Project pathway
The quickest route to the right decision.
Ground slabs, foundations and utility ducts may remain beneath demolished buildings on an industrial brownfield site. For owners, project developers and demolition designers, FONTANA-EOD checks existing explosive ordnance assessments against the demolition stage and next ground interventions. Send as-built and demolition plans, planned interventions and depths so that investigations can be coordinated before procurement, demolition or civil engineering works.
Clarify the construction site and its boundaries.
Coordinate the intervention and method.
Maintain a reliable project file.
Industrial brownfield sites combine demolition, contamination, new uses, former infrastructure and often unclear ground conditions.
Explosive ordnance assessment for an industrial brownfield site becomes relevant as soon as demolition, ground investigation, site servicing, foundation works, utility installation, excavation or redevelopment affect areas with an unclear history. The suspected hazard, previous uses, fill, interfering objects, planned depth, interfaces with contamination work and intended purpose of the documentation are decisive. FONTANA-EOD assesses this information for the project and prepares the appropriate next technical step.
The client, designers, site management and specialist company relate investigations to the same demolition areas, site servicing axes and depths of intervention.
For industrial brownfield sites, technical assessment starts with the site plan, construction site boundaries, planned use, existing documents on suspected hazards and the question of which interventions will actually be carried out. These documents guide whether historical assessment, a technical survey or monitoring during construction is the most appropriate initial approach.
Select suitable specialist services according to the starting conditionsThe investigation area must suit the planned construction activity. Near-surface earthworks, deep boreholes, chambers, retaining structure axes, utility trenches or foundations may require different documentation. A blanket assessment of the entire site is often insufficient for industrial brownfield sites.
Compare methods with the area, depth and construction sectionExisting utilities, old foundations, reinforcement, scrap metal, fill, operational installations and surfaced areas influence which methods can provide meaningful results. These factors belong in the project description before method selection.
Coordinate method selection with existing technical installationsFor areas with limited preliminary investigation, the technical suitability of construction-phase ordnance surveying is assessed. Each working layer is technically surveyed and assessed before controlled layer-by-layer removal with supplementary visual inspection. The steps are repeated down to the agreed excavation bottom. Excavation layers, stop signals, authority to give instructions, reporting procedures and documentation are agreed with site management and safety officers before work begins.
Plan excavation monitoringIndustrial brownfield sites require documentation that makes the investigation area, method, conditions, assessment of results and subsequent decision traceable. It must suit the project phase and be usable for the client, designers, site management and relevant interfaces.
Prepare evidenceInvestigation methods and achievable depth depend on the suspected hazard, planned intervention and survey conditions. The service pages explain the individual methods.
Compare investigation methods and limitationsThe starting conditions determine whether a document review, survey, excavation supervision or a combination is technically appropriate.
Industrial brownfield sites often contain old foundations, ground slabs, utilities, chambers, ducts, railway remnants, fill and former plant areas. These features influence survey feasibility and the construction sequence.
For the new use, demolition areas, future construction sites and site servicing are shown on the same plan. This makes it possible to identify the existing explosive ordnance assessments and unresolved investigation needs for each construction section.
Contamination, ground conditions, fill and geotechnical questions may coincide with explosive ordnance investigations. Interfaces with environmental and ground investigation reports should be clarified early.
Scrap metal, steel, reinforcement, concrete remnants and old utilities can obscure survey signals. The evaluation identifies these limitations. Further steps for inadequately investigated areas are defined by specialists.
Before new ground interventions, existing information, unresolved investigation questions and the next construction section are checked against each other.

Old foundations, ground slabs, utilities and excavation areas are recorded using the demolition plan. Necessary investigations and protective measures are planned before ground interventions during demolition, breaking out, utility exposure or construction of site roads and working areas. Areas that become accessible later receive their own investigation steps before the respective interventions.
Have the demolition area assessed
Previous uses, fill and interfering objects are related to historical documents and technical investigation.
Assess the former site
For development, sale, planning or procurement, investigation areas and documentation are adapted to the future construction objective.
Prepare a change of use
Deep excavations, retaining structures, chambers, drainage and utility trenches may require a coordinated approach to survey or supervision.
Agree intervention depths
For areas that cannot be adequately investigated in advance, the suitability of explosive ordnance detection during construction is assessed. Technical investigation and assessment of each working layer precede controlled removal; results and limitations are documented for each construction section.
Plan excavation monitoring
For a finding requiring investigation, responsibilities, further steps and documentation are coordinated. For a suspicious object discovered unexpectedly, the safety instructions below take priority.
Clarify procedures for findingsMany decisions are made before actual construction: during acquisition, planning, procurement, preparation for drilling or demolition.
For industrial brownfield sites, an early assessment can help establish the suspected hazard, documents needed and possible investigation steps before contractual, planning or investment decisions.
Clarify the project circumstances earlyService limits, investigation areas, construction phases and documentation requirements should be described before procurement so that tenders can be compared and construction sequences planned.
Prepare evidence for procurementGround investigation boreholes, pile axes, explosive ordnance investigation boreholes or investigation points need clear position and depth references.
Agree borehole positionsExcavations, utility trenches, chambers, foundation excavations and earth shaping should be checked against the suspected hazard, investigation limits and procedures for findings.
Determine investigation needs for excavation and civil engineeringElectricity, gas, water, wastewater, communications, district heating and process utilities influence access, survey work and occupational safety. These routes are considered in planning.
Survey anomalies are assessed by specialists using the survey data and assigned to a follow-up investigation. If an unexpected suspicious object is found, stop work in the affected area immediately. Do not touch, move or further expose the object. Leave the immediate area and keep others away without putting yourself at risk. In Germany, notify the police immediately on 110; outside Germany, use the local emergency reporting procedure. The competent authorities determine the next steps. Inform site management and the client; internal reporting must not delay the emergency call.
Assessment of an industrial brownfield site must bring together existing structures, demolition, ground conditions, future use and technical limits of the conclusions.
For industrial brownfield sites, the first step is to clarify whether the assessment is needed before acquisition, planning, procurement, demolition, drilling, excavation or construction. The project phase determines the documents, level of detail and subsequent decision.
Assess the project phaseThe entire site does not automatically require the same approach. Construction sites, utility axes, drilling points, traffic areas, excavations and peripheral areas are distinguished according to planned depth of intervention and access.
Historical documents, aerial photograph assessments, existing reports, previous use and known authority conditions help describe indications of a suspected hazard traceably and prepare targeted technical investigations.
Assess the suspected hazardSurface survey, deep-ground survey, borehole survey or ordnance specialist supervision of excavation are not selected mechanically. Ground conditions, interference, depth, surface and construction sequence are decisive.
Agree the methodSurvey work and supervision must be coordinated with access, exclusion areas, time windows, occupational safety, utility protection and site management. This avoids unclear handovers during the project.
The purpose of the documentation should be stated in advance: procurement, project file, HSE, site management, operator communication, coordination with authorities or the subsequent decision for the next construction section.
Clarify the purpose of the documentationFor each construction section, investigation limits, documents used, method selection and results are recorded. Project developers, demolition management and subsequent trades receive the relevant investigation status.
The surface, vegetation, sealed areas, moisture, interfering objects, utilities and metal installations are described so that subsequent conclusions can be placed in their technical context.
The investigation is integrated into the sequence so that necessary areas are accessible in time and subsequent trades receive a traceable handover.
Different subareas may require different methods or conclusions. A differentiated assessment prevents results from being transferred to areas that have not been investigated.
Reporting procedures, site communication and further measures must be prepared for anomalies or suspected hazards. This supports site management and those responsible for safety.
Designers, site management, the operator, HSE, civil engineering teams, environmental consultants and competent authorities need consistent documents. A common data basis facilitates coordination.
Reports should clearly present the location reference, investigation area, method, conditions, result and subsequent decision so that they can be used in procurement and site management.
Fill, scrap metal, reinforcement, old foundations, contamination and utilities can affect technical methods.
Asphalt, concrete, aggregate, vegetation, storage areas and demolition conditions influence whether a surface survey is possible and can provide meaningful results.
The design depth follows from the foundation, borehole, retaining structure, chamber, utility trench or excavation. Without a depth reference, the conclusion remains too imprecise.
Metal remnants, reinforcement, utilities, scrap metal, old foundations and operational installations can obscure survey signals and must be identified in the assessment.
Exclusion areas, ongoing operations, vegetation, traffic, demolition equipment and stored materials determine when and how investigation areas can be entered safely.
Survey data and findings must be related to the site plan, coordinates, construction site boundaries and construction sections so that they remain usable in the project file.
Utility clearances, occupational safety, site management, environmental reports, administrative procedures and subcontractors must be coordinated with the explosive ordnance service.
Documentation must show which subareas, depths, conditions and subsequent decisions were assessed.
The site plan, construction section, suspected hazard documents, aerial photograph assessment, ground investigation data, utility plans and as-built plans form the basis of the technical assessment.
Have your documents reviewedThe investigated area is described by its location reference, boundaries, access, surface and planned depth of intervention. This prevents unclear application of results to other areas.
The methods used, survey conditions, interference and limits of the conclusions are documented so that the assessment remains technically traceable.
Anomalies, findings or limited scope for conclusions are described together with the subsequent decision. Reassessment, supervision or further coordination may follow.
For site management and safety coordination, clear working areas, reporting procedures, handovers and documents that can be incorporated into the construction sequence matter.
The project file needs traceable documents for the client, designers, construction teams and relevant interfaces. The extent depends on the service and project phase. Following actual exposure or clearance work, the corresponding findings and clearance records are included.
Agree evidence requirementsA reliable dossier links historical documents, location references, technical investigation, assessment of findings and interfaces with ground investigation, contamination work and construction.
Plans, coordinates, construction site boundaries, sections and intervention zones are brought together so that investigation and construction activity remain clearly linked.
Methods, survey grids, drilling points, supervision areas, access, surface and conditions are described so that the conclusions can be checked.
The assessment classifies findings, anomalies, limitations and the next technical step. This provides a reliable basis for a project decision.
The client, designers, HSE, site management and construction teams receive documents suited to the relevant decision and construction section.
The sequence is planned so that demolition, ground investigation, survey work, excavation and documentation work together in the correct order.
The location, area, contacts, construction objective, depth of intervention and existing documents are recorded.
Site plans, aerial photograph assessments, historical documents, utility plans and construction phases are organised for technical review.
Construction sites, utility axes, drilling points, excavations and peripheral areas are described separately.
Surface survey, deep-ground survey, borehole survey, excavation supervision or combinations are assessed for the specific project.
Access, occupational safety, exclusion areas, survey conditions and the construction sequence are taken into account on site.
Survey data, findings, interference and limits of the conclusions are evaluated by specialists.
The report, location references, photographic records and subsequent decision are prepared for the project file and site management.
The results are taken forward into procurement, excavation, drilling, demolition or further coordination.
Industrial brownfield sites are rarely technically uniform areas. Existing structures, interfering objects and future ground interventions must be assessed separately.
An industrial brownfield site may contain open ground, sealed areas, demolition zones, former production areas, old utility ducts, foundation remnants and fill in close proximity. For explosive ordnance assessment, this means that technical conclusions always remain tied to the investigated area and actual construction activity. A historical assessment can evaluate indications of a suspected hazard and former land-use patterns. A technical survey must then assess whether the surface, interference environment and design depth allow reliable conclusions. Where metal interference, concrete remnants, utilities or excavation conditions limit advance investigation, monitoring of earthworks during construction may be the appropriate technical follow-up. FONTANA-EOD distinguishes these cases so that the client, designers, site management, environmental consultants and relevant interfaces can trace the assessment.
Car parks, building footprints, demolition zones, utility axes, green spaces and traffic areas may require different methods.
Drilling points, chambers, foundations, infiltration trenches, retaining structure axes and utility trenches must be described with their planned depths.
Asphalt, concrete, reinforcement and substructure influence survey feasibility and access. A different investigation or supervision approach is selected where necessary.
Existing utilities are both safety factors and sources of interference. Utility protection and explosive ordnance assessment are therefore considered together.
The timing of the investigation must suit demolition, site preparation, survey work, earthworks and subsequent trades.
Every conclusion relates to the investigation area described, the method applied and the conditions documented.

The history of use and existing explosive ordnance documents are compared with remaining foundations, utilities and planned ground interventions. The positions and depths of demolition, site servicing and new foundations are described separately. Previous industrial use alone does not replace a project-specific assessment of the suspected hazard.
Check works documents against the volumes of ground affected today
Sealed surfaces, scrap metal and structural remnants can affect access and survey results. Suitable methods and investigation timing are coordinated for the relevant construction conditions. Explosive ordnance tasks remain separate from contaminant analyses and ground assessments, even when their execution is planned together.
Coordinate methods with existing structures, demolition and survey limitationsInvestigation planning requires the area, depth of intervention, construction phase, survey conditions and documentation needed.
On industrial brownfield sites, construction sites, access roads, utility axes, drilling points, excavations, external works and later extension areas should not be grouped indiscriminately. Each subarea has its own conditions: surface, ground, interfering objects, planned depth, access and intended purpose of the documentation. This distinction helps relate technical conclusions precisely to the actual intervention and avoid later misunderstandings between designers, procurement and site management.
Define subareas in technical termsFor industrial brownfield sites, stating the project area alone is insufficient. The decisive question is whether near-surface earthworks, utility trenches, deep foundations, driving or drilling points, chambers, retaining structure axes or deep excavations are planned. Design depth, investigation objective, ground conditions and sources of interference together determine which historical or technical investigations and, where applicable, methods during construction are needed.
Select methods according to the actual ground interventionOn industrial brownfield sites, existing utilities, old foundation remnants, surfaced areas, reinforcement, scrap metal, former utility ducts, operational plant or temporary site roads can affect technical surveys. Such conditions should be described in the enquiry rather than first becoming apparent in the field. Method selection can then be realistic, and subsequent documentation clearly identifies where technical limitations existed.
Select a suitable investigation under existing site conditionsMany industrial brownfield projects proceed in sections: preliminary assessment, demolition, site servicing, structural work, external works, infill development or fit-out. The explosive ordnance assessment must suit this sequence. If a later construction section becomes accessible only after the first intervention, it needs its own technical assessment. Documentation thus remains tied to the construction phase and intervention.
Coordinating construction phasesFor tendering, subcontractor coordination and site management, the area to be investigated, planned depth, existing documents and expected service should be clearly described. For industrial brownfield sites, this preparation prevents unclear service boundaries between ground investigation, civil engineering, explosive ordnance assessment, excavation and documentation.
Prepare procurement documentsAfter an initial assessment, the appropriate next technical step must be clear: aerial photograph assessment, technical survey, supplementary borehole investigation, excavation supervision, assessment of findings or documentation for the project file and site management. For industrial brownfield sites, this subsequent decision is more important than a general assessment of the entire property.
Review the subsequent decisionFor industrial brownfield sites, the technical survey is only one part of the work. The assessment must work together with documents, site management, execution, communication about findings and documentation.
Before technical work, the site plan, land parcels, as-built plans, utility plans, construction phases, planned depths, existing reports, aerial photograph assessment, demolition information and known conditions should be brought together. On industrial brownfield sites, this reduces queries and enables the assessment to focus on the interventions actually affected.
Ground-penetrating radar, magnetometry, TDEM, deep-ground survey, borehole survey, area clearance and ordnance specialist supervision of excavation serve different purposes. One method does not automatically replace another. Selection depends on the survey environment, ground conditions, interfering objects, surface, investigation depth, construction phase and purpose of the documentation.
For industrial brownfield sites, investigation areas, exclusion areas, machinery movements, access roads, safety distances, occupational safety and time windows must be coordinated with site management. The more clearly these points are described before execution, the better explosive ordnance assessment can be integrated into the actual construction sequence.
If unusual findings arise during assessment, survey work or excavation, reporting procedures, contacts, the form of documentation and responsible interfaces must be clear. The site then needs reliable information rather than improvised changes of responsibility. Communication is therefore prepared in advance for the specific project.
Documentation for industrial brownfield sites should remain traceable for the client, designers, HSE, site management and subcontractors. This includes location references, the investigated area, method applied, technical limitations, assessment of findings, photographic records and recommendations for the next project step. The extent of documentation and handovers are agreed before work begins.
Explosive ordnance assessment interfaces with ground investigation, contamination work, civil engineering, demolition, utility installation, occupational safety, approval planning and competent authorities. The private specialist service is technically coordinated with these interfaces. Decisions, reporting procedures and official responsibilities remain clearly distinguished so that the project sequence stays traceable.
Method selection depends on the suspected hazard, existing structures, access, interference environment, required depth and construction phase.
It assesses previous uses, identifiable indications of a suspected hazard and site history. It does not replace a technical investigation, but can prepare investigation areas in a targeted way.
It is suitable for accessible areas with adequate survey conditions. Sealed surfaces, reinforcement, utilities and metal interference can affect the conclusions.
Magnetometry detects ferromagnetic anomalies in accessible areas. Utilities, reinforcement, foundation remnants, scrap metal and vehicles can obscure survey data at the former site. Areas that can be evaluated and survey limitations are documented separately.
TDEM detects time-dependent electromagnetic responses from conductive objects. The target object, ground conductivity, required depth and technical installations determine suitability for the particular demolition area or site servicing route.
GPR records reflections at material and structural boundaries and can provide supplementary investigation of utilities or installations. Soil, moisture, surface coupling and reinforcement affect data depth. A reflection does not uniquely identify ordnance.
For deeper interventions, boreholes, piles, chambers or retaining structure axes, it is first assessed whether a suitable surface method adequately covers the required volume of ground. Where coverage is insufficient, a suitable supplementary deep-ground investigation is planned. Position and design depth are related to the actual intervention.
It can be used for defined drilling points or deeper individual areas. Spacing, drilling method, casing and purpose of the documentation must be established.
For areas with limited preliminary investigation, the technical suitability of construction-phase ordnance surveying is assessed. Each working layer is technically surveyed and assessed before controlled layer-by-layer removal with supplementary visual inspection. The steps are repeated down to the agreed excavation bottom. Excavation layers, stop signals, authority to give instructions, reporting procedures and documentation are agreed with site management and safety officers before work begins.
Measurement anomalies receive targeted follow-up investigation or exposure. Recovery of confirmed ordnance is coordinated with the permitted activities, local responsibilities and documentation. If an unexpected suspicious object is found, stopping work, keeping distance and immediate reporting take priority.
Depending on the project objective, the next step leads to document review, area survey, deep-ground survey, excavation supervision or coordination of documentation.
If it is still unclear whether existing documents are sufficient, the area is assessed using the site plan, history, construction objective and planned interventions.
Assess the suspicion indicatorsOnce the construction site, depth and access are established, the technical investigation can be planned methodically and incorporated into the construction programme.
Compare technical specialist services for the construction siteFor remaining areas, the suitability of explosive ordnance detection during construction is assessed. Technical investigation and assessment of the relevant working layer are included in the construction sequence before controlled removal.
Plan excavation monitoringWhere procurement, site management or HSE need documents, the purpose of the documentation is defined before the service is carried out.
Prepare evidenceIf the site is part of a larger industrial or commercial project, the sector section helps identify adjoining applications.
Open industry and commerceSend previous plant plans, existing explosive ordnance assessments and the current demolition plan together with the next planned intervention.
Send project documentsInvestigated subareas are recorded with demolition status, survey conditions, depth of intervention and result in the applicable plan version.
FONTANA-EOD considers industrial brownfield sites by subarea, former use, demolition condition, interference environment and future intervention. This provides a technical basis for investigation, construction sequence and documentation.
Coordinate the approach for the projectThe assessment relates to the specific areas, depths, methods and construction activities of the demolition or new construction section.
Interference and inaccessible areas are documented. Demolition management and specialist designers can use this to clarify which areas still require investigation before the next ground intervention.
Survey work, demolition, excavation, drilling and subsequent trades are coordinated so that the investigation remains usable within the project.
The documents are maintained so that the client, designers, HSE and site management can trace the investigated scope.
Industrial brownfield sites bring together project development, demolition, contamination work, ground investigation, civil engineering and competent authorities.
Those responsible provide the project objective, area, construction section, documents and required evidence. They decide which services to commission and which parties to involve in the project.
Designers and project managers translate the construction objective, intervention depth, schedule and procurement requirements into assessable tasks. They need reliable information to integrate ordnance assessment into the bill of quantities, schedule and project file.
Construction teams need clear work areas, documented investigation steps, agreed reporting procedures and safe handovers between surveying, excavation and subsequent trades.
FONTANA-EOD assesses suspicion indicators, methods, investigation depth, construction sequence and evidence for the project. The service remains limited to the commissioned technical investigation, supervision and documentation.
In Germany, the ordnance disposal services of the federal states and the locally competent authorities carry out hazard-response and find-management duties. Their involvement is established for the project location; outside Germany, local responsibilities apply. Private specialist services support project preparation and communication between the parties within the commissioned scope.
The local public order authority and, where applicable, building control are involved according to their project-specific responsibilities. Conditions, contacts and reporting procedures are assigned to the affected subareas, demolition zones and construction sections.
HSE teams, health-and-safety coordinators or safety officers consider investigation areas, exclusion zones, findings procedures and site organisation. Specialist documentation helps incorporate these matters into construction.
Ordnance assessment in construction projects is shaped by responsibilities, occupational safety, specialist knowledge, documentation and interfaces with authorities. The specific assessment depends on the project location, activity and requirements of the parties involved.
The investigation scope and documentation are defined for the respective volumes of ground affected. Requirements for qualifications, occupational safety and reporting procedures are clarified according to the project location and commissioned activity. The Baufachlichen Richtlinien Kampfmittelräumung contain requirements for historical and technical investigation, clearance concepts, procurement and documentation within their defined scope of federal responsibilities. Their application to the specific regeneration project is clarified separately.
In Germany, § 7 SprengG concerns the commercial authorisation for activities requiring authorisation; § 20 SprengG concerns the certificate of competence of responsible persons. Under § 1b SprengG, searching for found munitions also counts as handling them. The requirements applicable to the project depend on the activity actually commissioned and the allocation of responsibilities.
The First Ordinance to the Explosives Act (1. SprengV) includes requirements concerning specialist competence and state-recognised training courses. On industrial brownfield sites, the required qualifications are determined by the specific investigation or clearance assignment and the planned volumes of ground affected.
DGUV Information 201-027 concerns protective measures during ordnance clearance work. DGUV Rule 113-003 concerns the dismantling or destruction of explosives or corresponding objects and also includes the disposal of found munitions. It applies according to this field of activity; it does not replace a risk assessment specific to the planned ground intervention.
Work on ordnance and technical ordnance services raise questions of authorisation, competence and responsibility. These are not treated as formalities but incorporated into services, personnel, sequence and documentation.
Risk assessment, site organisation, access areas, reporting procedures and protective measures must match actual execution. Ordnance assessment is therefore part of construction planning, not merely an individual measurement operation.
Reporting, find-management and hazard-response procedures remain with the competent authorities. Clients need to prepare documents, findings and communication so that project interfaces can be handled traceably.
A report describes the investigated scope, methods used, conditions and assessments. It does not replace investigations not carried out and should always be read against the specific construction activity.
Procurement, site management and operator communication need traceable documents clearly showing the area, method, result and follow-on decision.
Agree evidence requirementsIf an unexpected suspicious object is found, stop work in the affected area immediately. Do not touch, move or uncover the object further. Leave the immediate area and keep others away without putting yourself at risk. In Germany, notify the police immediately on 110; outside Germany, use the local emergency reporting procedure. The competent authorities determine what happens next. Inform site management and the client; internal reporting must not delay the emergency call.
Prepare project communicationThe technical service required depends on suspected contamination, surface, depth, interference environment and construction phase. These details should be brought together before commissioning.
Clarify the service scopeThe address, land parcels and former works name help assign existing documents and competent authorities.

For industrial brownfield sites, the address, land parcels, construction site boundaries and responsible project participants are needed. The region influences interfaces, available documents and coordination procedures.
Check the project region
Competent authorities, applications and reporting procedures depend on the project location. Existing official information is considered in planning.
Prepare regional assessment
Commercial, residential and site servicing projects connect local construction planning with ground risks. The location alone is usually insufficient for an enquiry; the specific intervention determines the next step.
Arrange specialist assessment of the construction projectExisting documents, technical investigations and results reports are assigned to the affected demolition area or future site servicing route.

Assess the suspected hazard and former land-use patterns before planning technical investigations.
Assess aerial photograph analysis
Prepare drilling points, design depth, investigation grid and technical execution for defined interventions.
Coordinate survey work
Technically investigate and assess working layers in suitable areas before removal; coordinate controlled removal, supplementary visual inspection and documentation within the construction sequence.
Arrange excavation supervision
Prepare the project file, site management, procurement and interface communication with reliable documents.
Prepare evidence

Before drilling, excavation and development works, suitable investigations and the evidence needed for each work volume are defined.

Specialist sector for industrial sites, commercial areas, works sites, logistics and former sites.
Open industry and commerce
Service overview for aerial photograph assessment, surface survey, deep-ground survey, excavation supervision and recovery.
Understand the services
Assess indications of a suspected hazard, historical use and project documents before technical investigation.
Arrange a suspicion assessment
Establish the suitability and sequence of construction-phase ordnance surveying for remaining excavation areas.
Agree excavation supervision
Prepare documentation, the project file, sequence and records for the client and site management.
Clarify documentation
Send the project location, construction section, depth, documents and intended purpose of the documentation to FONTANA-EOD.
Send project documentsIndustrial and commercial projects need an assessment that brings together construction activity, operations, available documents and the purpose of the documentation rather than treating the site indiscriminately.
For industrial brownfield sites, reliable conclusions require subareas to be distinguished by construction activity, access and depth of intervention. A building footprint, utility axis, surfaced yard, demolition boundary and later extension area may concern the same site but have different technical investigation conditions. This distinction matters to the client because it makes subsequent handovers to site management, HSE, civil engineering teams and the operator traceable.
Many industrial and commercial projects do not take place on completely clear sites. Ongoing use, deliveries, site security, diversions, storage areas, utility supplies and limited closure windows affect when an investigation area is accessible. Explosive ordnance assessment on industrial brownfield sites is therefore coordinated with time windows, access roads, safety requirements and the actual construction phase rather than treated solely as a standalone survey service.
Previous use, existing foundations, fill, utility remnants, old traffic areas and demolition conditions can affect technical conclusions. At the same time, the planned new use matters, including foundations, utilities, traffic areas, drainage and external works. The technical assessment connects both aspects so that the specific future intervention is the benchmark, rather than assessing only the past.
Not every area can be meaningfully investigated using the same method. Sealed surfaces, reinforcement, metal installations, scrap metal, machinery foundations, utilities, fencing and surface condition can limit survey data. Method selection is justified for the respective volume of ground affected. Survey limitations and investigations still required are identified for the affected areas and depths.
Earthworks on industrial and commercial sites range from near-surface utility trenches to deep chambers, piles, retaining structure axes, drilling points or excavations. Investigation depth must suit the construction activity. If only the area is stated, the technical conclusion often remains too imprecise. Design depth, axis, construction section and execution method together make explosive ordnance survey work reliable for designers and site management.
For tendering and procurement, the decisive question is whether the client needs a document review, technical survey, drilling-point investigation, excavation supervision, assessment of findings or documentation. Describing these points in advance allows the scope of services, interfaces and responsibilities to be incorporated more effectively into the specification, construction programme and safety planning. This reduces misunderstandings between the client, specialist company, site management and subcontractors.
If unusual findings arise during investigation or excavation, the project needs clear communication procedures. Who informs site management, the operator, safety coordination, competent authorities and subsequent trades? Which work is stopped, which areas remain accessible and which documents are supplemented? Good project preparation answers these questions before ground intervention so that procedures for a finding do not have to be organised under site pressure.
Industrial and commercial sites often involve contamination, ground investigation, demolition, waste disposal, utility research and occupational safety. Explosive ordnance assessment does not stand apart from these trades. Results and limitations must be documented so that they can be incorporated into ground investigation reports, demolition planning, waste disposal concepts, HSE coordination and construction without mixing specialist roles.
In multi-phase projects, it matters which subarea was investigated at which time and which adjoining areas remain unresolved. An initial survey for a site servicing route does not automatically replace assessment of later building footprints, external works or extension zones. The documentation must make these limits clear so that subsequent sections can be planned in time and earlier results are not overinterpreted.
The project file records results and steps still required. This includes location references, the investigated area, method applied, technical conditions, assessment of findings, photographic records, limitations and recommendations for the next step. For industrial brownfield sites, this working approach is particularly important because operators, designers, site management, HSE and subcontractors often have different information needs.
Investigation areas, results and limitations are documented for tendering, site management, operations and the project file and handed over to those involved.
For industrial brownfield sites, the specification should identify the planned construction activity, not merely an area. A utility trench, building foundation, traffic area, demolition boundary, drilling point, chamber or extension area creates different requirements. A clear reference in the specification makes tenders easier to compare and enables subsequent documentation to refer unambiguously to the intervention investigated.
Design documents and as-built plans are an important basis, but do not replace technical consideration of the actual situation. Deviations in utility routes, covered chambers, filled areas, old foundations, storage areas or temporary traffic routes can change the investigation area. Documents, the site visit, construction sequence and safety requirements are checked against each other during preparation.
Access, occupation of areas, surface condition and remaining operations are clarified before the investigation appointment. Lorry traffic, parked containers, site facilities, fenced operational areas and closed utility spaces can limit access. Inaccessible areas are explicitly identified as not yet investigated.
Site management needs clear limits rather than vague wording: which area was investigated, to what depth, using which method, under which conditions and with what subsequent decision. This clarity is particularly important where civil engineering, utility installation, demolition, external works and building construction have different schedules and subcontractors.
An anomaly or finding is assessed in the project context. Position, depth, surroundings, survey conditions, construction activity, occupational safety and responsible interfaces belong together. Only this assessment establishes whether reassessment, exposure, excavation supervision, an adjustment to the construction sequence or a documented enquiry to the competent authorities becomes necessary.
In industrial and commercial projects, documents are often passed on several times: to operators, buyers, tenants, designers, contractors, HSE, asset management or authority contacts. A report should therefore be technically complete and describe location references, conditions and limitations so that later project participants can also use its conclusions correctly.
After the assessment, the project must have a clear next step. This may be execution of the planned intervention, an additional survey, ordnance specialist supervision of excavation, adjustment of drilling points, another document review or interface coordination. Good documentation therefore extends beyond survey data to the next technical decision.
On industrial brownfield sites, area boundaries, user requirements, utility plans, external works or construction phases often change during planning. If interventions, depths or positions shift, it should be checked whether the existing explosive ordnance conclusions still suit the new construction activity. This keeps the project file reliable during infill development, extension or design changes.
Technical information
Work on industrial and commercial sites combines existing installations, operational processes and new ground interventions. The brochure explains how ordnance assessment is coordinated with these conditions.

An assessment is useful as soon as demolition, ground investigation, site servicing, foundation works, utility installation, excavation or redevelopment affect areas with an unclear history. The suspected hazard, existing structures, fill, interfering objects, depth of intervention and purpose of the documentation are decisive.
Useful documents include a site plan, land parcels, demolition and as-built plans, aerial photograph assessments, contamination and ground investigation documents, utility plans, planned construction sections, depths of intervention, known interference areas and existing conditions imposed by authorities. Authority information and conditions should be supplied with their dates, complete attachments and geographical scope.
Depending on the project, historical aerial photograph assessment, surface survey, ground-penetrating radar, magnetometry, TDEM, deep-ground survey, borehole survey, ordnance specialist supervision of excavation, area clearance or explosive ordnance recovery may be relevant. Selection depends on the surface, existing structures, interfering objects, investigation depth and construction phase.
Contamination and ground investigation matters are technically separate from explosive ordnance assessment, but are coordinated within the project sequence. Clear responsibilities, agreed working areas, a suitable sequence and traceable documentation are important.
Interfering objects, reinforcement, scrap metal, utilities, concrete remnants or fill can affect survey signals. The limits of the conclusions are then documented, and it is assessed whether other methods, more closely defined areas or monitoring during construction are required.
If an unexpected suspicious object is found, stop work in the affected area immediately. Do not touch, move or uncover the object further. Leave the immediate area and keep others away without putting yourself at risk. In Germany, notify the police immediately on 110; outside Germany, use the local emergency reporting procedure. The competent authorities determine what happens next. Inform site management and the client; internal reporting must not delay the emergency call. FONTANA-EOD supports project-specific specialist assessment, surveys, documentation and communication between parties within the commissioned scope.
Typical evidence includes document analysis, location references, measurement records, survey or supervision reports, findings assessments, photographic records and recommendations for the next project step. The scope depends on the service and project phase.
Decisive factors include site size, demolition condition, fill, interfering objects, existing utilities, planned depths, access, construction phases, available documents, required methods and extent of documentation. Pricing requires current area and depth information and the commissioned investigation scope.
Industrial brownfield sites should be described with location references, existing structures, demolition condition, planned use, depth of intervention and existing reports.
Address, land parcels, site plan, subareas, construction site boundaries, plots, demolition areas and adjoining uses.
Excavation, drilling, foundations, utility installation, retaining structures, chamber, retention facility, excavation pit and planned design depths.
Utilities, existing structures, foundations, reinforcement, scrap metal, sealed surfaces, demolition condition, fill and access.
Aerial photograph assessment, historical reports, ground investigation data, conditions, construction phase, time windows and intended purpose of the documentation.
Send the site plan, land parcels, demolition or as-built plans, aerial photograph assessment, ground investigation and contamination documents, planned interventions, depths, construction sections and known interference areas as completely as possible. Partial information also helps where the intended next project step is clearly identifiable.
+49 (0) 6843 - 999 499 7
info@fontana-eod.de
Site plan, depth, construction phase, suspicion indicators
Site management, designers, HSE or project management
Whether historical aerial photograph analysis, explosive ordnance surveying, surface surveying using GPR, magnetometry or TDEM, deep-ground surveys, downhole surveys, excavation supervision, area clearance or ordnance recovery is needed depends on the location, ground disturbance, depth, ground and existing documents. An early ordnance assessment provides clarity for tendering, programming, occupational safety and construction.
FONTANA-EOD combines its Section 7 SprengG licence, specialists holding Section 20 SprengG certificates of competence, suitable survey and clearance methods, and traceable documentation. Send the site plan, depth of ground disturbance, construction phase and existing documents for an initial technical assessment.