Explosive ordnance detection for bridge construction and replacement bridges

Before bridge construction, abutments, piers, piles, excavations and temporary traffic areas are compared with existing suspected ordnance conditions. FONTANA-EOD assesses planned ground interventions and achievable investigation conditions. Send structural drawings, foundation depths and construction phases so that suitable investigations can be specified for demolition, replacement construction and handovers.

Divide the structure into areas

Distinguish abutments, piers and approach areas.

Record depths

Assign piles, shoring and drilling points.

Coordinate demolition and new construction

Document demolition and new construction.

Investigation requirements in bridge construction

Establish the investigation required for the bridge structure

In bridge construction, explosive ordnance detection is related to the planned abutments, piers, piles, shoring alignments and excavations. Suspected ordnance, intervention depth and the construction stage at which investigation is possible are decisive. Before each intervention, it is established which areas have already been adequately investigated and where supplementary measures are required.

Project references

Selected project examples

Bridge areas and construction phases

Plan approach areas, foundations and temporary areas separately

Bridge projects comprise working volumes that differ in location and time. Reliable planning distinguishes near-surface approach areas, deep foundations, linear shoring and areas accessible only after demolition.

Structural planning must also distinguish permanent elements, temporary auxiliary structures and areas used during construction. Only then can additional foundations and later demolition work be recorded completely.

Survey trolley on an undeveloped construction site, with soil piles and a row of trees in the background.

Replacement construction and demolition

Demolition and new construction provide different access to the ground in succession. Approach areas, existing foundations, later excavations and new foundations are therefore assessed separately by construction phase.

Documentation shows which conclusions are possible before demolition and which supplementary investigation follows in the working volume accessible later. Necessary investigations and protective measures for ground disturbance during demolition are specified before work starts.

When construction phases change, it is established which earlier results remain valid and which areas have become accessible or changed.

Assess the demolition and new-build sequence
Person beside a survey instrument on a construction site; a wheeled excavator with drilling equipment stands behind them.

Abutments and wing walls

Abutments, wing walls and ramps connect excavations over an area with deep foundation or shoring points. Existing utilities, slopes and traffic areas affect survey feasibility.

Area investigation, borehole points, sheet-pile alignments and excavation zones share a common location reference but remain technically separate investigation tasks.

A unique element number links fieldwork, drawing revision and subsequent acceptance of the abutment area.

Assess abutments and deeper ground
Person beside a survey instrument on a construction site; a wheeled excavator with drilling equipment stands behind them.

Piers and piled foundations

Pier and pile locations require point-specific investigation of the subsequent working volume. Coordinates, diameter, target depth and drilling or installation method are essential.

Relocated piles or altered pile groups are checked against the existing investigation status; conclusions are not inferred indiscriminately from neighbouring results.

The investigation sequence follows the actual installation dates of pile groups, rather than only their order in the point schedule.

Prepare pile and pier locations
Person beside a survey instrument on a construction site; a wheeled excavator with drilling equipment stands behind them.

Sheet-pile walls, shoring and anchors

Shoring alignments and tieback anchors run linearly or at an angle and may extend deep into previously uninvestigated areas. Existing measurements are checked to establish whether they cover the proposed location and depth.

Alignment, inclination, embedment depth, drilling method and safety zone are linked to survey planning.

Inclined working volumes are considered in three dimensions so that their path at depth does not fall outside the investigated corridor.

Investigate shoring and anchor alignments
Person with a tablet at the edge of a cordoned-off excavation, with an excavator behind.

Excavations, dewatering and waterside zones

Excavations near water combine changing ground levels, fill, dewatering and restricted access. Survey conditions may change with each excavation stage.

Accessible bases and slopes are assessed by section; zones that cannot be investigated receive a documented follow-up measure.

Proximity to water may restrict equipment access and survey timing; these conditions are considered before costing.

Coordinate the excavation sequence with specialist input
Survey trolley on an undeveloped construction site, with soil piles and a row of trees in the background.

Site establishment and temporary structures

Crane positions, access roads, assembly areas, temporary piers and temporary bridges may create additional ground interventions beyond the permanent structure.

Temporary areas are also considered in terms of load transfer, foundations, excavation and eventual demolition where they affect ground relevant to explosive ordnance.

Temporary structures receive the same specialist area and depth references as permanent structural elements.

Assess temporary working areas
Decision points in a bridge project

What needs to be established before design, procurement and foundation work

Explosive ordnance investigation follows design and construction progress. The earlier element geometry, accessibility and documentation objectives are established, the more reliably methods and dates can be coordinated.

Particularly for replacement bridges, the working volume that can be investigated is not static. It shifts with traffic diversion, demolition, excavation and the move into specialist foundation work.

Preliminary design and comparison of options

Historical indications of suspected ordnance are compared with possible structural locations, foundation types and proposed construction stages.

Options can then be compared not only structurally and in traffic terms, but also by additional investigation and access requirements.

Missing documents and their significance for further planning are identified.

Check the historical basis

Design and approval planning

Structural elements, drilling points, shoring alignments and excavations are related to the corridor of suspected ordnance. Undefined geometries remain marked as planning assumptions.

Technical investigation is developed further where the subsequent ground intervention requires reliable conclusions.

The investigation programme is refined as structural design progresses, without repeating work on already reliable background information.

Assess the design revision with specialist input

Tendering and specifications

The service specification, point schedules, depths, access, construction phases, qualification requirements and documentation required under the contract are clearly stated.

Provisional items receive specific triggers so that tenders remain technically comparable.

Measured quantities, work status and invoicing are linked to unique point and alignment identifiers.

Structure the tender documents

Piling, drilling and shoring work

Before specialist foundation works, it must be established which points and alignments have been investigated and to what depth. Design and actual locations are linked through unique identifiers.

Inaccessible points receive a technically justified alternative geometry or another follow-up measure.

Local setting-out is checked against the approved construction drawing before drilling starts.

Prepare deep interventions

Demolition and ongoing excavation

Existing elements and reinforcement can limit advance measurements. Demolition creates new areas with better access for technical investigation.

Necessary investigations and protective measures are specified even for ground disturbance during demolition. Suitable investigations, excavation layers, hold points and further surveying for the subsequent excavation are integrated into the construction sequence before work starts.

Newly exposed foundation remnants or fill may change the planned investigation sequence and are incorporated into the specialist assessment.

Plan the demolition sequence and excavation

Anomaly or find situation

Survey anomalies, technical interference sources and actual finds are handled separately by specialists. For survey anomalies, location, survey conditions and known installations are assessed. If a suspicious object is encountered, immediate protective measures and prompt notification of the emergency services apply.

Site management and project managers receive a clear subsequent decision that can be assigned spatially.

If a suspicious object is encountered, adjacent work must not continue solely on the basis of a self-selected boundary. Further action is agreed with the responsible authorities.

Assess the investigation of findings
Typical tasks in bridge construction

Which investigation is suitable for the planned ground intervention

Investigation results apply to the structural elements, depths and construction phases described.

The specialist conclusion is therefore assessed not only by area and depth but also by when the investigation took place. A result obtained before demolition may be insufficient for the foundation area exposed later.

Historically substantiated suspected ordnance

Initial situation: The structural corridor lies within an area with historical indications or an area not yet fully assessed.

Next step: Sources and areas of suspected ordnance are related to abutments, piers, ramps and site establishment.

Documentation: Spatially substantiated subareas and a recommendation for technical investigation.

The scope of sources depends on the decision actually needed for the structural option.

Accessible approach area

Initial situation: The approach area, slope or ramp area is freely accessible and requires near-surface work.

Next step: A suitable area-based method is selected according to the target object, surface and interference conditions.

Documentation: survey area, anomalies, limitations and follow-up decision.

Even apparently open approach areas may be affected by technical interference from utilities, safety barriers or earlier construction phases.

Deep foundations or retaining-work alignment

Initial situation: The planned ground intervention for a pile, pier, sheet-pile wall or anchor extends beyond the demonstrated detection depth of the surface measurements.

Next step: Point- or line-specific deep-ground surveying is aligned with the subsequent intervention geometry.

Documentation: Coordinates, target and investigation depths, interference and point status.

The point investigation is related to the subsequent load-transfer and working volume, not merely the centre of the axis.

Existing structure with interference

Initial situation: Reinforcement, foundations, utilities or steel elements obscure advance measurements.

Next step: Accessible edge areas are assessed separately; remaining zones are assigned to a later investigation stage.

Documentation: Spatially identified limitation and planned supplementary investigation.

The later investigation stage is already described in the schedule of services with access requirements and timing references.

Excavation after demolition

Initial situation: Only demolition makes the actual ground and new excavation bases accessible.

Next step: Investigation and excavation are organised by layer and section.

Documentation: Bases and slopes investigated, interruptions and further measures.

Release of the next excavation section remains tied to the documented excavation base and lateral boundaries.

Anomaly or confirmed finding

Initial situation: surveying or excavation reveals an anomalous location.

Next step: Survey anomalies are evaluated by specialists. If a suspicious object is encountered, immediate protective measures and prompt notification of the responsible authorities apply.

Documentation: Location, work carried out, handover and delineation of areas still unresolved.

Findings and the investigation status of the structure are documented separately. No conclusion about adjoining areas may be inferred without specialist assessment.

Records for structural designers and site management

What documents structural designers and site management need

Documentation must link the structural element, location, depth, method, construction stage and subsequent decision. Before further work, it is checked whether the result covers the planned ground intervention in specialist foundation engineering.

Element-specific documentation is preferred for the project file because it directly links structural design and construction to the actual stage of investigation.

Project and element reference

The structure number, drawing revision, coordinate system, abutments, piers, ramps, excavation and construction section form the spatial basis.

Changes during design and construction are updated with their date and revision.

Element-specific filing facilitates handover between design, detailed design and construction supervision.

Basis for historical assessment

Aerial photograph assessments, archival sources, information from authorities, earlier finds and existing reports are documented with their scope.

Contradictions or missing information remain visible as specific clarification items.

Source references show later designers which documents underpin the spatial assessment.

Point and alignment register

Pile, drilling, mast, anchor and shoring points receive unique identifiers with target depth, geometry and the associated structural element.

Design changes can thus be checked against the investigation status already achieved.

Point status includes not only surveyed or unresolved, but also the depth reached, limitations and necessary follow-up.

Survey and borehole data

Survey areas, borehole geometries, depths reached, interference sources, raw data and evaluation use the same location reference.

Areas that cannot be evaluated or accessed are delineated spatially.

Data formats and the coordinate system are agreed before fieldwork. Location information from different drawing revisions is compared before use.

Findings and construction-phase status

Anomalies, exposures, excavation layers, hold points and actual findings are assigned to the relevant construction stage.

This keeps clear whether a conclusion was established before demolition, after demolition or during excavation.

Construction-phase status is updated after each relevant exposure or drawing revision.

Report and recommendations for further action

The final record describes the areas and depths investigated, method limitations, unresolved areas and the next step required.

The conclusion is not extended beyond the documented element and construction-phase reference.

Acceptance documents explicitly identify which structural elements or depths were not included in the commission.

Bridge construction documentation dossier

Assign drawing revisions, survey data and results to structural elements

A bridge project generates different specialist documents across several drawing revisions and construction phases. The dossier brings this information together on a common spatial and element-specific basis.

Point schedules, site plans and field logs therefore use the same element identifiers and state their respective revision.

Source and drawing register

Historical evidence, site plans, structural drawings and revisions are maintained with clear names.

This keeps the geometry underlying each assessment traceable.

Before a point schedule is used, its revision is checked against the current construction design.

Element and point schedule

Abutments, piers, piles, shoring, anchors and excavations use a common identification structure.

Status, depth and follow-up measures can thus be evaluated for each structural element.

Element identifiers are also used consistently in photographs, daily reports and findings notifications.

Survey and borehole dataset

Raw data, survey lines, drilling records, depth information and evaluation are organised by section and method.

The data structure supports later specialist review or design revision.

Original data and processing versions remain archived separately.

Anomaly and findings register

Anomalies, exposures and actual findings are linked to location, stage of investigation and project decision.

Unresolved items remain clearly distinguished from resolved findings.

Each follow-up measure is assigned a responsibility, timing reference and unambiguous location.

Construction-phase overview

Preliminary investigation, demolition, excavation, foundation work and new construction are maintained in an updatable status overview.

This allows site management to identify the working volume released at each stage.

Partial handovers are retained in the overall overview until work on the structural area is fully complete.

Handover and project file

The report, drawings, point schedules, limitations and communication records are handed over in the agreed form. After actual exposure or clearance work, the corresponding findings and clearance records are included.

Later changes can be checked specifically against the existing scope of work.

An attachment register identifies the associated reports, drawings and point schedules for handover to subsequent parties.

Bridge construction project sequence

From suspected ordnance assessment to documented construction-section handover

The sequence is adapted to design maturity, demolition sequence and specialist foundation work. Each step answers a specific question for the next construction section.

The fieldwork sequence is linked to critical dates for foundations, shoring and excavation clearance. Time for investigation, evaluation and handover is allowed before subsequent construction work.

01

Record the structure and investigation objective

The project type, existing structure, demolition scope, new-build geometry, construction phases and information required are clearly described.

02

Assess documents and suspected ordnance

Historical sources, as-built drawings, ground investigation data, utilities and earlier explosive ordnance documents are related to the structural corridor.

03

Break down structural elements and ground interventions

Approach areas, abutments, piers, piles, shoring, anchors, excavations and temporary areas receive their own investigation geometries.

04

Define methods and timings

Area measurements, deep-ground surveys, investigations after demolition and explosive ordnance detection during construction are assessed for suitability for each intervention and planned accordingly.

05

Prepare setting-out and fieldwork

Points, axes, working areas, exclusion zones, equipment access and communication routes are agreed before work starts.

06

Carry out surveying and monitoring

Measurements, borehole investigations or layer-specific excavation works are carried out to the agreed geometry.

07

Assess data and findings

Measurements, anomalies, exposures and limitations are checked for plausibility against the structural element, suspected ordnance and subsequent ground intervention.

08

Handing over a documented construction section

The report, drawings, point status and outstanding measures are prepared for structural designers, the specialist foundation contractor and site management.

Technical planning

Which geometries must be established before method selection and costing

Bridge construction combines approach areas, deep point-specific ground interventions and linear shoring alignments. Technical planning must therefore go beyond a general area boundary.

Technical details are particularly important for inclined anchors, pile groups and spatially offset shoring alignments because small design changes may cause large positional differences at depth.

The subsequent working volume determines the investigation geometry

An abutment may comprise an excavation, foundation slab, piles, wing walls, tieback anchors and utility crossings. Each component has its own location and depth. Survey planning relates to this geometry, rather than to a blanket area around the structure.

For piles and boreholes, point locations, diameters, target depths and installation methods are required. Shoring alignments and anchors additionally require direction, inclination and embedment depth. Near-surface measurements remain limited to the volume technically covered.

Existing foundations, reinforcement, steel elements, utilities and traffic areas can obscure survey data. These influences are recorded before construction and linked to the demolition sequence and supplementary investigations.

If the construction design changes, results for new points and alignments are not automatically adopted from earlier results. It is checked whether the new working volume still lies within the documented investigation geometry.

Abutment and foundation slab

The excavation, foundation dimensions, base depth and adjoining wing walls determine the area and depth zone to be investigated.

The boundary includes working space for formwork, blinding concrete and lateral ground replacement.

Pier and pile group

Each pile is recorded with coordinates, diameter, target depth and an element identifier. Group-level conclusions do not replace missing individual points.

For pile groups, spacing, overlap of investigation zones and possible replacement points are assessed by specialists.

Sheet-pile and soldier-pile walls

Alignment, embedment depth, soldier-pile spacing and installation method determine whether line- or point-specific deep investigation is required.

Even temporarily relocated shoring alignments may create new depth zones that have not previously been investigated.

Tieback anchor and micropile

Inclination, length and spatial path are related to the depth zone of suspected ordnance. Surface measurements do not automatically cover inclined working volumes.

The three-dimensional location of inclined elements is described by their starting point, direction and length.

Demolition and excavation stage

Newly accessible bases and slopes receive their own investigation status. Areas previously obscured remain marked as unresolved until then.

Demolition progress and the newly accessible base are confirmed by surveying before each subsequent measurement.

Temporary foundations and crane areas

Temporary piers, access roads and crane positions are considered where load transfer or ground disturbance reaches relevant depths.

Crane loads or temporary piers may create a load-transfer and foundation volume relevant to explosive ordnance even without deep excavation.

Select an investigation

Define investigation geometry from the bridge design

Two people with a tablet beside a marked construction area; plans lie in the foreground.

Describe the construction stage and ground intervention

Before bridge construction, replacement or strengthening, investigation requirements are established for the planned ground interventions. The deciding factors are not only the site area, but the specific element geometry, proposed depth and construction stage at which investigation can be carried out.

Determine investigation requirements for the structure
Two people with a tablet beside a marked construction area; plans lie in the foreground.

Distinguish areas, deep points and survey limitations

Approach areas, ramps and near-surface excavations can be investigated across their extent if surface and interference conditions permit. Piled foundations, piers, abutments, sheet-pile walls and tieback anchors require separate point or line geometry. A general area conclusion does not automatically cover these depth volumes.

Existing structures, reinforcement, utilities and traffic installations may limit measurements. Areas not adequately investigated are marked on the drawing. It is assessed when they will be accessible and which supplementary method is suitable for the planned ground intervention.

Select methods according to geometry and survey conditions
Define the technical scope of services

Which methods suit the geometry of the bridge structure

The methods measure different properties and have their own spatial limitations. Their combination follows the structural geometry rather than a fixed sequence.

Documents, survey conditions and intervention geometry determine which investigation is possible before each construction phase. Technical limitations are assigned to a specific working volume and documented with a suitable follow-up measure.

01

Historical aerial photograph analysis

Establishes whether and in which subareas historically substantiated suspected ordnance exists.

It does not establish which objects are actually present in the ground today.

Historical assessment prioritises areas but does not alone determine the subsequent field method.

02

Surface survey

Investigates accessible approach areas, ramps or near-surface excavations using a suitable geophysical method.

Existing structures, utilities and reinforcement may limit interpretability.

Area measurements are used only in technically accessible zones with sufficiently low interference.

03

Deep-ground and downhole surveys

Investigates defined pile, drilling, shoring and anchor geometries at greater depth.

The conclusion remains limited to the specified points, alignments and survey paths.

Before borehole surveying, drilling points, depths and location references are specified. During evaluation, these details are compared with the boreholes actually completed.

04

Investigation after demolition

Uses the new construction stage where existing foundations or pavement construction prevented earlier measurements.

The timing is coordinated with the demolition and excavation sequence.

The demolition stage is organised as a separate investigation point with a clear interface to the demolition contractor.

05

Excavation monitoring

In a technically suitable explosive ordnance survey alongside construction, each working layer is surveyed using technical equipment and assessed. Controlled removal in layers and supplementary visual inspection follow; these steps are repeated down to the agreed excavation base. Simply watching excavation is insufficient. The ground volume, interference zones, hold points and remaining areas are documented.

06

Exposure and recovery

Individual suspected points are professionally exposed and assessed. Recovery of confirmed explosive ordnance is coordinated with the permitted scope of activity and local responsibilities.

It does not replace investigation of areas outside the working area.

Exposure and recovery relate to specific locations and are not presented as a general area-based service.

07

Magnetometry

Magnetometry detects magnetic anomalies, particularly those caused by ferromagnetic objects. It can be used to investigate suitable unobstructed survey areas. Reinforcement, vehicles, shoring and other iron masses may obscure signals. The survey grid, interference areas and areas capable of evaluation are documented; a magnetic signal does not yet identify an object.

08

TDEM

TDEM detects time-dependent electromagnetic responses from conductive objects. Target size, depth, survey geometry and the technical surroundings determine the achievable statement. Utilities, reinforcement and metal installations may limit evaluation. Results are checked against the basis for suspicion and further investigations; the method does not replace other methods indiscriminately.

09

Ground-penetrating radar

Ground-penetrating radar records reflections of electromagnetic waves at material boundaries. The data may reveal structures, utility routes or anomalies in the ground investigated. Soil, moisture, conductive layers, reinforcement and survey geometry affect penetration and evaluation. A radar anomaly alone does not identify explosive ordnance or support a general statement for deeper interventions.

Working on bridge projects

How design, explosive ordnance surveying and specialist foundation work are coordinated

Structural elements, investigation areas, suitable methods and required documentation are specified before work starts. Results are then assigned to the construction stage actually investigated.

Quality assurance covers not only survey data but also surveying, drawing checks, field logs and specialist plausibility checks of anomalous signals.

Document results separately for demolition and new foundations

FONTANA-EOD plans investigations from the proposed ground interventions. Approach areas, pile points, shoring alignments and excavation zones are treated separately by specialists but linked through the same location and drawing references.

Method limitations are considered during work preparation. Where reinforcement, existing structures or utilities restrict measurements, a traceable later investigation stage is specified instead of a blanket conclusion.

During construction, design changes and newly accessible areas are updated. Conclusions remain tied to the area and depth volume actually investigated.

Reports and drawings show structural designers and site management which areas were investigated, which limitations exist and which investigations remain outstanding.

A clear task

The structural element, area, depth, construction stage and information required are specified before work starts.

Justified methodology

Methods are selected according to the target object, ground, interference conditions and intervention geometry.

Drawing revision checks

Point schedules, alignments and structural drawings are checked for their revision before deployment and handover.

Spatially precise quality assurance

Survey data, drilling logs, findings and limitations remain spatially assigned.

Transparent limitations

Inaccessible areas or areas that cannot be evaluated are clearly identified.

Documents for site management

The report answers the project question and identifies the next specialist step.

Prepare the next construction section

Relate investigations to structural progress

Hand over investigated elements traceably

The project file must show which section was investigated, using which method and to what depth. Structural designers, specialist foundation contractors and site management can thus use results for each element.

Distinguish demolition from new foundation work

For replacement bridges, investigation requirements are determined separately for demolition of existing structures, new abutments, pier axes, auxiliary foundations and temporary construction stages. This keeps clear which conclusions are needed before demolition and which are needed only for the final foundation geometry.

Roles and coordination

Who designs, surveys and carries out investigations

Before work starts, it is specified who reports design changes, commissions investigations and passes results to structural designers, specialist foundation contractors and site management.

Client

Road authority, municipality or project promoter

Defines the structural objective, construction phases, investigation volume and decision required for preliminary planning, procurement or construction.

Ensures that demolition, new-build and foundation documents are provided at a consistent drawing revision.

Structural design

Bridge and civil engineering design

Translates the structure into abutments, piers, piles, shoring, anchors and temporary foundations with clearly defined geometry.

Communicates drawing revisions so that their effect on points and alignments already investigated can be assessed by specialists.

Ground conditions and surveying

Geotechnical engineering, surveying and utility coordination

Provide ground investigation data, level references, coordinates, existing utility information and local conditions for survey planning.

Maintain the relationship between the planned element, the set-out point and the documented investigation volume.

Construction execution

Bridge construction, specialist foundation engineering and site management

Implement the demolition sequence, excavations, piles, shoring and working areas according to the agreed drawing revision.

Changes to point location, depth, installation method or construction stage are communicated to the specialist parties before ground intervention.

Specialist service

FONTANA-EOD

Assesses the basis for suspicion and element geometry, plans the agreed investigation and documents results and method limitations.

The conclusion remains tied to the structural area and depth range actually investigated.

Hazard response

KBD, KMBD, KRD and local authorities

In Germany, the ordnance disposal services of the federal states and the locally competent authorities carry out hazard-response and find-management duties. Their involvement is established for the project location; outside Germany, local responsibilities apply.

If a suspicious object is encountered, immediate protective measures and prompt notification of the emergency services apply.

The local public order authority and building control authority may be involved depending on the procedure and construction task. Responsible contacts, conditions and reporting routes are assigned to the project location and the work sections concerned. Technical investigation, construction organisation decisions and official handling of ordnance finds retain their respective responsibilities.

Project documents in bridge construction

What records are used in practice by designers, specialist foundation contractors and site management

The work results link historical evidence, deep investigation geometry, excavation status and subsequent decision in an element-specific project file.

Photographs, survey data and reports are filed with the associated element identifiers.

Four people in orange high-visibility vests in front of two excavators on a construction site.
Person with a yellow survey cart on a footpath in front of a hedge.
Identify the project location

Identify the structure number and subareas

Illustrated map of Germany with location markers on a construction site.

Site plan and existing requirements

State the project location and structure number, and mark abutments, pier axes, auxiliary foundations and shoring on the drawing. Add the drawing revision and relevant levels. Investigation reports can then be assigned correctly even when demolition and new construction take place in several sections.

Use results correctly

Compare depth volumes and responsibilities in bridge construction

Assess foundation changes separately

Altered pile positions, anchor lengths or excavation depths may fall outside the previous investigation volume. A report must therefore be compared with the foundation actually proposed before it is used as a basis for that ground intervention.

Check foundation-specific documentation

Relate explosive ordnance findings and structural checks

The explosive ordnance investigation provides a specialist conclusion for the volume of ground investigated. Bearing capacity, shoring safety and construction-operational authorisations remain separate tasks for the responsible project parties.

Distinguish tasks and limits of conclusions

Technical information

Roadworks and civil engineering: brochure

How can carriageways, bridges and deep excavations be investigated for ordnance? The brochure explains preparation, suitable survey methods and supervision of earthworks.

1 / 8
Roadworks and civil engineering: brochure – page 1

German · 8 pages

Questions about bridge construction

Frequently asked questions about explosive ordnance detection at bridge structures

When should explosive ordnance detection for a bridge structure begin?

Specialist assessment should begin as soon as location, structure type, construction phases and planned ground interventions can be identified. For replacement bridges, strengthening, abutments, piers, piled foundations, shoring and demolition, historically suspected ordnance, accessible areas, deep point-specific ground interventions and construction stages must be linked before tendering. Preliminary area investigation, deep-ground surveys and construction-stage measures can then be distinguished in good time.

Which areas of a bridge project require their own investigation geometry?

Abutments, piers, pile groups, sheet-pile walls, anchors, excavations, ramps, slopes, utility crossings and site establishment areas affect the ground in different ways. Measurements in the approach area do not automatically address deep foundation or shoring points. Each area is therefore described by coordinates, element geometry, target depth, construction method and proposed construction stage.

Is a surface survey sufficient for piles and abutments?

A surface survey can investigate accessible areas and near-surface working volumes. For deep piles, boreholes, sheet-pile walls or anchors, it is checked whether the required depth can be covered from the surface or whether a deep-ground or borehole survey is needed. The determining factor is whether the entire subsequent working volume lies within the demonstrated investigation geometry. Unrecorded depths or relocated points are assessed separately.

What should you do if a suspicious object is found?

Stop work in the affected area immediately. Do not touch or move the object or expose it further. Leave the immediate area, keep others away without putting yourself at risk, and in Germany notify the police immediately on 110. Outside Germany, use the local emergency reporting route. Then inform site management. The responsible authorities determine further investigation and the involvement of the explosive ordnance disposal service under the local procedure. A measured anomaly alone is assessed under the agreed specialist investigation procedure.

What documents are needed for an initial project review?

Helpful documents include site and structural drawings, construction phases, demolition and new-build geometries, pile and borehole schedules, shoring alignments, ground investigation documents, utility drawings, historical assessments, authority correspondence and existing survey reports. Preliminary drawing revisions can be used if their revision, assumptions and unresolved element dimensions are clearly identified.

Include existing information and conditions from authorities with their dates, complete attachments and spatial scope. In Germany, the responsible explosive ordnance disposal service, local public order authority and, where applicable, building control authority are identified for the project location. Outside Germany, coordination takes place with the authorities responsible there. Outstanding questions are assigned to the actual construction section.

How are demolition and new construction linked in terms of explosive ordnance?

Demolition may make areas accessible that were previously obscured by the structure, reinforcement or traffic. Necessary investigations and protective measures are specified before ground disturbance during demolition. Investigations are organised by construction phase. Previously surveyed approach areas, newly accessible excavations, deep foundation points and excavation layers investigated using technical methods each receive their own status. This keeps clear which conclusion applies to which construction stage.

What does the documentation for site management and the project file contain?

Documentation links project and element references, drawing revision, basis for suspicion, survey or borehole geometry, depths reached, interference zones, anomalies, findings and subsequent decisions. Inaccessible areas and areas restricted by method limitations are identified spatially. Conclusions remain limited to the area actually investigated and the documented construction stage.

What determines the effort, duration and costs?

Relevant factors are the number and depth of foundation points, area, construction phases, accessibility, traffic safety measures, existing structure, utilities, dewatering, ground, required methods, data and documentation scope and time windows. Reliable costing therefore requires clear element and point schedules, current drawings and the date by which each conclusion must be available.

Enquire about a bridge project

We need these documents for your bridge structure

An initial enquiry does not need to contain a finished schedule of services. It should, however, identify the structure location, proposed interventions, relevant depths and current construction stage.

Enquiry preparation therefore considers not only structural geometry but also time constraints, access and the planned sequence of specialist foundation works.

Structure and drawing revision

Provide the site plan, structure number, demolition and new-build geometry, abutments, piers, ramps and current drawing revision.

For alternatives, it should be clear which geometry is to be investigated and which is considered only as an option.

Foundations, shoring and depths

Include pile, borehole and anchor schedules, shoring alignments, target depths, diameters and installation methods.

Excavation depth, demolition sequence, dewatering and temporary foundations affect method selection.

Documents and decision date

Historical assessments, correspondence with authorities, ground investigation and utility drawings, earlier survey reports and known findings are helpful.

State when the conclusion is needed for design, tendering, specialist foundation work or site management.

For initial specialist assessment

A site plan, brief structural description, pile or shoring overview, maximum depth, construction phases, planned period and existing indications of suspected ordnance are often sufficient for an initial assessment.

FONTANA-EOD then identifies the documents still required and the appropriate service scope for approach areas, deep points and excavation zones.

Parts of the structure

Abutments, piers, ramps, approach areas, excavations and temporary working areas.

Deep interventions

Piles, boreholes, sheet-pile walls, anchors, target depths and installation methods.

Construction sequence

Demolition, dewatering, traffic phases, access and decision dates.

Documentation objective

Basis for design, procurement, specialist foundation work, site management or the project file.

For staged bridge works, the initial enquiry can be limited to priority structural elements. Later additions use the same element identifiers and state the relevant drawing revision.

GPR on a construction site
Project enquiry

Have your project assessed

Whether historical aerial photograph analysis, explosive ordnance surveying, surface surveying using GPR, magnetometry or TDEM, deep-ground surveys, downhole surveys, excavation supervision, area clearance or ordnance recovery is needed depends on the location, ground disturbance, depth, ground and existing documents. An early ordnance assessment provides clarity for tendering, programming, occupational safety and construction.

FONTANA-EOD combines its Section 7 SprengG licence, specialists holding Section 20 SprengG certificates of competence, suitable survey and clearance methods, and traceable documentation. Send the site plan, depth of ground disturbance, construction phase and existing documents for an initial technical assessment.