Specialist personnel with a tablet at a marked-out construction site in front of a building complex.

Ordnance assessment for fire stations, municipal depots and ambulance stations

A vehicle hall is to be extended, a yard renewed or a utility installed while the site remains in use. FONTANA-EOD clarifies with designers and site management the survey needs for the proposed work in the ground. Tell us which access routes are needed and when. On this basis, the survey areas and their sequence are coordinated with the operator.

Record the structures

Distinguish buildings and external areas.

Specify access routes

Report operational requirements early.

Hand over stages

Mark surveyed areas and those still outstanding.

Municipal project overview

Context

The hall footprint describes only part of the project

At fire stations, municipal depots and ambulance stations, planned building, yard and utility works are checked against the available ordnance records. Required access routes and temporary arrangements create additional conditions for access and the construction sequence. FONTANA-EOD coordinates the survey task with designers and site management, while the operator specifies the requirements of the working site.

Investigation task

Check existing findings against new interventions

Two people with a tablet beside a marked construction area; plans lie in the foreground.

Define the planned work in the ground

At an operational site, planned groundworks may extend across the hall, workshop, yard, drainage and technical connections. Even a temporary modular building or relocated access route may require additional foundations and utilities. The initial plan should therefore show all areas likely to be affected.

Choose survey services for the operational site
Two people discussing plans at a table beside a vehicle on a construction site.

Apply existing conclusions to the appropriate areas

Previous use of a site or experience from earlier construction works does not, by itself, show that the ground has been surveyed for ordnance in relation to the planned interventions. Previous alterations may have left records, but their scope must match the new project. A survey for part of a hall covers a deeper excavation or a new utility route only insofar as these fall within the documented survey scope.

Compare existing evidence with the alteration works
Project types

Buildings, yards and operational access routes

Person beside a survey instrument on a construction site; a wheeled excavator with drilling equipment stands behind them.

Extending a hall within an existing site

An additional vehicle hall may require foundations, working space, utility connections and individual deeper structures. These are described together even if they come from different specialist designers. The existing hall and metal installations are also relevant conditions for the survey. Earlier reports are compared with the new volume of ground affected. Previous use is recorded as an organisational condition; the proposed new groundworks are checked against survey findings that match them spatially and technically.

Survey the planned foundation areas
Two people with a tablet beside a marked construction area; plans lie in the foreground.

Yard alteration with drainage

For a yard, area-wide excavation and local deeper works must be distinguished. Drains, attenuation, connections and lighting foundations may reach different ground volumes from the general pavement structure. Sections and depth information therefore supplement a plan of the finished surface. The survey description also states which materials, vehicles or installations will remain on site. The technical planning can then account for restrictions on access or measurement conditions.

Agree methods for the yard and deeper areas
Project enquiry for ordnance assessment and surveys.

Temporary operations during construction

A temporary parking area, diversion or modular building location may require its own groundworks. These works are shown alongside the permanent development and described in terms of their proposed construction. The operator explains which connections and areas are needed for operations. Those involved coordinate whether surveys and operations can take place in parallel, considering the technical method and actual local conditions.

Coordinate temporary areas and access routes
Prepare the decision

Prepare the next work step technically

Entrances and exits must remain accessible

The required routes are specified together with their timing requirements. Survey areas, construction stages and the actual availability of routes needed for operations are coordinated on site. Coordination begins with the actual operations during each construction phase. The operator describes the entrances, exits, connections and delivery areas required. Site management assigns this information to work areas and construction times. The specialist contractor can then see where and when the commissioned survey can be prepared and performed. Changes to access or stage sequence are communicated before the affected work. Even an area available only temporarily is clearly identified. If a section initially remains outstanding, its later survey is treated as a separate task. Results from the first stage are handed over with their limits. Technical survey planning and operational route arrangements thus remain coordinated.

The hall and external areas are procured separately

Both contracts refer to a common overview plan. The survey scope is assigned to the respective structures so that areas between contracts are not inadvertently overlooked. At the interface between hall construction and external areas, the respective groundworks are shown in the common plan. Building foundations, yard drainage, utility connections and additional working spaces may meet spatially or be built in different phases. The client and site management clarify which survey instruction covers which of these works. Outstanding areas between them remain identifiable. If a building connection or utility alignment changes, the specialist contractor receives the new plan for assessment. The report names the areas actually treated so that both construction contractors can use the same basis. Necessary additions are also assigned to the relevant contract and construction stage. The technical work thus remains traceable across separate procurements.

A new deeper point is planned

Additional excavations, chambers or foundations receive a clear elevation reference. They are checked against the previous results even if the rest of the yard or building footprint remains unchanged. For an individual deeper structure, the change in location and depth from the previous design is shown. The determining factors are the working space actually needed and the interventions planned for construction. An earlier assessment of the surrounding yard can be used only within its documented limits. The designers pass on the new task with current elevation and location references. The specialist contractor checks which existing findings apply and where further clarification is needed. After a supplementary survey, the structure and plan revision to which the result refers are recorded. Site management receives this allocation with the report appendices before coordinating further construction accordingly.

Project-specific tasks

Show buildings, yard and required access routes in the plan

01

Halls and technical structures

Foundations, excavations, chambers and other deeper areas are described with their intended location and depth. What matters is the ground actually affected. In addition to general excavation depths, specify individual deeper structures and adjacent working spaces.

02

Yard, drainage and utilities

Pavement structure, drains, attenuation, new building connections and lighting may each require groundworks. Their locations are added to the building plan. This also applies where external works are carried out under a separate contract or at a later date.

03

Required entrances and exits

The operator specifies which traffic routes are needed and in which time windows. Specialist designers and site management coordinate the available survey areas accordingly. The responsible parties agree whether and how operations can continue during the works, taking account of the survey and the site's operational requirements.

04

Temporary arrangements and construction stages

An intermediate condition may affect different areas from the completed development. Temporary utilities, equipment positions and diversions are therefore also shown. At a change of stage, it must be clear which areas have been surveyed, which remain outstanding and which have been added by new planning. The completion documentation records the scope actually treated and its limits.

Project documents

These documents connect the instruction and result

Common construction and access plan

The overview plan shows halls, yard, connections and required traffic routes. The survey and operational planning thus use the same spatial basis. Their respective responsibilities and decisions remain expressly distinct. The common representation connects the technical construction task with the areas actually available for it. For every phase, it remains traceable which routes are still needed and which work areas are accessible. If routes change, the specialist contractor receives the relevant revision for coordination. Conversely, outstanding survey areas are reported back to designers and the operator so that they can be considered in the subsequent sequence. The appendices are maintained with dates or revision numbers. Different parties can thus unambiguously identify the same area. The plan supports coordination of buildings, external areas and operations, while each technical decision remains with the responsible party.

Individual technical structures

Excavations, foundations, drainage structures and utilities are listed with location and depth. An individual deeper structure within an otherwise shallow yard remains visible. Changes to these structures are communicated before construction. Each structure receives an identifier used in the instruction, design and result. The working space needed for construction and intended connections to utilities or drainage are shown. In a revised design, old and new versions remain distinguishable. Depths or dimensions still missing are identified as outstanding design information. The specialist contractor can then relate the survey task to the construction actually described. For handover, the plan used, result and limitations are kept together. A later change can thus be checked specifically without inferring the earlier conclusion merely from the structure's name.

Stage-by-stage handover

A report describes the areas treated and their limits. Site management assigns it to the respective stage. For neighbouring areas cleared of obstacles later or newly affected, survey needs are clarified separately before the respective work in the ground. For the next construction phase, the works actually covered by the available results are explained. Changes to the yard, building sections or connections are therefore communicated with location and depth. After an additional survey, the outstanding area it concerns and the previous findings it relates to remain identifiable. The operator and site management receive the current documents with the relevant appendices. Even if the construction contractor changes, it remains traceable which questions have been answered and where further coordination is required before construction.

Construction phases

Keep construction phases and changes traceable

First stage alongside an operational site

For the first construction stage, the accessible areas and the routes needed for operations are recorded. The survey relates to the actual volume of ground affected. If an area is temporarily used for storage or equipment, this may change its later accessibility. Intermediate conditions are therefore considered when setting the sequence. Results remain stage-specific; completion of part of a hall does not establish a conclusion about an access route not yet surveyed.

Changing access routes and temporary arrangements

Changed operational arrangements may require new surfacing, drainage or utilities. These additional interventions are included in the plan before construction. The ordnance records are compared with the new scope. Even if the change is needed at short notice, the technical survey and operational decision remain separate tasks. Site management coordinates the design, proposed specialist works and the site requirements specified by the operator.

Documented handover for operations

After each survey step, results, limitations and outstanding areas are assigned to the current plan. This gives the operator a basis for future extensions and maintenance. Route use and operational readiness are decided in light of the whole situation. Technical operational matters and emergency response arrangements are clarified separately by the respective responsible parties. The complete plan appendices and the described survey scope therefore remain accessible for later groundworks.

Documentation

Use reports for further construction and operational planning

Assign the results to the project

The survey report shows which areas were covered and what limitations apply. The operator uses this information with the responsible project parties for further construction and operational planning. The responsible parties decide on access routes and operational readiness based on the survey results and operational requirements. After actual exposure or clearance works, the relevant findings and clearance records are included.

Coordinate tasks and further works

Location references and outstanding residual areas should be retained for future extensions. Particularly at sites used over many years, this documentation helps target comparisons between new works and earlier findings.

Next steps

Clarify operational requirements before the survey begins

01

Show the full construction scope

Show buildings, yards, connections and temporary ancillary facilities on a common overview plan.

02

Provide old plans and reports

Provide old construction and ordnance records with their plan appendices, together with information on the existing site. Available information and survey reports are checked against the current plan revision, spatial coverage and outstanding questions about the present construction task. If historical questions remain, the necessary sources are researched and aerial photographs assessed. Findings are related to the current building, yard and connection areas and used for survey planning.

03

Coordinate access and sequence

Agree with the operator, designers and site management which areas are accessible for the survey and when. The suitable survey method is defined for the respective interventions in the ground and local conditions.

04

Carry out the investigation

The commissioned survey is carried out within the defined area. Measurement data, findings and limitations are recorded with location, depth and plan references.

05

Assess results

Measurement data and findings are assessed by specialists. Outstanding areas, necessary follow-up surveys and the next decision are identified for designers and site management.

06

Document by stage

Assign results to the respective plan revision and work area, and mark outstanding surveys in the plan.

Technical assessment

Check installations and access before selecting the method

Existing metalwork and structures

Halls, fences, utilities, stored materials and reinforced surfaces can make interpretation of a Surface survey more difficult. The existing condition forms part of preparation. The suitable method depends on the survey task and site conditions, not solely on the type of operation.

Consider old foundations and utilities

A yard cleared of obstructions may improve access, but does not automatically remove subsurface influences. Old foundations, fill or utilities remain relevant information. Necessary surveys and protective measures are planned before interventions in the ground to remove old foundations, break out surfaces, clear vegetation or create work areas and access routes. Areas that become accessible later are surveyed before the respective subsequent interventions.

Keep plan changes updated

If an access route is moved or an excavation deepened, the assessment task may change. The new plan revision is compared with the existing report. Surveyed areas and those not covered must remain distinguishable even during ongoing operations.

Method selection

Select methods according to the task and survey conditions

Historical records and aerial photographs

Historical aerial photograph assessment and other old records help place the basis for suspicion in its spatial context. The available images, their evidential value and the limits of the area considered matter. The absence of an identifiable indication must be distinguished from a technically surveyed ground area. The assessment is considered together with the planned intervention and other available findings. It can support the choice of a survey, but is not a measurement of the present-day subsurface or confirmation for all future works.

Understand aerial photograph assessment

Magnetometric survey

Magnetometric methods detect magnetic anomalies. Whether they can address the specific survey task depends, among other things, on the expected objects, ground conditions, interference and required survey area. Fences, utilities or existing structures may affect interpretation. A measurement signal is therefore not described as ordnance solely because of its strength. Method, interpretation and any further investigation are planned as a connected specialist task.

Understand the scope of magnetometry

Electromagnetic methods and TDEM

Electromagnetic surveys may be suitable for particular metallic targets and site conditions. TDEM detects the time-dependent electromagnetic responses of electrically conductive bodies. Suitability is justified for the particular task, not inferred merely from the availability of equipment. Interfering installations, accessible areas and the required conclusion must also be considered. Results are documented with location and survey conditions. Whether a complementary method is needed follows from the specialist assessment and remains a specific project decision.

Understand electromagnetic surveying

Ground-penetrating radar

Under suitable conditions, ground-penetrating radar can provide information about subsurface structures and reflections. Ground conditions, moisture, installations and the particular survey task affect interpretability. An anomaly is not automatically ordnance, and an area with no apparent anomalies is not general evidence for arbitrary depths. The specialist interpretation and its limits are documented with the instruction. A survey for another purpose is not adopted without checking as ordnance evidence.

GPR and limitations

Deep-ground and downhole surveys

For deeper interventions, it may be necessary to check whether a surface survey can provide the required conclusion or whether another approach is needed. Location, depth, borehole layout and existing utilities then form part of preparation. Access for the survey must also be planned appropriately from a technical perspective. A general depth figure or standard grid does not replace this task. Results remain tied to the areas actually treated and the method applied. For surveys from investigation boreholes, casing, drilling depth and documentation are also coordinated with the task and local conditions.

Prepare deep interventions

Survey during construction

If a necessary preliminary survey cannot be completed in full, the suitability of a technically planned approach during construction is assessed. Each working layer is technically surveyed and evaluated before controlled removal in layers with supplementary visual inspection follows. The steps are repeated to the agreed excavation formation. Excavation layers, stop signal, authority to give instructions, reporting channels and documentation are agreed with site management and specialists before work starts. Pure visual observation of the excavation cannot simply replace a necessary instrumental survey. Site management needs a clear description of when specialist works take place, how new findings are handled and which areas remain outstanding.

Agree the approach during construction
Working approach

How FONTANA-EOD works

Document the agreed specialist service clearly

FONTANA-EOD relates the survey to a described intervention and a traceable set of records. Before work starts, the technical task, accessible areas and required results are agreed. If the design or local conditions change, it is checked whether the agreed scope still fits. The report records the work actually performed and its limits. Further construction planning can thus identify what conclusion is available and where additional clarification remains necessary.

Discuss the investigation task

The task before the equipment

A survey begins with the required information objective. The method selected is technically justified in relation to it. A particular instrument or a similar neighbouring construction site is not, by itself, sufficient grounds for selecting a method.

Keep limitations visible

Inaccessible areas and limited conclusions are identified. They do not disappear into a total area figure. Designers and site management can then decide specifically which areas still need attention and when a suitable survey becomes possible.

Clarify changes before intervening in the ground

A new location, additional depth or different construction method is compared with previous results. A familiar project name does not replace this comparison. Feedback is provided before the affected work so that an outstanding question can be included in the sequence.

Hand over the report and plan together

The technical conclusion remains connected to its location references and appendices. A brief summary helps orientation but does not replace the documented survey scope. This basis is retained even if site management or contractors change.

Working together

Distinguish the tasks of client, designers and specialist contractor

Client and operator

The client describes the project and provides the available project records. The operator adds requirements for use, access and timing. A coordinating contact brings the parties together; individual tasks remain assigned to the named parties. Before commissioning, it is clearly recorded what information is missing, who will obtain it and what decision the result is intended to prepare.

Planning and construction management

The specialist designers describe areas, depths, construction methods and changes. Site management coordinates the planned sequence with the construction contractors and agreed specialist works. Results are assigned to the respective intervention. A technical plan change is communicated early enough for its effect on the survey task to be assessed before construction. Organisational construction stage boundaries remain distinguishable from technical survey boundaries.

Specialist company and competent bodies

The private ordnance specialist contractor carries out the agreed survey and documentation scope. Authority requirements and decisions are clarified with the respective competent bodies. The records needed for a particular procedure depend on the site and project. The technical report documents the specialist service performed, including its area, depth and service scope and the limits of its conclusions. Applicability to further groundworks is checked against the specific intervention. Administrative decisions are made by the competent authorities.

In Germany, the Länder ordnance disposal services and locally competent authorities perform hazard prevention and find-handling tasks. Their involvement and the tasks of the public order authority and, where applicable, building control are clarified for the project location. Outside Germany, local responsibilities apply. Contacts, conditions and reporting channels are assigned to the construction project concerned.

Project site

Connect the site with the specific construction task

Illustrated map of Germany with location markers on a construction site.

Site and existing requirements

Specify the actual project site with a location plan and the affected plots. Available information, conditions and reports are assigned to this area. Applicable requirements, competent bodies and the actual survey status for the project location are clarified using local information and project records. The regional overview helps orientation, while the location plan and project records determine the technical task.

Understand the results

Use technical statements for the next decision

Read results together with their scope

A statement is understandable only with its investigation task. Check the area and depth described, methods used and restrictions. A report title or single result line is insufficient. For new work, these details are compared with the current plan to establish which knowledge remains usable and which question is unresolved.

Explore results and terminology

Use project terminology unambiguously

Document review, surveying, construction-phase specialist work and recovery are different tasks. An enquiry need not identify the correct method in advance. An accurate description of the intervention and required decision is more useful. This establishes the appropriate technical scope and prevents a general term from meaning different things in design, procurement and execution.

Understand the service scope
Documents and execution

Consider records and surveying together

Two monitors displaying aerial photographs and maps; further aerial photograph printouts lie on the desk.

Assign records to their locations

For preparation, the location plan and available findings are considered together. Assessment of historical records addresses a different task from a technical survey of the present-day subsurface.

Explore the historical basis
Two people discussing plans at a table beside a vehicle on a construction site.

Use results for construction planning

Survey scope, plan references and limitations are documented together. Site management can identify the specific conclusion available for the next intervention.

Understand documentation
Four people in orange high-visibility vests in front of two excavators on a construction site.
Person with a yellow survey cart on a footpath in front of a hedge.
Questions from planning

Frequently asked questions about construction at an operational site

Can an ambulance station remain in operation during the survey?

This depends on the routes and work areas required, the methods and operational arrangements. The operator specifies its requirements, and the work is coordinated with them. Whether operations can continue unchanged can only be assessed after this coordination.

Are yard areas included in the ordnance assessment for the new building?

They are included insofar as they form part of the agreed survey scope. Planned yard works and utilities should be specified from the outset. An instruction covering the building footprint does not automatically include them.

Must temporary access routes be reported?

Yes, if their construction or use requires preparatory work in the ground. Temporary drainage and surfacing may also affect separate areas. Specify the location and depth of these works so that they can be considered when defining the survey scope.

What should be done if a suspicious object is found during earthworks?

If an unexpected suspicious object is found, stop work in the affected area immediately. Do not touch, move or uncover it further. Leave the immediate area, keep your distance and keep others away without putting yourself at risk. In Germany, call the police immediately on 110; outside Germany, use the local emergency procedure. The competent authorities determine the next steps. Inform site management and the client; internal notification must not delay the emergency call.

What determines the survey workload and costs?

The determining factors are the area, location and depth of building, yard and utility works, ground structure, metal installations, existing utilities and accessibility. Operational traffic routes, preparatory works, temporary arrangements, construction stages, existing findings, required survey methods and documentation scope also matter. The calculation relates to the commissioned survey volume and the services actually needed.

Can a report for the new vehicle hall also be used for the yard?

Only insofar as the planned yard works fall within the documented survey scope. Drainage, utilities and edges may affect different areas or depths. These are checked separately against the report, even if the hall and yard belong to the same site.

What matters when temporary arrangements are needed at short notice?

Describe their construction, including location, depth and necessary ancillary works. Temporary use does not automatically mean a minor or previously surveyed intervention in the ground. Outstanding survey needs are clarified with site management before work starts on the area concerned.

What factors determine the survey window?

In addition to the proposed method, accessibility, installations, necessary preparatory works and operational requirements matter. The operator specifies the routes and times required. A suitable sequence is then agreed with the specialists involved; a fixed time window alone does not replace this preparation.

Project enquiry

Discuss the construction plan and required access routes together

Plan revision and decision deadline

Specify whether the project is at an early planning stage, being prepared for procurement or already approaching an intervention in the ground. The date by which a technical conclusion is required helps coordination. Outstanding information is communicated expressly rather than replaced with assumed values.

Add building sections or depth information, planned external works, existing reports, required traffic routes, the proposed stage sequence and a contact for operational requirements. Mark the first groundworks and necessary temporary arrangements. Also specify which design decisions are already settled and which structures can still change.

The actual intervention areas, proposed depths, surfaces and available working windows are important for estimating the workload. The time at which a technical conclusion is needed is distinguished from the quotation deadline and proposed construction start. For separate hall and external works contracts, a common depiction of interfaces is helpful. The survey scope can thus be related to the current project phase. Outstanding areas between them, or areas accessible only later, are communicated expressly so that their subsequent treatment remains visible in coordination.

Assign records to their locations

Send the location plan and available reports with the relevant appendices. For several construction stages, identify which document belongs to which area. Photos supplement the description of access and existing conditions; they do not replace information on underground structures or proposed depths. For older reports, include the relevant plan appendices with the enquiry. If building designations or stage names have changed, explain the connection to the present design. An overview shows additional work excavations, utility connections and temporary ancillary areas. Unclear depths or variants not yet decided are identified as outstanding. The specialist contractor can then clarify specifically which conclusions from existing records are usable for the current task. The operator's contact explains the actual access conditions, while designers and site management identify the technical interventions. Together, these separate sets of information form the basis for further technical coordination.

Project enquiry

Have your project assessed

Whether historical aerial photograph analysis, explosive ordnance surveying, surface surveying using GPR, magnetometry or TDEM, deep-ground surveys, downhole surveys, excavation supervision, area clearance or ordnance recovery is needed depends on the location, ground disturbance, depth, ground and existing documents. An early ordnance assessment provides clarity for tendering, programming, occupational safety and construction.

FONTANA-EOD combines its Section 7 SprengG licence, specialists holding Section 20 SprengG certificates of competence, suitable survey and clearance methods, and traceable documentation. Send the site plan, depth of ground disturbance, construction phase and existing documents for an initial technical assessment.