investigation taskWe first establish the investigation objective: which question must it answer? We then select a technically suitable method. The availability of a particular device or experience on a similar neighbouring site is not enough to justify the choice of method on its own.
Inaccessible areas and limited conclusions are identified. They do not disappear into a total area figure. Designers and site management can then decide specifically which areas still need attention and when a suitable survey becomes possible.
A new location, additional depth or different construction method is compared with previous results. A familiar project name does not replace this comparison. Feedback is provided before the affected work so that an outstanding question can be included in the sequence.
The technical conclusion remains connected to its location references and appendices. A brief summary helps orientation but does not replace the documented survey scope. This basis is retained even if site management or contractors change.
A statement is understandable only with its investigation task. Check the area and depth described, methods used and restrictions. A report title or single result line is insufficient. For new work, these details are compared with the current plan to establish which knowledge remains usable and which question is unresolved.
Explore results and terminologyDocument review, surveying, construction-phase specialist work and recovery are different tasks. An enquiry need not identify the correct method in advance. An accurate description of the intervention and required decision is more useful. This establishes the appropriate technical scope and prevents a general term from meaning different things in design, procurement and execution.
Understand the service scope
Aerial photograph interpretation is related to the actual groundworks. Its purpose and geographical scope remain distinct from a technical investigation of the ground as it is today.
Understand aerial photograph assessment
The findings, their locations and limitations are handed over together. This makes clear to those carrying out the work which area has been investigated and which task remains outstanding.
Assess investigation reports


Historical assessment, technical investigation and further work answer different questions. The service overview helps distinguish these tasks in an enquiry.
Compare services
Preparation connects the commission, site work and handover of findings. Changes to the project can then be incorporated into technical coordination in good time.
Process and documentationAs soon as the first ground interventions are specifically planned. These may already include geotechnical investigation points, temporary connections or preliminary earthworks. The necessary investigations must be coordinated with these tasks, rather than only with the start of the main excavation.
The city explicitly states that an aerial photograph assessment does not provide explosive ordnance clearance for the construction area. Whether a technical investigation is needed, and which type, must be clarified using the findings and proposed measure. This question must be clarified from the specific documents before your construction starts.
Whether investigation in stages is suitable must be assessed against the design. The limits of each result, earthworks sequence and unresolved areas must be recorded. The construction schedule alone does not justify work in a section not yet sufficiently assessed.
The investigation results relevant to its area and depth, including plan appendices, limitations and any necessary follow-up measures. Also check whether the report handed over matches the current construction plan. Evidence from another construction phase cannot be applied without comparison.
If possible explosive ordnance is found, stop work at the location immediately. Do not touch, move or expose the object further. Leave the immediate area, keep your distance and keep others away without putting yourself at risk. In Germany, notify the police immediately on 110 and follow their instructions. Inform site management and the client; internal reporting must not delay the emergency call. An enquiry form for planned construction projects is not an emergency reporting channel.
Because its trench may disturb the ground before the main structure is built. Where investigation is needed, this first intervention must be included in planning. Describe the position, depth and working space of the temporary installation, together with its planned construction date.
Area, intervention depth, available documents, ground conditions, metal interference and access determine the investigation task. Required preparation, interpretation, assessment of findings and documentation must also be considered. When agreeing the quotation, identify the first interventions, further construction phases and existing results. Unresolved quantities or access are agreed before execution.
It is compared with the previous investigation scope. If it was previously inaccessible or its measurements could be interpreted only with limitations, that limitation remains until specialist clarification. Further work is coordinated in good time before groundworks start there.
State whether the enquiry concerns early planning, preparation for tendering or ground works about to begin. The date by which technical findings are needed helps coordination. Outstanding information is explicitly identified rather than replaced with assumed values. Specify the earliest ground works, construction time windows, maximum ground works depths and investigations already commissioned.
Send a site plan and available reports with their associated appendices. For several construction phases, identify which document belongs to which area. Photographs supplement descriptions of access and existing structures; they do not replace information about underground structures or planned depths. Include official correspondence, conditions, service plans and ground investigation records or records of existing structures. Identify contacts and areas that are not yet accessible.
Whether historical aerial photograph analysis, explosive ordnance surveying, surface surveying using GPR, magnetometry or TDEM, deep-ground surveys, downhole surveys, excavation supervision, area clearance or ordnance recovery is needed depends on the location, ground disturbance, depth, ground and existing documents. An early ordnance assessment provides clarity for tendering, programming, occupational safety and construction.
FONTANA-EOD combines its Section 7 SprengG licence, specialists holding Section 20 SprengG certificates of competence, suitable survey and clearance methods, and traceable documentation. Send the site plan, depth of ground disturbance, construction phase and existing documents for an initial technical assessment.